    SUMMARY:

    The Coast Guard is adjusting rates for pilotage services on the Great Lakes, which were last amended in March 2014. The adjustments establish new base rates made in accordance with a full ratemaking procedure. Additionally, the Coast Guard exercises the discretion provided by Step 7 of the Appendix A methodology. The result is an upward adjustment to close the gap between revenues projected by this rulemaking and those collected by the pilot associations. Our proposed rates planned to maintain parity with the Canadian Great Lakes Pilotage Authority. While this continues to be our goal, we have since discovered a more significant challenge demonstrated by the recently completed revenue audits. This is a more pressing concern for the operation of safe, efficient, and reliable pilotage service on the Great Lakes than maintaining parity because it demonstrates that the pilot associations are unable to properly fund their operations. Also, we are implementing temporary surcharges to accelerate recoupment of necessary and reasonable training and investment costs for the pilot associations. This final rule promotes the Coast Guard's strategic goal of maritime safety.

    DATES:

    This final rule is effective August 1, 2015.

    ADDRESSES:

    Comments and material received from the public, as well as documents mentioned in this preamble as being available in the docket, are part of docket USCG-2014-0481 and are available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. You may also find this docket on the Internet by going to http://www.regulations.gov,, inserting USCG-2014-0481 in the “Keyword” box, and then clicking “Search.”

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this rule, call or email Mr. Todd Haviland, Director, Great Lakes Pilotage, Commandant (CG-WWM-2), Coast Guard; telephone 202-372-2037, email Todd.A.Haviland@uscg.mil, or fax 202-372-1914. If you have questions on viewing or submitting material to the docket, call Ms. Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Table of Contents for Preamble

    I. Abbreviations

    II. Regulatory History

    III. Basis and Purpose

    IV. Background

    V. Discussion of Comments and Changes

    A. Ratemaking Methodology

    B. AMOU Contracts

    C. Surcharge

    D. Revenue Audits

    E. Pilot Boats

    VI. Summary of the Rule and Discussion of Methodology

    A. Summary of the Rule

    B. Discussion of the Methodology

    VII. Regulatory Analyses

    A. Regulatory Planning and Review

    B. Small Entities

    C. Assistance for Small Entities

    D. Collection of Information

    E. Federalism

    F. Unfunded Mandates Reform Act

    G. Taking of Private Property

    H. Civil Justice Reform

    I. Protection of Children

    J. Indian Tribal Governments

    K. Energy Effects

    L. Technical Standards

    M. Environment

    I. Abbreviations

    AMOU American Maritime Officers Union

    APA American Pilots Association

    CFR Code of Federal Regulations

    CPA Certified public accountant

    CPI Consumer Price Index

    E.O. Executive Order

    FR Federal Register

    GLPA Great Lakes Pilotage Association

    MISLE Marine Information for Safety and Law Enforcement

    MOA Memorandum of Arrangements

    MOU Memorandum of Understanding

    NAICS North American Industry Classification System

    NPRM Notice of proposed rulemaking

    OMB Office of Management and Budget

    ROI Return on investment

    § Section symbol

    U.S.C. United States Code

    WGLPA Western Great Lakes Pilots Association

    II. Regulatory History

    On September 4, 2014, we published a notice of proposed rulemaking (NPRM) titled “Great Lakes Pilotage Rates—2015 Annual Review and Adjustment” in the Federal Register (79 FR 52602). We received 10 submissions on the NPRM from multiple sources, including pilotage associations, pilots, pilot organizations, and shippers. No public meeting was requested and none was held.

    On December 1, 2014, we published the recently completed revenue audits of the pilot associations and reopened the public comment period in the Federal Register (79 FR 71082). We received 5 submissions on the revenue audits.

    III. Basis and Purpose

    The basis of this final rule is the Great Lakes Pilotage Act of 1960 (“the Act”) (46 U.S.C. Chapter 93), which requires U.S. vessels operating “on register” [1] and foreign vessels to use U.S. or Canadian registered pilots while transiting the U.S. waters of the St. Lawrence Seaway and the Great Lakes Start Printed Page 10366system. 46 U.S.C. 9302(a)(1). The Act requires the Secretary to “prescribe by regulation rates and charges for pilotage services, giving consideration to the public interest and the costs of providing the services.” 46 U.S.C. 9303(f). Rates must be established or reviewed and adjusted each year, not later than March 1. Base rates must be established by a full ratemaking at least once every 5 years, and in years when base rates are not established, they must be reviewed and, if necessary, adjusted. Id. The Secretary's duties and authority under the Act have been delegated to the Coast Guard. Department of Homeland Security Delegation No. 0170.1, paragraph (92)(f). Coast Guard regulations implementing the Act appear in parts 401 through 404 of Title 46, Code of Federal Regulations (CFR). Procedures for use in establishing base rates appear in 46 CFR part 404, Appendix A, and procedures for annual review and adjustment of existing base rates appear in 46 CFR part 404, Appendix C.

    The purpose of this final rule is to establish new base pilotage rates, using the methodology found in 46 CFR part 404, Appendix A.

    IV. Background

    The vessels affected by this final rule are those engaged in foreign trade upon the U.S. waters of the Great Lakes. United States and Canadian “lakers,” [2] which account for most commercial shipping on the Great Lakes, are not affected. 46 U.S.C. 9302.

    The U.S. waters of the Great Lakes and the St. Lawrence Seaway are divided into three pilotage districts. Pilotage in each district is provided by an association certified by the Coast Guard Director of Great Lakes Pilotage to operate a pilotage pool. It is important to note that we do not control the actual compensation that pilots receive. The actual compensation is determined by each of the three district associations, which use different compensation practices.

    District One, consisting of Areas 1 and 2, includes all U.S. waters of the St. Lawrence River and Lake Ontario. District Two, consisting of Areas 4 and 5, includes all U.S. waters of Lake Erie, the Detroit River, Lake St. Clair, and the St. Clair River. District Three, consisting of Areas 6, 7, and 8, includes all U.S. waters of the St. Mary's River, Sault Ste. Marie Locks, and Lakes Michigan, Huron, and Superior. Area 3 is the Welland Canal, which is serviced exclusively by the Canadian Great Lakes Pilotage Association (GLPA) and, accordingly, is not included in the United States rate structure. Areas 1, 5, and 7 have been designated by Presidential Proclamation, pursuant to the Act, to be waters in which pilots must, at all times, be fully engaged in the navigation of vessels in their charge. Areas 2, 4, 6, and 8 have not been so designated because they are open bodies of water. While working in those undesignated areas, pilots must only “be on board and available to direct the navigation of the vessel at the discretion of and subject to the customary authority of the master.” 46 U.S.C. 9302(a) (1) (B).

    This final rule is a full ratemaking to establish new base pilotage rates, using the methodology found in 46 CFR part 404, Appendix A (hereafter “Appendix A”). The last full ratemaking established the current base rates in March 2014 (79 FR 12084; Mar. 4, 2014). Among other things, the Appendix A methodology requires us to review detailed pilot association financial information, and we contract with independent accountants to assist in that review. We have now completed our review of the independent accountants' 2012 financial reports. The comments by the pilot associations on those reports and the independent accountants' final findings are discussed in our document titled “Summary—Independent Accountant's Report on Pilot Association Expenses, with Pilot Association Comments and Accountant's Responses,” which appears in the docket. In addition, we also use the independent accountant's review of pilot association revenues. The review, contracted by the Coast Guard, confirms the revenues of the pilot associations and it establishes a baseline of comparison between actual collected revenues and those projected by the rulemaking. The revenue reports also appear in the docket.

    V. Discussion of Comments and Changes

    We received 10 public submissions in response to the initial public comment period of our NPRM.

    In the NPRM, the Coast Guard proposed a 2.5 percent across the board rate increase for the three pilotage districts and varying surcharge levels across the three districts. However, due to the completion of the revenue audits during the initial comment period, the Coast Guard extended the comment period for 30 days for the public to comment on the revenue audits. We received an additional five comments to our supplementary comment period focusing on the revenue audits. Of all the comments we received, 10 came from pilots or pilot associations, 3 came from industry groups, and 2 came from the union whose contract data provides benchmark data for pilot compensation.

    Based on the comments and revenue audits, the Coast Guard is implementing a 10 percent across the board rate increase for the three pilotage districts and a 10 percent surcharge for each district. The reasoning behind the changes follows. Any further changes involving the Appendix A methodology will be published for notice and comment in a future rulemaking.

    A. Ratemaking Methodology

    Three commenters questioned various aspects of the ratemaking methodology. First, a pilot from the Western Great Lakes Pilots Association (WGLPA) questioned the application of bridge hours, as well as what the definition should include. We are currently working with the pilots, industry, and the American Pilots Association to finalize a new model to gauge necessary pilot strength. We plan to propose this model in a future rulemaking. We believe this coordinated, thorough process is needed to address the longstanding challenges with pilot recruitment and retention on the Great Lakes. Another pilot suggested that we need to incorporate multiple years of inflation in the rate to compensate for the time lapse between the conduct of the audits and the effective date of the rate. Under Step 1.C of the Appendix A methodology, the adjustment for inflation or deflation is a 1-year adjustment between the reported year (the audit year) and the succeeding navigation season. As we have stated in previous rulemakings, we are unable to incorporate a multiyear adjustment in the current methodology. We will consider changing this step in a future rulemaking.

    Also, the same commenter questioned our application of benefits to the American Maritime Officers Union (AMOU) contract. This is a longstanding issue and the commenter argues that we should multiply first mate wages and benefits by 150 percent to determine designated waters compensation. We disagree and continue to maintain that the 150 percent applies only to wages; benefits are then added to the result. As part of our extensive review of the Appendix A methodology, we are actively seeking alternative compensation benchmarks to the AMOU contracts. Another commenter believes that compensation must exceed that of the AMOU in order to successfully recruit future pilots. We Start Printed Page 10367agree that actual pilot compensation should be sufficient to attract and retain U.S. Registered Pilots and we are actively pursuing alternatives to the AMOU contracts for a new pilot compensation standard. Two commenters suggested that the pilot strength called for in the rate is inadequate. As discussed previously, we believe the current bridge hour standard is not an effective means of establishing pilot strength. We plan to continue efforts to develop a new pilot strength model based on feedback from the stakeholders and will provide it for public comment in a future rulemaking. Another commenter questioned the effective date of the rate, saying that the rate should go into effect at the start of the season instead of aligning with the union contract start date of August 1. Since the AMOU contracts are part of the current Appendix A methodology, August 1 continues to be the effective date of the rate. We are open to adjusting the effective date of the rate in a future rulemaking in coordination with our expansive review of the methodology if doing so will enhance the delivery of safe, efficient, and reliable service.

    Additionally, five commenters questioned use of our discretion under Step 7 of the Appendix A methodology. Two of those commenters, a member of industry and a pilot, disagree with our basis for Step 7 adjustments, citing insufficient support for our justification of parity adjustments under the Memorandum of Arrangements/Memorandum of Understanding (MOA/MOU) with Canada and Executive Order (E.O.) 13609. We disagree. The purpose of the MOA/MOU and E.O. 13609 is to work to better align U.S. and Canadian regulatory schemes. We agree that the new MOU has a less strict interpretation of parity, seeking comparable rates over identical ones. However, we believe that the revenue shortfall against projections uncovered in the recently completed audits calls for action. Our actions to seek comparable rates are undercut by overprojections and the inability of the current billing scheme to generate sufficient revenue to operate the pilotage associations. The third commenter, also a member of industry, asserts that the results of our calculations represent a “serious flaw” in the methodology. We plan to address the challenges with the current methodology in a future rulemaking. We neither believe the calculations resulting from the methodology in this rule are representative of economic conditions in the Great Lakes region, nor do they represent increased efficiencies of the pilot organizations. As such, we continue to utilize our Step 7 discretion to adjust them.

