2016-23205. Federal Acquisition Regulation; Technical Amendments  

  • Start Preamble Start Printed Page 67781

    AGENCY:

    Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).

    ACTION:

    Final rule.

    SUMMARY:

    This document makes amendments to the Federal Acquisition Regulation (FAR) in order to make editorial changes.

    DATES:

    Effective: September 30, 2016.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ms. Hada Flowers, Regulatory Secretariat Division (MVCB), 1800 F Street NW., 2nd