    Another commenter stated that the Canadian GLPA is actually raising their rates only 1 percent rather than 2.5 percent as stated in the NPRM. While we continue to strive for comparability with Canadian rates, our greater concern currently is the gap in revenue. Thus, we seek to actively close the confirmed revenue gap between pilot association collections and Coast Guard projections by increasing the rate. The gap highlighted in the revenue audits points to an even greater disparity between U.S. and Canadian rates on the Great Lakes that must be addressed.

    This leads into a discussion of the final commenter on the ratemaking methodology. The remaining commenter highlights the gap between revenues projected in the rate and those actually collected by the pilot association, as well as the second and third order effects of that gap. Based on a review of the recently completed revenue audits, we agree with the commenter that the gap between revenue projections in the rate and the revenues actually collected by the pilot associations presents an untenable situation. The revenue projections in the rate for each pilot association directly impact each association's ability to provide safe, efficient, and reliable service. Since the actual revenues collected by the associations fall well short of our projections, we are utilizing our Step 7 discretion to increase the rates in all areas by 10 percent. This rate increase will begin to address the significant shortfall in pilotage revenue against our projections. We believe that the current shortfall in revenue is a result of both bridge hour projections and a billing scheme that is not properly baselined to collect appropriate revenue. Rate increases to address the shortfall will continue to be separate and distinct from the temporary surcharges applied in the districts for training and investments.

    B. AMOU Contracts

    Five commenters-three pilots or pilots' representatives and two officials from the AMOU-addressed our use of AMOU contracts to estimate average annual compensation for U.S. Registered Pilots in Step 2.A of our Appendix A ratemaking methodology. Since the application of these contracts is currently the subject of pending litigation, we refrain from addressing these comments and will continue to utilize the AMOU contract data as we did in the 2013 and 2014 ratemakings.

    C. Surcharge

    Eight commenters-seven pilots or pilot associations and one member of industry-addressed the proposed surcharges in the NPRM. We received a comment from the Lakes Pilots Association, Inc. supporting the proposed surcharge for District Two. Commenters from both District One and District Three stated that they require two additional pilot applicants each above their authorized strength to deal with personnel turnover. We agree with both commenters. The pilotage associations are facing a wave of retirements, both expected and unexpected, and these additional applicant pilots are necessary to ensure the system continues to operate smoothly. The long lead time for pilot training necessitates that the pilot associations begin training now to address current pilot retirements as well as those projected for the next 24 months. Thus, we are using our surcharge authority to fund applicant pilots that exceed the current authorized pilot strength of the associations. Based on how three associations plan to compensate the applicants and the costs associated with training, we have estimated that a 5 percent surcharge is necessary to fund each applicant pilot. As you will see in the following discussion, we have established a 10 percent surcharge for each district in order to accelerate the costs associated with training 2 applicant pilots.

    In the case of District One, we agree with the need for two applicant pilots above their authorized strength of 11 pilots to ensure safe, efficient, and reliable pilotage service. To fund these applicant pilots, we will increase their authorized surcharge to 10 percent.

    We also agree with the need for two applicant pilots above their authorized strength of 15 pilots to ensure safe, efficient, and reliable pilotage service in District Three. Accordingly, we will fund two additional applicants above their authorized pilot strength and increase their authorized surcharge to 10 percent. As mentioned above, in conjunction with stakeholders, we are developing a new pilotage strength model that we will provide for public comment in a future rulemaking.

    Finally, a member of industry questioned the need for pilot training surcharges and the authority to charge for expenses not yet incurred. The Coast Guard has the authority to prescribe rates and charges pursuant to 46 U.S.C. 9303. Temporary surcharge authority was implemented through regulation in the 2014 ratemaking cycle. See 78 FR 48376. The surcharges include funds for Start Printed Page 10368professional training, investments in pilotage technology, and the costs to train and fund six new applicant pilots across the system. These applicants will all be in place for the 2015 shipping season and thus, through the temporary surcharge, the Coast Guard is accelerating recoupment of these important expenses. We fully support investments in professional development and technology to enhance the safety, reliability, and efficiency of the system. Further, we believe the recruitment, funding, and training of applicant pilots before the retirement of current registered pilots is essential to the stability of the system and to achieve and maintain acceptable levels of service. Any overages in surcharge collection against the actual costs will be adjusted in the next year's rate. We discuss surcharges further in Part VI after our discussion of other comments.

    D. Revenue Audits

    We received three comments on the revenue audits—two from pilots and one from industry. Both pilot commenters approved of the revenue audits and asked the Coast Guard to adjust for the differences between actual and projected revenues. We agree with these comments and have adjusted our rate increase to 10 percent across all districts to begin aligning actual and projected revenues. Our discussion in Step 7 provides additional discussion on this topic. It is clear that the audits for the 2013 Appendix A rulemaking demonstrate a significant shortfall. Since we only have a single data point, we plan to increase the base rate to fill this gap over a multi-year period. Ten percent is reasonable because this is greater than inflation and begins to align the revenues needed to provide safe, efficient, and reliable service with the actual revenues that our rulemakings generate. We will also work to address this discrepancy in a future rulemaking regarding the methodology. We discuss this further in Step 7 of the methodology. The industry commenter disapproves of the open-ended nature of the comment period, seeking further clarity regarding our plan for use of the revenue audits and a better explanation of our use of discretion. We disagree. The comment period was set up to allow access by all parties to the revenue audits and to provide feedback to the Coast Guard regarding their review and incorporation into the ratemaking methodology. The revenue audits clearly point to a shortcoming in the billing scheme and methodology that significantly reduces actual revenue. Failure to act on the revenue audits would ignore the point “and other supportable economic factors” in Step 7 of the methodology. While we do not propose a solution for the methodology in this rulemaking, we are working to develop new proposals to address the significant hindrances of the current methodology. The discretion exercised in Step 7 seeks to maintain safe, efficient, and reliable pilotage service while we prepare a future rulemaking to address the current methodology.

    E. Pilot Boats

    We received two comments regarding purchase of new pilot boats. District Two submitted information regarding the purchase of a new boat for use in Detroit for consideration in the rate. However, based on the documents submitted, the pilots have reached an agreement with the Canadian GLPA and industry to fund the pilot boat through usage fees, not through the rate. As a result, the expenses associated with the new pilot boat will not be included in the 2015 rate. Similarly, a pilot from the WGLPA believes that infrastructure investment in a new dock and new pilot boat near Sault Sainte Marie, MI should be included in the rate. We disagree. Like District Two, the letter of intent signed between the WGLPA and the Canadian GLPA plans to recoup the cost of their infrastructure improvement through levied pilot boat fees, not the pilotage rate. We support and encourage the investment of both associations in badly needed infrastructure and capital assets but cannot allow recoupment of expenses already marked to be paid by industry separately.

    VI. Summary of the Rule and Discussion of Methodology

    A. Summary of the Rule

    We are establishing new base pilotage rates in accordance with the methodology outlined in Appendix A to 46 CFR part 404. The new rates will be established by March 1, 2015 and become effective August 1, 2015. Our calculations under Steps 1 through 6 of Appendix A would result in an average 12 percent rate decrease. This rate decrease is not the result of increased efficiencies in providing pilotage services but rather is a result of changes to AMOU contract data.

    Additionally, the recently completed revenue audits demonstrate a significant shortfall between revenues projected by the Coast Guard using the Appendix A methodology and those actually captured by the current billing scheme. This gap, explained further in our Step 7 discussion, demonstrates that a more significant rate increase is necessary to promote a standard safe, efficient, and reliable pilotage service by ensuring the pilot associations have sufficient actual revenue to continue operations. Therefore, we will continue to exercise the discretion outlined in Step 7, increasing rates by 10 percent to begin closing the gap between projected revenues and those actually collected by the pilot associations. Table 1 shows the percent change for the new rates for each area.

    Secondly, we are implementing temporary surcharges for the pilot associations to recoup necessary and reasonable training and investment expenses incurred or that are expected to be incurred prior to the required March 1, 2015 publication of the final rule. Normally, these expenses would not be recognized until the 2016 annual ratemaking or later. By authorizing the temporary surcharges now, this action will accelerate the reimbursement for necessary and reasonable training and investment expenses. The surcharge will be authorized for the duration of the 2015 shipping season, which begins in March 2015. The value of the surcharges is based on the audited revenues of the pilot associations and the identified need to train two additional pilot applicants per District. This action will merely accelerate the recoupment of these expenses. At the conclusion of the 2015 shipping season, we would account for the monies generated by the surcharge and make adjustments as necessary to the operating expenses for the following year.

    In District One, we are implementing a temporary surcharge of 10 percent to compensate pilots for $28,028.91 that the District One pilot association spent on training in 2013 and early 2014, as well as the anticipated $300,000 cost to train two new applicant pilots and prepare replacements for retiring pilots. We believe this training is necessary and reasonable to promote safe, efficient, and reliable pilotage on the Great Lakes and support the St. Lawrence Seaway Pilots Association's continued commitment to the training and professional development of their pilots.

    Additionally, we are implementing a temporary surcharge of 10 percent in District Two to compensate pilots for $300,000 that the District Two pilot association spent training two applicant pilots in 2014. This is necessary and reasonable to allow the association to bring on new pilots in the face of upcoming retirements without adjusting the pilotage needs as determined by the ratemaking methodology. This surcharge will also accelerate the Start Printed Page 10369repayment of the association's investment in upgraded technology ($25,829.80) to enhance the situational awareness of pilots on the bridge. We believe this needed technology will assist in the safety, efficiency, and reliability of the system.

    Next, we are implementing a temporary surcharge of 10 percent in District Three to compensate pilots for $26,950 that the District Three pilot association plans to spend on training at the conclusion of the 2014 shipping season. We believe this training is necessary and reasonable for the provision of safe pilotage service. This also compensates District Three for the anticipated $300,000 cost of training two additional pilot applicants to increase pilot strength and advance safe, efficient, and reliable pilotage service in the district.

    All figures in the tables that follow are based on calculations performed either by an independent accountant or by the Director's [3] staff. In both cases, those calculations were performed using common commercial computer programs. Decimalization and rounding of the audited and calculated data affects the display in these tables but does not affect the calculations. The calculations are based on the actual figures, which are rounded for presentation in the tables.

    Table 1—Summary of Rate Adjustments Based on Step 7 Discretion

    If pilotage service is required in:Then the percent change over the current rate is:
    Area 1 (Designated waters)10
    Area 2 (Undesignated waters)10
    Area 4 (Undesignated waters)10
    Area 5 (Designated waters)10
    Area 6 (Undesignated waters)10
    Area 7 (Designated waters)10
    Area 8 (Undesignated waters)10

    B. Discussion of the Methodology

    The Appendix A methodology provides seven steps, with sub-steps, for calculating rate adjustments. The following discussion describes those steps and sub-steps, and includes tables showing how we have applied them to the 2012 financial information supplied by the pilots association.

    Step 1: Projection of Operating Expenses. In this step, we project the amount of vessel traffic annually. Based on that projection, we forecast the amount of necessary and reasonable operating expenses that pilotage rates should recover.

    Step 1.A: Submission of Financial Information. This sub-step requires each pilot association to provide us with detailed financial information in accordance with 46 CFR part 403. The associations complied with this requirement, supplying 2012 financial information in 2013. This is the most current and complete data set we have available.

    Step 1.B: Determination of Recognizable Expenses. This sub-step requires us to determine which reported association expenses will be recognized for ratemaking purposes, using the guidelines shown in 46 CFR 404.5. We contracted with an independent accountant to review the reported expenses and submit findings recommending which reported expenses should be recognized. The accountant also reviewed which reported expenses should be adjusted prior to recognition or disallowed for ratemaking purposes. The accountant's preliminary findings were sent to the pilot associations, they reviewed and commented on those findings, and the accountant then finalized the findings. The Director reviewed and accepted the final findings, resulting in the determination of recognizable expenses. The preliminary findings, the associations' comments on those findings, and the final findings are all discussed in the “Summary—Independent Accountant's Report on Pilot Association Expenses, with Pilot Association Comments and Accountant's Responses,” which appears in the docket. Tables 2 through 4 show each association's recognized expenses.

    Table 2—Recognized Expenses for District One

    Reported expenses for 2012Area 1Area 2Total
    St. Lawrence RiverLake Ontario
    Operating Expenses:
    Other Pilotage Costs:
    Pilot subsistence/Travel$227,199$137,315$364,514
    License insurance000
    Payroll taxes62,03848,452110,490
    Other5965491,145
    Total Other Pilotage Costs289,833186,316476,149
    Pilot Boat and Dispatch Costs:
    Pilot boat expense108,53995,405203,944
    Dispatch expense000
    Payroll taxes13,42911,80425,233
    Start Printed Page 10370
    Total Pilot and Dispatch Costs121,968107,209229,177
    Administrative Expenses:
    Legal—general counsel1,3691,2812,650
    Legal—lobbying3,9573,4787,435
    Insurance21,90718,99840,905
    Employee benefits21,28118,50939,790
    Payroll taxes000
    Other taxes18,49115,80134,292
    Travel473416889
    Depreciation/Auto leasing/Other38,34633,70572,051
    Interest15,48413,61029,094
    Dues and subscriptions13,74010,24023,980
    Utilities4,5493,8978,446
    Salaries48,83742,92791,764
    Accounting/Professional fees4,6834,3179,000
    Pilot Training26,35321,96148,314
    Other10,6898,97419,663
    Total Administrative Expenses230,159198,114428,273
    Total Operating Expenses641,960491,6391,133,599
    Adjustments (Independent certified public accountant (CPA)):
    Pilotage subsistence/Travel(887)(779)(1,666)
    Payroll taxes(13,719)(12,058)(25,777)
    Dues and subscriptions(13,740)(10,240)(23,980)
    TOTAL CPA ADJUSTMENTS(28,346)(23,077)(51,423)
    Adjustments (Director):
    American Pilots Association (APA) Dues11,6798,70420,383
    Pilot Training (surcharge)(26,353)(21,961)(48,314)
    Legal—lobbying(3,957)(3,478)(7,435)
    TOTAL DIRECTOR ADJUSTMENTS(18,631)(16,735)(35,366)
    Total Operating Expenses594,983451,8271,046,810
    Note: Numbers may not total due to rounding.

    Table 3—Recognized Expenses for District Two

    Reported Expenses for 2012Area 4Area 5Total
    Lake ErieSoutheast Shoal to Port Huron, MI
    Operating Expenses:
    Other Pilotage Costs:
    Pilot subsistence/Travel86,947130,421217,368
    License insurance6,1689,25215,420
    Payroll taxes42,21863,328105,546
    Other23,88835,83359,721
    Total Other Pilotage Costs159,221238,834398,055
    Pilot Boat and Dispatch Costs:
    Pilot boat expense131,285196,930328,215
    Dispatch expense6,6009,90016,500
    Employee Benefits48,31072,465120,775
    Payroll taxes7,41211,11918,531
    Total Pilot and Dispatch Costs193,607290,414484,021
    Administrative Expenses:
    Legal—general counsel2,0543,0825,136
    Legal—lobbying2,7044,0556,759
    Legal—litigation6,4889,73316,221
    Office rent26,27539,41365,688
    Insurance10,68216,02426,706
    Employee benefits16,45224,67841,130
    Payroll taxes4,1436,21610,359
    Other taxes12,54618,81931,365
    Start Printed Page 10371
    Depreciation/Auto leasing/Other9,07413,61022,684
    Interest2,9894,4837,472
    Utilities13,91720,87634,793
    Salaries36,25254,37790,629
    Accounting/Professional fees11,76417,64629,410
    Pilot Training000
    Other9,40514,10823,513
    Total Administrative Expenses164,745247,120411,865
    Total Operating Expenses517,573776,3681,293,941
    Adjustments (Independent CPA):
    Pilot subsistence/Travel(1,982)(2,974)(4,956)
    Employee benefits(3,585)(5,378)(8,963)
    TOTAL CPA ADJUSTMENTS(5,567)(8,352)(13,919)
    Adjustments (Director):
    Federal Tax Allowance(5,200)(7,800)(13,000)
    APA Dues7,34411,01618,360
    Legal—lobbying(2,704)(4,055)(6,759)
    Legal—litigation(6,488)(9,733)(16,221)
    TOTAL DIRECTOR ADJUSTMENTS(7,048)(10,572)(17,620)
    Total Operating Expenses504,958757,4441,262,402
    Note: Numbers may not total due to rounding.

    Table 4—Recognized expenses for District Three

    Reported expenses for 2012Area 6Area 7Area 8Total
    Lakes Huron and MichiganSt. Mary's RiverLake Superior
    Operating Expenses:
    Other Pilotage Costs:
    Pilot subsistence/Travel$180,316$77,278$110,398$367,992
    License insurance8,8593,7975,42418,080
    Payroll taxes0000
    Other2,8751,2321,7605,867
    Total Other Pilotage Costs192,05082,307117,582391,939
    Pilot Boat and Dispatch Costs:
    Pilot boat expense261,937112,259160,370534,566
    Dispatch expense81,95835,12550,178167,261
    Payroll taxes8,2033,5155,02216,740
    Total Pilot Boat and Dispatch Costs352,098150,899215,570718,567
    Administrative Expenses:
    Legal—lobbying4,3041,8452,6358,784
    Office rent4,8512,0792,9709,900
    Insurance6,4692,7733,96113,203
    Employee benefits77,34833,14947,356157,854
    Payroll taxes5,4042,3163,30911,029
    Other taxes9414035761,920
    Depreciation/Auto leasing17,4627,48410,69135,637
    Interest2,6921,1541,6485,494
    Utilities20,9508,97912,82742,756
    Salaries54,00323,14433,063110,210
    Accounting/Professional fees13,1575,6398,05526,851
    Pilot Training0000
    Other4,6571,9962,8519,504
    Total Administrative Expenses212,23890,961129,942433,141
    Total Operating Expenses756,386324,167463,0941,543,647
    Adjustments (Independent CPA):
    Pilot subsistence/travel(5,303)(2,273)(3,247)(10,823)
    Start Printed Page 10372
    Payroll taxes44,61319,12027,31491,046
    Other taxes(1,761)(755)(1,078)(3,594)
    Other(637)(273)(390)(1,300)
    TOTAL CPA ADJUSTMENTS36,91215,81922,59975,329
    Adjustments (Director):
    APA dues11,6955,0127,16023,868
    Legal—lobbying(4,304)(1,845)(2,635)(8,784)
    TOTAL DIRECTOR ADJUSTMENTS7,3913,1674,52515,084
    Total Operating Expenses800,689343,153490,2181,634,060
    Note: Numbers may not total due to rounding.

    Step 1.C: Adjustment for Inflation or Deflation. In this sub-step, we project rates of inflation or deflation for the succeeding navigation season. Because we used 2012 financial information, the “succeeding navigation season” for this ratemaking is 2013. We based our inflation adjustment of 1.4 percent on the 2013 change in the Consumer Price Index (CPI) for the Midwest Region of the United States, which can be found at http://www.bls.gov/​xg_​shells/​ro5xg01.htm. This adjustment appears in Tables 5 through 7.

    The Coast Guard is aware that the current annual adjustment for inflation does not account for the value of money over time. We are working on a solution to allow for a better approximation of actual costs.

    Table 5—Inflation Adjustment, District One

    Reported expenses for 2012Area 1Area 2Total
    St. Lawrence RiverLake Ontario
    Total Operating Expenses:$594,983$451,827$1,046,810
    2013 change in the CPI for the Midwest Region of the United States×.014×.014×.014
    Inflation Adjustment=$8,330=$6,326=$14,655

    Table 6—Inflation Adjustment, District Two

    Reported expenses for 2012Area 4Area 5Total
    Lake ErieSoutheast Shoal to Port Huron, MI
    Total Operating Expenses$504,958$757,444$1,262,402
    2013 change in the CPI for the Midwest Region of the United States×.014×.014×.014
    Inflation Adjustment=$7,069=$10,604=$17,674

    Table 7—Inflation adjustment, District Three

    Reported expenses for 2012Area 6Area 7Area 8Total
    Lakes Huron and MichiganSt. Mary's RiverLake Superior
    Total Operating Expenses$800,689$343,153$490,218$1,634,060
    2013 change in the CPI for the Midwest Region of the United States×.014×.014×.014×.014
    Inflation Adjustment=$11,210=$4,804=$6,863=$22,877

    Step 1.D: Projection of Operating Expenses. In this final sub-step of Step 1, we project the operating expenses for each pilotage area on the basis of the preceding sub-steps and any other foreseeable circumstances that could affect the accuracy of the projection.

    For District One, the projected operating expenses are based on the calculations from Steps 1.A through 1.C. Table 8 shows these projections.Start Printed Page 10373

    Table 8—Projected Operating Expenses, District One

    Reported expenses for 2012Area 1Area 2Total
    St. Lawrence RiverLake Ontario
    Total operating expenses$594,983$451,827$1,046,810
    Inflation adjustment 1.4%+$8,330+$6,326+$14,655
    Total projected expenses for 2015 pilotage season=$603,313=$458,153=$1,061,465
    Note: Numbers may not total due to rounding.

    In District Two the projected operating expenses are based on the calculations from Steps 1.A through 1.C. Table 9 shows these projections.

    Table 9—Projected Operating Expenses, District Two

    Reported expenses for 2012Area 4Area 5Total
    Lake ErieSoutheast Shoal to Port Huron, MI
    Total Operating Expenses$504,958$757,444$1,262,402
    Inflation adjustment 1.4%+7,069+10,604+17,674
    Total projected expenses for 2015 pilotage season=512,027=768,048=1,280,076

    In District Three, projected operating expenses are based on the calculations from Steps 1.A through 1.C. Table 10 shows these projections.

    Table 10—Projected Operating Expenses, District Three

    Reported expenses for 2012Area 6Area 7Area 8Total
    Lakes Huron and MichiganSt. Mary's RiverLake Superior
    Total Expenses$800,689$343,153$490,218$1,634,060
    Inflation adjustment 1.4%+11,210+4,804+6,863+22,877
    Total projected expenses for 2015 pilotage season=811,899=347,957=497,081=1,656,937

    Step 2: Projection of Target Pilot Compensation. In Step 2, we project the annual amount of target pilot compensation that pilotage rates should provide in each area. These projections are based on our latest information on the conditions that will prevail in 2015.

    Step 2.A: Determination of Target Rate of Compensation. Target pilot compensation for pilots in undesignated waters approximates the average annual compensation for first mates on U.S. Great Lakes vessels. Compensation is determined based on the most current union contracts and includes wages and benefits received by first mates. We calculate target pilot compensation on designated waters by multiplying the average first mates' wages by 150 percent and then adding the average first mates' benefits.

    We rely upon union contract data provided by the AMOU, which has agreements with three U.S. companies engaged in Great Lakes shipping. We derive the data from two separate AMOU contracts—we refer to them as Agreements A and B—and apportion the compensation provided by each agreement according to the percentage of tonnage represented by companies under each agreement. Agreement A applies to vessels operated by Key Lakes, Inc., and Agreement B applies to vessels operated by American Steamship Co. and Mittal Steel USA, Inc.

    Agreements A and B both expire on July 31, 2016. The AMOU has set the daily aggregate rate, including the daily wage rate, vacation pay, pension plan contributions, and medical plan contributions effective August 1, 2015, as follows: (1) In undesignated waters, $632.12 for Agreement A and $624.34 for Agreement B; and (2) In designated waters, $870.05 for Agreement A and $856.42 for Agreement B.

    Because we are interested in annual compensation, we must convert these daily rates. We use a 270-day multiplier which reflects an average 30-day month, over the 9 months of the average shipping season. Table 11 shows our calculations using the 270-day multiplier.

    Table 11—Projected Annual Aggregate Rate Components

    Aggregate Rate-Wages and Vacation, Pension, and Medical Benefits
    Pilots on undesignated waters
    Agreement A:
    $632.12 daily rate × 270 days$170,672.40
    Start Printed Page 10374
    Agreement B:
    $624.34 daily rate × 270 days168,571.80
    Pilots on designated waters
    Agreement A:
    $870.05 daily rate × 270 days234,913.50
    Agreement B:
    $856.42 daily rate × 270 days231,233.40

    We apportion the compensation provided by each agreement according to the percentage of tonnage represented by companies under each agreement. Agreement A applies to vessels operated by Key Lakes, Inc., representing approximately 30 percent of tonnage, and Agreement B applies to vessels operated by American Steamship Co. and Mittal Steel USA, Inc., representing approximately 70 percent of tonnage. Table 12 provides details.

    Table 12—Shipping Tonnage Apportioned by Contract

    CompanyAgreement AAgreement B
    American Steamship Company815,600
    Mittal Steel USA, Inc38,826
    Key Lakes, Inc361,385
    Total tonnage, each agreement361,385854,426
    Percent tonnage, each agreement361,385 ÷ 1,215,811 = 29.7238%854,426 ÷ 1,215,811 = 70.2762%

    We use the percentages from Table 12 to apportion the projected compensation from Table 11. This gives us a single tonnage-weighted set of figures. Table 13 shows our calculations.

    Table 13—Tonnage-Weighted Wage and Benefit Components

    Undesignated watersDesignated waters
    Agreement A:
    Total wages and benefits$170,672.40$234,913.50
    Percent tonnage×29.7238%×29.7238%
    Total=$50,730=$69,825
    Agreement B:
    Total wages and benefits$168,571.80$231,233.40
    Percent tonnage×70.2762%×70.2762%
    Total=$118,466=$162,502
    Projected Target Rate of Compensation:
    Agreement A total weighted average wages and benefits$50,730$69,825
    Agreement B total weighted average wages and benefits+$118,466+$162,502
    Total=$169,196=$232,327

    Step 2.B: Determination of the Number of Pilots Needed. Subject to adjustment by the Director to ensure uninterrupted service or for other reasonable circumstances, we determine the number of pilots needed for ratemaking purposes in each area through dividing projected bridge hours for each area by either the 1,000 (designated waters) or 1,800 (undesignated waters) bridge hours specified in Step 2.B. We round the mathematical results and express our determination as a whole number of pilots.

    According to 46 CFR part 404, Appendix A, Step 2.B(1), bridge hours are the number of hours a pilot is aboard a vessel providing pilotage service. For that reason, and as we explained most recently in the 2011 ratemaking's final rule (76 FR 6351 at 6352 col. 3 (Feb. 4, 2011)), we do not include, and never have included, pilot delay, detention, or cancellation in calculating bridge hours. Projected bridge hours are based on the vessel traffic that pilots are expected to serve. We use historical data, input from the pilots and industry, periodicals and trade magazines, and information from conferences to project demand for pilotage services for the coming year.

    In our 2014 final rule, we determined that 36 pilots would be needed for ratemaking purposes. For 2015, we project 36 pilots is still the proper number to use for ratemaking purposes. The total pilot authorization strength includes five pilots in Area 2, where rounding up alone would result in only four pilots. For the same reasons we explained at length in the 2008 ratemaking final rule (74 FR 220 at 221-22 (Jan. 5, 2009)), we have determined that this adjustment is essential for Start Printed Page 10375ensuring uninterrupted pilotage service in Area 2. Table 14 shows the bridge hours we project will be needed for each area and our calculations to determine the whole number of pilots needed for ratemaking purposes.

    Table 14—Number of Pilots Needed

    Pilotage areaProjected 2015 bridge hoursDivided by 1,000 (designated waters) or 1,800 (undesignated waters)Calculated value of pilot demandPilots needed (total = 36)
    Area 1 (Designated waters)5,116÷1,000=5.1166
    Area 2 (Undesignated waters)5,429÷1,800=3.0165
    Area 4 (Undesignated waters)5,814÷1,800=3.2304
    Area 5 (Designated waters)5,052÷1,000=5.0526
    Area 6 (Undesignated waters)9,611÷1,800=5.3396
    Area 7 (Designated waters)3,023÷1,000=3.0234
    Area 8 (Undesignated waters)7,540÷1,800=4.1895

    Step 2.C: Projection of Target Pilot Compensation. In Table 15, we project total target pilot compensation separately for each area by multiplying the number of pilots needed in each area, as shown in Table 14, by the target pilot compensation shown in Table 13.

    Table 15—Projection of Target Pilot Compensation by Area

    Pilotage areaPilots needed (total = 36)Target rate of pilot compensationProjected target pilot compensation
    Area 1 (Designated waters)6×$232,327=$1,393,964
    Area 2 (Undesignated waters)5×169,196=845,981
    Area 4 (Undesignated waters)4×169,196=676,785
    Area 5 (Designated waters)6×232,327=1,393,964
    Area 6 (Undesignated waters)6×169,196=1,015,177
    Area 7 (Designated waters)4×232,327=929,309
    Area 8 (Undesignated waters)5×169,196=845,981
    Note: Numbers may not total due to rounding.

    Steps 3 and 3.A: Projection of Revenue. In Steps 3 and 3.A., we project the revenue that would be received in 2015 if demand for pilotage services matches the bridge hours we projected in Table 14, and if 2014 pilotage rates are left unchanged. Table 16 shows this calculation.

    Table 16—Projection of Revenue by Area

    Pilotage areaProjected 2015 bridge hours2014 Pilotage ratesRevenue projection for 2015
    Area 1 (Designated waters)5,116×$472.50=$2,417,285
    Area 2 (Undesignated waters)5,429×291.96=1,585,032
    Area 4 (Undesignated waters)5,814×210.40=1,223,262
    Area 5 (Designated waters)5,052×521.64=2,635,314
    Area 6 (Undesignated waters)9,611×204.95=1,969,800
    Area 7 (Designated waters)3,023×495.01=1,496,427
    Area 8 (Undesignated waters)7,540×191.34=1,442,677
    Total12,769,797
    Note: Numbers may not total due to rounding.

    Step 4: Calculation of Investment Base. In this step, we calculate each association's investment base, which is the recognized capital investment in the assets employed by the association to support pilotage operations. This step uses a formula set out in 46 CFR part 404, Appendix B. The first part of the formula identifies each association's total sources of funds. Tables 17 through 19 follow the formula up to that point.

    Table 17—Total Sources of Funds, District One

    Area 1Area 2
    Recognized Assets:
    Total Current Assets$532,237$467,833
    Total Current Liabilities61,80854,329
    Current Notes Payable+23,413+20,579
    Start Printed Page 10376
    Total Property and Equipment (NET)+445,044+391,191
    Land11,72710,308
    Total Other Assets+0+0
    Total Recognized Assets=927,159=814,966
    Non-Recognized Assets:
    Total Investments and Special Funds+6,452+5,672
    Total Non-Recognized Assets=6,452=5,672
    Total Assets:
    Total Recognized Assets927,159814,966
    Total Non-Recognized Assets+6,452+5,672
    Total Assets=933,611=820,638
    Recognized Sources of Funds:
    Total Stockholder Equity659,141579,380
    Long-Term Debt+262,785+230,986
    Current Notes Payable+23,413+20,579
    Advances from Affiliated Companies+0+0
    Long-Term Obligations—Capital Leases+0+0
    Total Recognized Sources=945,339=830,945
    Non-Recognized Sources of Funds:
    Pension Liability00
    Other Non-Current Liabilities+0+0
    Deferred Federal Income Taxes+10,675+9,383
    Other Deferred Credits+0+0
    Total Non-Recognized Sources=10,675=9,383
    Total Sources of Funds:
    Total Recognized Sources945,339830,945
    Total Non-Recognized Sources+10,675+9,383
    Total Sources of Funds=956,014=840,328
    Note: Numbers may not total due to rounding.

    Table 18—Total Sources of Funds, District Two

    Area 4Area 5
    Recognized Assets:
    Total Current Assets498,456747,683
    Total Current Liabilities494,410741,614
    Current Notes Payable+33,962+50,942
    Total Property and Equipment (NET)+436,063+654,094
    Land00
    Total Other Assets+60,418+90,627
    Total Recognized Assets=534,488=801,733
    Non-Recognized Assets:
    Total Investments and Special Funds+0+0
    Total Non-Recognized Assets=0=0
    Total Assets:
    Total Recognized Assets534,488801,733
    Total Non-Recognized Assets+0+0
    Total Assets=534,488=801,733
    Recognized Sources of Funds:
    Total Stockholder Equity85,846128,768
    Long-Term Debt+414,681+622,022
    Current Notes Payable+33,962+50,942
    Advances from Affiliated Companies+0+0
    Start Printed Page 10377
    Long-Term Obligations—Capital Leases+0+0
    Total Recognized Sources=534,488=801,733
    Non-Recognized Sources of Funds:
    Pension Liability00
    Other Non-Current Liabilities+0+0
    Deferred Federal Income Taxes+0+0
    Other Deferred Credits+0+0
    Total Non-Recognized Sources=0=0
    Total Sources of Funds:
    Total Recognized Sources534,488801,733
    Total Non-Recognized Sources+0+0
    Total Sources of Funds=534,488=801,733
    Note: Numbers may not total due to rounding.

    Table 19—Total Sources of Funds, District Three

    Area 6Area 7Area 8
    Recognized Assets:
    Total Current Assets656,459281,340401,914
    Total Current Liabilities82,77535,47550,679
    Current Notes Payable+7,730+3,313+4,733
    Total Property and Equipment (NET)+19,611+8,405+12,007
    Land000
    Total Other Assets+490+210+300
    Total Recognized Assets=601,515=257,793=368,275
    Non-Recognized Assets:
    Total Investments and Special Funds+0+0+0
    Total Non-Recognized Assets=0=0=0
    Total Assets:
    Total Recognized Assets601,515257,793368,275
    Total Non-Recognized Assets+0+0+0
    Total Assets=601,515=257,793=368,275
    Recognized Sources of Funds:
    Total Stockholder Equity586,300251,271358,959
    Long-Term Debt+7,485+3,208+4,583
    Current Notes Payable+7,730+3,313+4,733
    Advances from Affiliated Companies+0+0+0
    Long-Term Obligations - Capital Leases+0+0+0
    Total Recognized Sources=601,515=257,793=368,275
    Non-Recognized Sources of Funds:
    Pension Liability000
    Other Non-Current Liabilities+0+0+0
    Deferred Federal Income Taxes+0+0+0
    Other Deferred Credits+0+0+0
    Total Non-Recognized Sources=0=0=0
    Total Sources of Funds:
    Total Recognized Sources601,515257,792368,275
    Total Non-Recognized Sources+0+0+0
    Total Sources of Funds=601,515=257,792=368,275
    Note: Numbers may not total due to rounding.
    Start Printed Page 10378

    Tables 17 through 19 also relate to the second part of the formula for calculating the investment base. The second part establishes a ratio between recognized sources of funds and total sources of funds. Since non-recognized sources of funds (sources we do not recognize as required to support pilotage operations) only exist for District One for this year's rulemaking, the ratio between recognized sources of funds and total sources of funds is 1:1 (or a multiplier of 1) for Districts Two and Three. District One has a multiplier of 0.99. Table 20 applies the multiplier of 0.99 and 1 as necessary and shows the investment base for each association. Table 20 also expresses these results by area, because area results will be needed in subsequent steps.

    Table 20—Investment Base by Area and District

    DistrictAreaTotal recognized assets ($)Recognized sources of funds ($)Total sources of funds ($)Multiplier (ratio of recognized to total sources)Investment base ($) 1
    One1927,159945,339956,0140.99916,806
    2814,966830,945840,3280.99805,866
    Total1,722,672
    Two 24534,488534,488534,4881534,488
    5801,733801,733801,7331801,733
    Total1,336,221
    Three6601,515601,515601,5151601,515
    7257,793257,792257,7921257,793
    8368,275368,275368,2751368,275
    Total1,227,581
    1 “Investment base” = “Total recognized assets” × “Multiplier (ratio of recognized to total sources)”.
    2 The pilot associations that provide pilotage services in Districts One and Three operate as partnerships. The pilot association that provides pilotage service for District Two operates as a corporation.
    Note: Numbers may not total due to rounding.

    Step 5: Determination of Target Rate of Return. We determine a market-equivalent return on investment (ROI) that will be allowed for the recognized net capital invested in each association by its members. We do not recognize capital that is unnecessary or unreasonable for providing pilotage services. There are no non-recognized investments in this year's calculations. The allowed ROI is based on the preceding year's average annual rate of return for new issues of high-grade corporate securities. For 2013, the preceding year, the allowed ROI was 4.24 percent, based on the average rate of return for that year on Moody's AAA corporate bonds, which can be found at http://research.stlouisfed.org/​fred2/​series/​AAA/​downloaddata?​cid=​119.

    Step 6: Adjustment Determination. The first part of the adjustment determination requires an initial calculation, applying a formula described in Appendix A. The formula uses the results from Steps 1, 2, 3, and 4 to project the ROI that can be expected in each area if no further adjustments are made. This calculation is shown in Tables 21 through 23.

    Table 21—Projected ROI, Areas in District One

    Area 1Area 2
    Revenue (from Step 3)$2,417,285$1,585,032
    Operating Expenses (from Step 1)$603,313$458,153
    Pilot Compensation (from Step 2)$1,393,964$845,981
    Operating Profit/(Loss)=$420,009=$280,899
    Interest Expense (from audits)$15,484$13,610
    Earnings Before Tax=$404,525=$267,289
    Federal Tax Allowance$0$0
    Net Income=$404,525=$267,289
    Return Element (Net Income + Interest)$420,009$280,899
    Investment Base (from Step 4)÷$916,806÷$805,866
    Projected Return on Investment=0.46=0.35

    Table 22—Projected ROI, Areas in District Two

    Area 4Area 5
    Revenue (from Step 3)$1,223,262$2,635,314
    Operating Expenses (from Step 1)$512,027$768,048
    Pilot Compensation (from Step 2)$676,785$1,393,964
    Operating Profit/(Loss)=$34,450=$473,302
    Interest Expense (from audits)$2,989$4,483
    Earnings Before Tax=$31,461=$468,819
    Start Printed Page 10379
    Federal Tax Allowance$5,200$7,800
    Net Income=$26,261=$461,019
    Return Element (Net Income + Interest)$29,250$465,502
    Investment Base (from Step 4)÷$534,488÷$801,733
    Projected Return on Investment=0.05=0.58

    Table 23—Projected ROI, Areas in District Three

    Area 6Area 7Area 8
    Revenue (from Step 3)$1,969,800$1,496,427$1,442,677
    Operating Expenses (from Step 1)$811,899$347,957$497,081
    Pilot Compensation (from Step 2)$1,015,177$929,309$845,981
    Operating Profit/(Loss)=$142,724=$219,161=$99,615
    Interest Expense (from audits)$2,692$1,154$1,648
    Earnings Before Tax=$140,032=$218,007=$97,967
    Federal Tax Allowance$0$0$0
    Net Income=$140,032=$218,007=$97,967
    Return Element (Net Income + Interest)$142,724$219,161$99,615
    Investment Base (from Step 4)÷$601,515÷$257,793÷$368,275
    Projected Return on Investment=0.24=0.85=0.27

    The second part required for Step 6 compares the results of Tables 21 through 23 with the target ROI (4.24 percent) we obtained in Step 5 to determine if an adjustment to the base pilotage rate is necessary. Table 24 shows this comparison for each area.

    Table 24—Comparison of projected ROI and Target ROI, by Area1

    Area 1Area 2Area 4Area 5Area 6Area 7Area 8
    St. Lawrence RiverLake OntarioLake ErieSoutheast Shoal to Port Huron, MILakes Huron and MichiganSt. Mary's RiverLake Superior
    Projected return on investment0.45810.34860.05470.58060.23730.85010.2705
    Target return on investment0.04240.04240.04240.04240.04240.04240.0424
    Difference in return on investment0.41570.30620.01230.53820.19490.80770.2281
    1Note: Decimalization and rounding of the target ROI affects the display in this table but does not affect our calculations, which are based on the actual figure.

    Because Table 24 shows a significant difference between the projected and target ROIs, an adjustment to the base pilotage rates is necessary. Step 6 now requires us to determine the pilotage revenues that are needed to make the target return on investment equal to the projected return on investment. This calculation is shown in Table 25. It adjusts the investment base we used in Step 4, multiplying it by the target ROI from Step 5, and applies the result to the operating expenses and target pilot compensation determined in Steps 1 and 2.

    Table 25—Revenue Needed To Recover Target ROI, by Area

    Pilotage areaOperating expenses (Step 1)Target pilot compensation (Step 2)Investment base (Step 4) × 4.24% (Target ROI Step 5)Federal tax allowanceRevenue needed
    Area 1 (Designated waters)$603,313+1,393,964+38,873+0=2,036,149
    Area 2 (Undesignated waters)$458,153+845,981+34,169+0=1,338,302
    Area 4 (Undesignated waters)$512,027+676,785+22,662+5,200=1,216,674
    Area 5 (Designated waters)$768,048+1,393,964+33,993+7,800=2,203,805
    Area 6 (Undesignated waters)$811,899+1,015,177+25,504+0=1,852,580
    Start Printed Page 10380
    Area 7 (Designated waters)$347,957+929,309+10,930+0=1,288,197
    Area 8 (Undesignated waters)$497,081+845,981+15,615+0=1,358,677
    Total$3,998,479+7,101,160+181,747+13,000=11,294,385

    The “Revenue Needed” column of Table 25 is less than the revenue we projected in Table 16.

    Step 7: Adjustment of Pilotage Rates. Finally, we calculate rate adjustments by dividing the Step 6 revenue needed (Table 25) by the Step 3 revenue projection (Table 16), to give us a rate multiplier for each area. These rate adjustments are subject to adjustment based on the requirements of agreements between the United States and Canada and adjustment for other supportable circumstances. Tables 26 through 28 show these calculations.

    Table 26—Rate Multiplier, Areas in District One

    Ratemaking projectionsArea 1Area 2
    St. Lawrence RiverLake Ontario
    Revenue Needed (from Step 6)$2,036,149$1,338,302
    Revenue (from Step 3)÷$2,417,285÷$1,585,032
    Rate Multiplier=0.8423=0.8443

    Table 27—Rate Multiplier, Areas in District Two

    Ratemaking projectionsArea 4Area 5
    Lake ErieSoutheast Shoal to Port Huron, MI
    Revenue Needed (from Step 6)$1,216,674$2,203,805
    Revenue (from Step 3)÷$1,223,262÷$2,635,314
    Rate Multiplier=0.9946=0.8363

    Table 28—Rate Multiplier, Areas in District Three

    Ratemaking projectionsArea 6Area 7Area 8
    Lakes Huron and MichiganSt. Mary's RiverLake Superior
    Revenue Needed (from Step 6)$1,825,580$1,288,197$1,358,677
    Revenue (from Step 3)÷$1,969,800÷$1,496,427÷$1,442,677
    Rate Multiplier=0.9405=0.8608=0.9418
    Note: Numbers may not total due to rounding.

    We calculate a rate multiplier for adjusting the basic rates and charges described in 46 CFR 401.420 and 401.428, and it is applicable in all areas. We divide total revenue needed (Step 6, Table 25) by total projected revenue (Steps 3 and 3.A, Table 16). Table 29 shows this calculation.

    Table 29—Rate Multiplier for Basic Rates and Charges in 46 CFR 401.420 and 401.428

    Ratemaking Projections:
    Total Revenue Needed (from Step 6)$11,294,385
    Total revenue (from Step 3)÷$12,769,797
    Rate Multiplier=0.884

    Using this table, we calculate rates for cancellation, delay, or interruption in rendering services (46 CFR 401.420) and basic rates and charges for carrying a U.S. pilot beyond the normal change point, or for boarding at other than the normal boarding point (46 CFR 401.428). The result is a decrease by 11.55 percent in all areas.

    Without further action, the existing rates we established in our 2014 final rule would then be multiplied by the rate multipliers from Tables 29 through 31 to calculate the area by area rate changes for 2015. The resulting 2015 rates across the Great Lakes, on average, would then decrease by approximately 12 percent from the 2014 rates. This decrease is not due to increased Start Printed Page 10381efficiencies in pilotage services but rather a result of adjustments to AMOU contract data.

    We decline to impose this decrease because recently completed independent audits of pilot association revenues detail a significant gap between revenues projected by the Coast Guard and those actually collected by the pilot associations. Implementing a rate decrease would further widen this disparity and adversely impact the provision of safe, efficient, and reliable pilotage service on the Great Lakes. In light of the revenue studies, our initial proposal in the NPRM to raise rates 2.5 percent in order to gain parity with the Canadian GLPA now appears insufficient to ensure the funding of safe, efficient, and reliable pilotage service. In 46 U.S.C. 9303(f), the statute states “The Secretary shall prescribe by regulation rates and charges for pilotage services, giving consideration to the public interest and the costs of providing the services.” We believe the public interest is best served through promotion of safe, efficient, and reliable pilotage service. Sufficient revenue to fund safe, efficient, and reliable pilotage operations are considered integral to the public interest. Table 30 demonstrates the results of the revenue audits compared to our projections.

    Table 30—Revenue Gap

    DistrictRatemaking projections (2015)Actual revenue revenue audits (2013)Revenue shortfall (projections minus actual)
    1$4,002,317$3,406,164$596,153
    23,858,5763,169,377689,199
    34,908,9044,323,965584,939

    Further, the gap captured in Table 30 actually underestimates the revenue gap because the projections of the current rulemaking rely on the alterations of proprietary union contracts. Table 31 illustrates the average U.S. Registered Pilot compensation, assuming all revenue remaining after expenses is distributed as compensation.

    Table 31—2013 Average Actual Compensation *

    DistrictRevenuesExpensesTotal available for compensationNumber of pilots **Approximate compensation per pilot
    1$3,406,164$1,272,365$2,133,79911$193,982
    23,169,3771,461,4381,707,93910170,794
    34,323,9651,778,1182,545,84717149,756
    Total10,899,5064,511,9216,387,58538168,094
    * The Coast Guard does not establish pay procedures for the pilot associations, rather we set a target rate of compensation for general compensation calculation.
    ** The District Three Association actually employed 13 pilots during this timeframe; their approximate compensation per pilot is higher than this table depicts. Seventeen pilots were authorized in the rate.

    These figures demonstrate the significant shortfall in pilot compensation compared to an estimated present value of 2011 compensation (the last figures are not in dispute) of approximately $260,000. We believe $260,000 is a fair estimate of what pilot compensation should be based on uncontested figures from previous AMOU contracts. The gap of almost $90,000 between approximate actual compensation and our estimates of where pilot compensation should stand place the pilot associations in an untenable position. We believe it is imperative to act quickly to raise the revenue needed to sustain pilot association operations and compensate pilots in a fair and reasonable manner. This gap also highlights a significant discrepancy in the actual salaries of U.S. Registered Pilots compared to the Canadian Registered Pilots of the GLPA, estimated to be approximately ($US) 250,000. We must work quickly to rebaseline the billing scheme and raise the revenue necessary to continue to sustain safe, efficient, and reliable pilotage service on the Great Lakes. We believe the shortfalls in revenue are caused by an overprojection of bridge hours and to a larger extent, an inadequate billing scheme. To this end, we will adjust our proposal to raise rates in all areas by 10 percent in a concerted effort to begin closing the established gap between compensation of U.S. and Canadian Registered Pilots, as well as the gap between actual salaries and previous estimates. This percentage increase is high enough above inflation to begin closing the revenue gap without being unduly burdensome to industry. We believe sustained, steady rate increases to close the gap are more responsible than a one-time action. This replaces our initial projections of a 2.5 percent increase in all areas. We will seek to address the underlying methodology challenges in a future rulemaking.

    Therefore, we rely on the discretionary authority we have under Step 7 to further adjust rates and begin closing the gap between revenues projected by the Coast Guard and those collected by the pilot associations. Table 32 compares the impact, area by area, that an average decrease of 12 percent would have, relative to the impact each area would experience if United States rates increase.Start Printed Page 10382

    Table 32—Impact of Exercising Step 7 Discretion

    AreaPercent change in rate without exercising Step 7 discretionPercent change in rate with exercise of Step 7 discretion
    Area 1 (Designated waters)−15.7710
    Area 2 (Undesignated waters)−15.5710
    Area 4 (Undesignated waters)−0.5410
    Area 5 (Designated waters)−16.3710
    Area 6 (Undesignated waters)−5.9510
    Area 7 (Designated waters)−13.9210
    Area 8 (Undesignated waters)−5.8210

    The following tables reflect our rate adjustments of 10 percent across all areas.

    Tables 33 through 35 show these calculations.

    Table 33—Adjustment of Pilotage Rates, Areas in District One

    2014 RateRate multiplierAdjusted rate for 2015
    Area 1 St. Lawrence River
    Basic Pilotage$19.22/km, $34.02/mi×1.1=$21.14/km, $37.42/mi
    Each lock Transited$426×1.1=$469
    Harbor movage1,395×1.1=1,535
    Minimum basic rate, St. Lawrence River931×1.1=1,024
    Maximum rate, through trip4,084×1.1=4,492
    Area 2
    Lake Ontario
    6-hour period872×1.1=959
    Docking or Undocking832×1.1=915
    Note: Numbers may not total due to rounding.

    In addition to the rate charges in Table 33, as we explain in the Summary section of Part VI of this preamble, we are authorizing District One to implement a temporary supplemental 10 percent charge on each source form (the “bill” for pilotage service) for the duration of the 2015 shipping season, which begins in March 2015. District One will be required to provide us with monthly status reports once this surcharge becomes effective for the duration of the 2015 shipping season. We will exclude these expenses from future rates and any surcharge surplus/deficit from the 2014 season would impact the final authorized surcharge for the 2015 season.

    Table 34—Adjustment of Pilotage Rates, Areas in District Two

    2014 RateRate multiplierAdjusted rate for 2015
    Area 4 Lake Erie
    6-hour period$849×1.1=$934
    Docking or undocking653×1.1=718
    Any point on Niagara River below Black Rock Lock1,667×1.1=1,834
    Area 5
    Southeast Shoal to Port Huron, MI between any point on or in
    Toledo or any point on Lake Erie W. of Southeast Shoal1,417×1.1=1,559
    Toledo or any point on Lake Erie W. of Southeast Shoal & Southeast Shoal2,397×1.1=2,637
    Toledo or any point on Lake Erie W. of Southeast Shoal & Detroit River3,113×1.1=3,424
    Toledo or any point on Lake Erie W. of Southeast Shoal & Detroit Pilot Boat2,397×1.1=2,637
    Port Huron Change Point & Southeast Shoal (when pilots are not changed at the Detroit Pilot Boat)4,176×1.1=4,594
    Port Huron Change Point & Toledo or any point on Lake Erie W. of Southeast Shoal (when pilots are not changed at the Detroit Pilot Boat)4,837×1.1=5,321
    Port Huron Change Point & Detroit River3,137×1.1=3,451
    Port Huron Change Point & Detroit Pilot Boat2,441×1.1=2,685
    Port Huron Change Point & St. Clair River1,735×1.1=1,909
    St. Clair River1,417×1.1=1,559
    St. Clair River & Southeast Shoal (when pilots are not changed at the Detroit Pilot Boat)4,176×1.1=4,594
    St. Clair River & Detroit River/Detroit Pilot Boat3,137×1.1=3,451
    Detroit, Windsor, or Detroit River1,417×1.1=1,559
    Detroit, Windsor, or Detroit River & Southeast Shoal2,397×1.1=2,637
    Start Printed Page 10383
    Detroit, Windsor, or Detroit River & Toledo or any point on Lake Erie W. of Southeast Shoal3,113×1.1=3,424
    Detroit, Windsor, or Detroit River & St. Clair River3,137×1.1=3,451
    Detroit Pilot Boat & Southeast Shoal1,735×1.1=1,909
    Detroit Pilot Boat & Toledo or any point on Lake Erie W. of Southeast Shoal2,397×1.1=2,637
    Detroit Pilot Boat & St. Clair River3,137×1.1=3,451
    Note: Numbers may not total due to rounding.

    In addition to the rate charges in Table 34, and for the reasons we discussed in the Summary section of Part VI of this preamble, we are authorizing District Two to implement a temporary supplemental 10 percent charge on each source form for the duration of the 2015 shipping season, which begins in March 2015. District Two will be required to provide us with monthly status reports once this surcharge becomes effective for the duration of the 2015 shipping season. We will exclude these expenses from future rates.

    Table 35—Adjustment of Pilotage Rates, Areas in District Three

    2014 RateRate multiplierAdjusted rate for 2015
    Area 6 Lakes Huron and Michigan
    6-hour Period$708×1.1=$779
    Docking or undocking672×1.1=739
    Area 7
    St. Mary's River between any point on or in
    Gros Cap & De Tour2,648×1.1=2,913
    Algoma Steel Corp. Wharf, Sault Ste. Marie, Ont. & De Tour2,648×1.1=2,913
    Algoma Steel Corp. Wharf, Sault Ste. Marie, Ont. & Gros Cap997×1.1=1,097
    Any point in Sault Ste. Marie, Ont., except the Algoma Steel Corp. Wharf & De Tour2,219×1.1=2,441
    Any point in Sault Ste. Marie, Ont., except the Algoma Steel Corp. Wharf & Gros Cap997×1.1=1,097
    Sault Ste. Marie, MI & De Tour2,219×1.1=2,441
    Sault Ste. Marie, MI & Gros Cap997×1.1=1,097
    Harbor movage997×1.1=1,097
    Area 8
    Lake Superior
    6-hour period601×1.1=661
    Docking or undocking571×1.1=628
    Note: Numbers may not total due to rounding.

    In addition to the rate charges in Table 35, and for the reasons we discussed in the Summary section of Part VI of this preamble, we are authorizing District Three to implement a temporary supplemental 10 percent charge on each source form for the duration of the 2015 shipping season, which begins in March 2015. District Three will be required to provide us with monthly status reports once this surcharge becomes effective for the duration of the 2015 shipping season. We will exclude these expenses from future rates.

    VII. Regulatory Analyses

    We developed this rule after considering numerous statutes and E.O.s related to rulemaking. Below we summarize our analyses based on these statutes or E.O.s.

    A. Regulatory Planning and Review

    Executive Orders 12866, Regulatory Planning and Review, and 13563, Improving Regulation and Regulatory Review, direct agencies to assess the costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). Executive Order 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility.

    This rule is not a significant regulatory action under section 3(f) of E.O. 12866 as supplemented by E.O. 13563, and does not require an assessment of potential costs and benefits under section 6(a)(3) of E.O. 12866. The Office of Management and Budget (OMB) has not reviewed it under E.O. 12866. Nonetheless, we developed an analysis of the costs and benefits of the rule to ascertain its probable impacts on industry.

    The Coast Guard is required to review and adjust pilotage rates on the Great Lakes annually. See Parts III and IV of this preamble for detailed discussions of the Coast Guard's legal basis and purpose for this rulemaking and for background information on Great Lakes pilotage ratemaking. Based on our annual review for this rulemaking, we are adjusting the pilotage rates for the 2015 shipping season to generate sufficient revenue to cover allowable expenses, and to target pilot compensation and returns on pilot associations' investments. The rate adjustments in this rule will, if codified, lead to an increase in the cost per unit Start Printed Page 10384of service to shippers in all three districts, and result in an estimated annual cost increase to shippers of approximately $1,276,980 across all three districts over 2014 rates—an increase of 10 percent.

    In addition to the increase in payments that will be incurred by shippers in all three districts from the previous year as a result of the discretionary rate adjustments, we are authorizing temporary, supplemental surcharges to traffic across all three districts in order for the pilotage associations to recover training expenses and technology improvements that were incurred throughout the 2013 and 2014 shipping seasons. These temporary surcharges will be authorized for the duration of the 2015 shipping season, which begins in March. The additional revenue due to the temporary surcharges was calculated by multiplying the surcharge percentage by the projected revenue needed in 2015 for each district (Table 37). We estimate that these temporary surcharges will generate a combined $1,404,678 in revenue for the pilotage associations across all three districts. In District One, the 10 percent surcharge is expected to generate an additional $440,255 in revenue. In District Two, the 10 percent surcharge is expected to generate $424,443 in additional revenue. In District Three, the 10 percent surcharge is expected to generate an additional $539,979 in revenue. At the end of the 2015 shipping season, we will account for the monies the surcharges generate and make adjustments (debits/credits) to the operating expenses for the following year.

    Therefore, after accounting for the implementation of the temporary surcharges on traffic across all three districts, the payments made by shippers during the 2015 shipping season are estimated to be approximately $2,681,657 more than the payments that were made in 2014.[4]

    A regulatory assessment follows.

    The final rule applies the 46 CFR part 404, Appendix A, full ratemaking methodology, including the exercise of our discretion to increase Great Lakes pilotage rates, on average, approximately 10 percent overall from the current rates set in the 2014 final rule. The Appendix A methodology is discussed and applied in detail in Part VI of this preamble. Among other factors described in Part VI, it reflects audited 2012 financial data from the pilotage associations (the most recent year available for auditing), projected association expenses, and regional inflation or deflation. The last full Appendix A ratemaking was concluded in 2014 and used financial data from the 2011 base accounting year. The last annual rate review, conducted under 46 CFR part 404, Appendix C, was completed early in 2011.

    The shippers affected by these rate adjustments are those owners and operators of domestic vessels operating on register (employed in foreign trade) and owners and operators of foreign vessels on a route within the Great Lakes system. These owners and operators must have pilots or pilotage service as required by 46 U.S. C. 9302. There is no minimum tonnage limit or exemption for these vessels. The statute applies only to commercial vessels and not to recreational vessels.

    Owners and operators of other vessels that are not affected by this final rule, such as recreational boats and vessels operating only within the Great Lakes system, may elect to purchase pilotage services. However, this election is voluntary and does not affect our calculation of the rate and is not a part of our estimated national cost to shippers.

    We used 2011-2013 vessel arrival data from the Coast Guard's Marine Information for Safety and Law Enforcement (MISLE) system to estimate the average annual number of vessels affected by the rate adjustment. Using that period, we found that approximately 114 different vessels journeyed into the Great Lakes system annually. These vessels entered the Great Lakes by transiting at least one of the three pilotage districts before leaving the Great Lakes system. These vessels often made more than one distinct stop, docking, loading, and unloading at facilities in Great Lakes ports. Of the total trips for the 114 vessels, there were approximately 353 annual U.S. port arrivals before the vessels left the Great Lakes system, based on 2011-2013 vessel data from MISLE.

    The impact of the rate adjustment to shippers is estimated from the District pilotage revenues. These revenues represent the costs that shippers must pay for pilotage services. The Coast Guard sets rates so that revenues equal the estimated cost of pilotage for these services.

    We estimate the additional impact (cost increases or cost decreases) of the rate adjustment in this rule to be the difference between the total projected revenue needed to cover costs in 2014, based on the 2014 rate adjustment, and the total projected revenue needed to cover costs in 2015, as set forth in this rule, plus any temporary surcharges authorized by the Coast Guard. Table 36 details projected revenue needed to cover costs in 2015 after making the discretionary adjustment to pilotage rates as discussed in Step 7 of Part V of this preamble. Table 37 summarizes the derivation for calculating the revenue expected to be generated as a result of the temporary surcharges applied to traffic in all three districts as discussed in Step 7 of Part V of this preamble. Table 38 details the additional cost increases to shippers by area and district as a result of the rate adjustments and temporary surcharges on traffic in Districts One, Two, and Three.

    Table 36—Rate Adjustment by Area and District

    [$U.S.; Non-discounted]

    2014 Pilotage rates 5Rate change 62015 Pilotage rates 7Projected 2015 bridge hours 8Projected revenue needed in 2015 9
    Area 1$472.501.10$519.745,116$2,659,014
    Area 2291.961.10321.155,4291,743,536
    Start Printed Page 10385
    Total, District One4,402,549
    Area 4210.401.10231.445,8141,345,588
    Area 5521.641.10573.805,0522,898,845
    Total, District Two4,244,433
    Area 6204.951.10225.459,6112,166,780
    Area 7495.011.10544.523,0231,646,070
    Area 8191.341.10210.477,5401,586,945
    Total, District Three5,399,795
    * Some values may not total due to rounding.

    Table 37—Derivation of Temporary Surcharge

    Area 1Area 2Area 4Area 5Area 6Area 7Area 8
    Projected Revenue Needed in 2015$2,659,014$1,743,536$1,345,588$2,898,845$2,166,780$1,646,070$1,586,945
    Surcharge Rate10%10%10%10%10%10%10%
    Surcharge Raised$265,901$174,354$134,559$289,885$216,678$167,607$158,694
    Total Surcharge$440,255$424,443$539,979

    Table 38—Impact of the Rule by Area and District

    [$U.S.; Non-discounted]

    Projected revenue needed in 2014 10Projected revenue needed in 2015 11Temporary surchargeAdditional revenue or costs 2015 (2015-2014)Total costs or savings of this final rule (additional revenue or costs 2015+temporary surcharge)
    Area 1$2,417,285$2,659,014$265,901$241,729$507,630
    Area 21,585,0321,743,536174,354158,503332,857
    Total, District One4,002,3184,402,549440,255400,232840,487
    Area 41,223,2621,345,588134,559122,326256,885
    Area 52,635,3142,898,845289,885263,531553,416
    Total, District Two3,858,5764,244,433424,443385,858810,301
    Area 61,969,8002,166,780216,678196,980413,658
    Area 71,496,4271,646,070164,607149,643314,250
    Area 81,442,6771,586,945158,694144,268302,962
    Total, District Three4,908,9045,399,795539,979490,8901,030,870
    System Total12,769,79714,046,7771,404,6781,276,9802,681,657
    * Some values may not total due to rounding.

    After applying the discretionary rate change in this rule, the resulting difference between the projected revenue in 2014 and the projected revenue in 2015 is the annual change in payments from shippers to pilots after accounting for market conditions (i.e., a decrease in demand for pilotage services) and the change to pilotage rates as a result of this final rule. This figure is equivalent to the total additional payments or reduction in payments from the previous year that shippers will incur for pilotage services from this rule.

    The impact of the discretionary rate adjustment on shippers varies by area and district in this final rule. The discretionary rate adjustments will lead to affected shippers operating in District One, District Two, and District Three experiencing an increase in payments of $400,232, $385,858, and $490,890, respectively, from the previous year.

    In addition to the rate adjustments, temporary surcharges on traffic in District One, District Two, and District Three will be applied for the duration of the 2015 season in order for the pilotage associations to recover training expenses and technology investments incurred during the 2013 and 2014 Start Printed Page 10386shipping seasons. We estimate that these surcharges will generate an additional $440,255, $424,443, and $539,979 in revenue for the pilotage associations in District One, District Two, and District Three, respectively. At the end of the 2015 shipping season, we will account for the monies the surcharges generate and make adjustments (debits/credits) to the operating expenses for the following year.[12]

    To calculate an exact cost or savings per vessel is difficult because of the variation in vessel types, routes, port arrivals, commodity carriage, time of season, conditions during navigation, and preferences for the extent of pilotage services on designated and undesignated portions of the Great Lakes system. Some owners and operators will pay more and some would pay less, depending on the distance travelled and the number of port arrivals by their vessels. However, the increase in costs reported earlier in this rule does capture the adjustment in payments that shippers will experience from the previous year. The overall adjustment in payments, after taking into account the increase in pilotage rates and the addition of temporary surcharges will be an increase in payments by shippers of approximately $2,681,657 across all three districts.

    This rule will allow the Coast Guard to meet the requirements in 46 U.S. C. 9303 to review the rates for pilotage services on the Great Lakes, thus ensuring proper pilot compensation.

    Alternatively, if we imposed the new rates based on the new contract data from AMOU, instead of using the discretionary rate adjustment described in Step 7, there would be an approximately 12 percent decrease in rates across the system. Instead of shippers experiencing an increase in payments of approximately $1,276,980 [13] from the previous year, as a result of the rate adjustments, shippers would instead experience a reduction in payments of approximately $1,475,412.[14] Table 39 details projected revenue needed to cover costs in 2015 if the discretionary adjustment to pilotage rates as discussed in Step 7 of Part V of this preamble is not made. Table 40 details the additional costs or savings by area and district as a result of this alternative proposal.

    Table 39—Alternative Rate Adjustment by Area and District

    [$U.S.; Non-discounted]

    2014 Pilotage ratesRate change 152015 Pilotage ratesProjected 2015 bridge hoursProjected revenue needed in 2015
    Area 1$472.500.8423$398.005,116$2,036,149
    Area 2291.960.8443246.515,4291,338,302
    Total, District One3,374,451
    Area 4210.400.9946209.275,8141,216,674
    Area 5521.640.8363436.225,0522,203,805
    Total, District Two3,420,480
    Area 6204.950.9405192.769,6111,852,580
    Area 7495.010.8608426.133,0231,288,197
    Area 8191.340.9418180.207,5401,358,677
    Total, District Three4,499,454
    System Total11,294,385
    * Some values may not total due to rounding.

    Table 40—Alternative Impact of the Rule by Area and District

    [$U.S.; Non-discounted]

    Projected revenue needed in 2014Projected revenue needed in 2015Temporary surchargeAdditional costs or savings of this rule
    Area 1$2,417,285$2,036,149$203,615($177,521)
    Area 21,585,0321,338,302133,830(112,900)
    Total, District One4,002,3183,374,451337,445(290,421)
    Area 41,223,2621,216,674121,667115,080
    Area 52,635,3142,203,805220,381(211,128)
    Total, District Two3,858,5763,420,480342,048(96,048)
    Area 61,969,8001,852,580185,25868,038
    Area 71,496,4271,288,197128,820(79,411)
    Area 81,442,6771,358,677135,86851,868
    Start Printed Page 10387
    Total, District Three4,908,9044,499,454449,94540,495
    System Total12,769,79711,294,3851,129,439(345,974)
    * Some values may not total due to rounding.

    We reject this alternative, however, because independent audits of pilot association revenues details a nearly $2 million gap between Coast Guard revenue projections and the amount of revenues actually collected. A rate decrease would only further widen this disparity, and would also jeopardize the ability of pilotage associations to provide safe, efficient, and reliable pilotage service. A rate increase of 10 percent in all areas will lessen the gap between revenues projected by the Coast Guard and those collected by pilot associations, and the gap between the actual salaries of U.S. Registered Pilots and Canadian Registered Pilots of the GLPA. See our discussion of Step 7 in Part VI of this preamble for further explanation.

    B. Small Entities

    Under the Regulatory Flexibility Act, 5 U.S.C. 601-612, we have considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000 people.

    We expect that entities affected by the final rule will be classified under the North American Industry Classification System (NAICS) code subsector 483-Water Transportation, which includes the following 6-digit NAICS codes for freight transportation: 483111—Deep Sea Freight Transportation, 483113—Coastal and Great Lakes Freight Transportation, and 483211—Inland Water Freight Transportation. According to the Small Business Administration's definition, a U.S. company with these NAICS codes and employing less than 500 employees is considered a small entity.

    For the final rule, we reviewed recent company size and ownership data for the period 2011 through 2013 in the Coast Guard's MISLE database, and we reviewed business revenue and size data provided by publicly available sources such as MANTA and Reference USA. We found that large, foreign-owned shipping conglomerates or their subsidiaries owned or operated all vessels engaged in foreign trade on the Great Lakes. We assume that new industry entrants would be comparable in ownership and size to these shippers.

    There are three U.S. entities affected by this rule that receive revenue from pilotage services. These are the three pilot associations that provide and manage pilotage services within the Great Lakes districts. Two of the associations operate as partnerships and one operates as a corporation. These associations are designated with the same NAICS industry classification and small-entity size standards described above, but they have fewer than 500 employees; combined, they have approximately 65 total employees. We expect no adverse impact to these entities from this rule because through this rulemaking, all the pilot associations are provided with additional revenue to offset some of the projected expenses associated with the projected number of bridge hours and pilots, and to keep them on par with their Canadian counterparts.

    Therefore, the Coast Guard certifies under 5 U.S.C. 605(b) that this rule would not have a significant economic impact on a substantial number of small entities.

    C. Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we offered to assist small entities in understanding this rule so that they can better evaluate its effects on them and participate in the rulemaking. The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.

    Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247).

    D. Collection of Information

    This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520). This rule does not change the burden in the collection currently approved by the OMB under OMB Control Number 1625-0086, Great Lakes Pilotage Methodology.

    E. Federalism

    A rule has implications for federalism under E.O. 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that order and have determined that it is consistent with the fundamental federalism principles and preemption requirements described in E.O. 13132. Our analysis is explained below.

    Congress directed the Coast Guard to establish “rates and charges for pilotage services.” 46 U.S.C. 9303(f). This regulation is issued pursuant to that statute and is preemptive of state law as specified in 46 U.S.C. 9306. Under 46 U.S.C. 9306, a “State or political subdivision of a State may not regulate or impose any requirement on pilotage on the Great Lakes.” As a result, States or local governments are expressly prohibited from regulating within this category. Therefore, this rule is consistent with the principles of federalism and preemption requirements in E.O. 13132.

    F. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions Start Printed Page 10388that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule would not result in such expenditure, we discuss the effects of this rule elsewhere in this preamble.

    G. Taking of Private Property

    This rule will not cause a taking of private property or otherwise have taking implications under E.O. 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    H. Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) of E.O. 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    I. Protection of Children

    We have analyzed this rule under E.O. 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and would not create an environmental risk to health or risk to safety that might disproportionately affect children.

    J. Indian Tribal Governments

    This rule does not have tribal implications under E.O. 13175, Consultation and Coordination with Indian Tribal Governments, because it would not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

    K. Energy Effects

    We have analyzed this rule under E.O. 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under E.O. 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under E.O. 13211.

    L. Technical Standards

    The National Technology Transfer and Advancement Act (15 U.S.C. 272, note) directs agencies to use voluntary consensus standards in their regulatory activities unless the agency provides Congress, through the OMB, with an explanation of why using these standards would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., specifications of materials, performance, design, or operation; test methods; sampling procedures; and related management systems practices) that are developed or adopted by voluntary consensus standards bodies. This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.

    M. Environment

    We have analyzed this rule under Department of Homeland Security Management Directive 023-01 and Commandant Instruction M16475.lD, which guide the Coast Guard in complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321-4370f), and have concluded that this action is one of a category of actions that do not individually or cumulatively have a significant effect on the human environment. A final environmental analysis checklist supporting this determination is available in the docket where indicated under the ADDRESSES section of this preamble. This final rule involves regulations that are editorial or procedural and fall under section 2.B.2, figure 2-1, paragraph (34)(a) of the Instruction.

    Start List of Subjects

    List of Subjects in 46 CFR Part 401

    • Administrative practice and procedure
    • Great Lakes
    • Navigation (water)
    • Penalties
    • Reporting and recordkeeping requirements
    • Seamen
    End List of Subjects

    For the reasons discussed in the preamble, the Coast Guard amends 46 CFR part 401 as follows:

    Title 46—Shipping

    Start Part

    PART 401—GREAT LAKES PILOTAGE REGULATIONS

    End Part Start Amendment Part

    1. The authority citation for part 401 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 46 U.S.C. 2104(a), 6101, 7701, 8105, 9303, 9304; Department of Homeland Security Delegation No. 0170.1; 46 CFR 401.105 also issued under the authority of 44 U.S.C. 3507.

    End Authority Start Amendment Part

    2. In § 401.405, revise paragraphs (a) and (b), including the footnote to Table (a), to read as follows:

    End Amendment Part
    Basic rates and charges on the St. Lawrence River and Lake Ontario.
    * * * * *

    (a) Area 1 (Designated Waters):

    ServiceSt. Lawrence River
    Basic Pilotage$21.13 per kilometer or $37.42 per mile.1
    Each Lock Transited$469.1
    Harbor Movage$1,535.1
    1 The minimum basic rate for assignment of a pilot in the St. Lawrence River is $1,024, and the maximum basic rate for a through trip is $4,492.

    (b) Area 2 (Undesignated Waters):

    ServiceLake Ontario
    6-hour Period$959
    Docking or Undocking915
    Start Amendment Part

    3. In § 401.407, revise paragraphs (a) and (b), including the footnote to Table (b), to read as follows:

    End Amendment Part
    Basic rates and charges on Lake Erie and the navigable waters from Southeast Shoal to Port Huron, MI.
    * * * * *

    (a) Area 4 (Undesignated Waters):

    ServiceLake Erie (East of Southeast Shoal)Buffalo
    6-hour Period$934$934
    Docking or Undocking718718
    Any point on the Niagara River below the Black Rock LockN/A1,834

    (b) Area 5 (Designated Waters):Start Printed Page 10389

    Any point on or inSoutheast ShoalToledo or any point on Lake Erie west of Southeast ShoalDetroit RiverDetroit Pilot BoatSt. Clair River
    Toledo or any port on Lake Erie west of Southeast Shoal$2,637$1,559$3,424$2,637N/A
    Port Huron Change Point1 4,5941 5,3213,4512,6851,909
    St. Clair River1 4,594N/A3,4513,4511,559
    Detroit or Windsor or the Detroit River2,6373,4241,559N/A3,451
    Detroit Pilot Boat1,9092,637N/AN/A3,451
    1 When pilots are not changed at the Detroit Pilot Boat.
    Start Amendment Part

    4. In § 401.410, revise paragraphs (a), (b), and (c) to read as follows:

    End Amendment Part
    Basic rates and charges on Lakes Huron, Michigan, and Superior; and the St. Mary's River.
    * * * * *

    (a) Area 6 (Undesignated Waters):

    ServiceLakes Huron and Michigan
    6-hour Period$779
    Docking or Undocking739

    (b) Area 7 (Designated Waters):

    AreaDe tourGros capAny harbor
    Gros Cap$2,913N/AN/A
    Algoma Steel Corporation Wharf at Sault Ste. Marie, Ontario2,913$1,097N/A
    Any point in Sault Ste. Marie, Ontario, except the Algoma Steel Corporation Wharf2,4411,097N/A
    Sault Ste. Marie, MI2,4411,097N/A
    Harbor MovageN/AN/A$1,097

    (c) Area 8 (Undesignated Waters):

    ServiceLake Superior
    6-hour Period$661
    Docking or Undocking628
    [Amended]
    Start Amendment Part

    5. Amend § 401.420 as follows:

    End Amendment Part Start Amendment Part

    a. In paragraph (a), remove the text “$129” and add, in its place, the text “$142”; and remove the text “$2,021” and add, in its place, the text “$2,223”;

    End Amendment Part Start Amendment Part

    b. In paragraph (b), remove the text “$129” and add, in its place, the text “$142”; and remove the text “$2,021” and add, in its place, the text “$2,223”; and

    End Amendment Part Start Amendment Part

    c. In paragraph (c)(1), remove the text “$763” and add, in its place, the text “$839”; in paragraph (c)(3), remove the text “$129” and add, in its place, the text “$142”; and remove the text “$2,021” and add, in its place, the text “$2,223”.

    End Amendment Part
    [Amended]
    Start Amendment Part

    6. In § 401.428, remove the text “$763” and add, in its place, the text “$839”.

    End Amendment Part Start Signature

    Dated: February 23, 2015.

    Gary C. Rasicot,

    Director, Marine Transportation Systems, U.S. Coast Guard.

    End Signature End Supplemental Information

    Footnotes

    1.  “On register” means that the vessel's certificate of documentation has been endorsed with a registry endorsement, and therefore, may be employed in foreign trade or trade with Guam, American Samoa, Wake, Midway, or Kingman Reef. 46 U.S.C. 12105, 46 CFR 67.17.

    Back to Citation

    2.  A “laker” is a commercial cargo vessel especially designed for and generally limited to use on the Great Lakes.

    Back to Citation

    3.  “Director” is the Coast Guard Director, Great Lakes Pilotage, which is used throughout this rule.

    Back to Citation

    4.  Total payments across all three districts are equal to the increase in payments incurred by shippers as a result of the rate changes plus the temporary surcharges applied to traffic in Districts One, Two, and Three.

    Back to Citation

    5.  2014 Pilotage Rates are described in Table 16 of this rule.

    6.  The estimated rate changes are described in Table 32 of this rule.

    7.  2015 Pilotage Rates—2014 Pilotage Rates × Rate Change.

    8.  Projected 2015 Bridge Hours are described in Table 14 of this rule.

    9.  Projected Revenue Needed in 2015—2015 Pilotage Rates × Projected 2015 Bridge Hours.

    Back to Citation

    10.  Projected revenue needed in 2014 is described in Table 16 of this rule.

    11.  Projected revenue needed in 2015 is described in Table 36 of this rule.

    Back to Citation

    12.  Our projections indicate in the 2016 rulemaking we will apply a surcharge of $112,226 for District One shippers at the end of the 2015 season in order to account for the difference between the total surcharges collected ($440,255) and the actual expenses incurred by the District One pilot association ($328,029 for training expenses), District Two shippers $98,614 (calculation: $424,443 (total surcharges collected) minus $300,000 to train two applicant pilots and ($25,829.80 for technology improvements)), and District Three shippers $213,029 (calculation: $539,979 (total surcharges collected) minus $326,950 (actual training expenses incurred)).

    Back to Citation

    13.  This figure is the total costs or savings of the final rule minus the surcharges.

    Back to Citation

    14.  This figure does not include the additional payments incurred by shippers as a result of the temporary surcharges applied to traffic in all three districts. The figure is equal to the total additional costs or savings of this final rule minus the temporary surcharges (see Table 40).

    15.  The estimated rate changes are described in Table 32 of this final rule.

    Back to Citation

    [FR Doc. 2015-04036 Filed 2-25-15; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
8/1/2015
Published:
02/26/2015
Department:
Coast Guard
Entry Type:
Rule
Action:
Final rule.
Document Number:
2015-04036
Dates:
This final rule is effective August 1, 2015.
Pages:
10365-10389 (25 pages)
Docket Numbers:
Docket No. USCG-2014-0481
RINs:
1625-AC22: Great Lakes Pilotage Rates--2015 Annual Review and Adjustment
RIN Links:
https://www.federalregister.gov/regulations/1625-AC22/great-lakes-pilotage-rates-2015-annual-review-and-adjustment
Topics:
Administrative practice and procedure, Great Lakes, Navigation (water), Penalties, Reporting and recordkeeping requirements, Seamen
PDF File:
2015-04036.pdf
Supporting Documents:
» Western Great Lakes Pilots (District 3) Final
» Lakes Pilots Association, Inc. (District 2) Final
» St. Lawrence Seaway Pilots' Association (District 1) Final
» Categorical Exclusion Determination
» Supporting and Related Documents
» Environmental Checklist
CFR: (5)
46 CFR 401.405
46 CFR 401.407
46 CFR 401.410
46 CFR 401.420
46 CFR 401.428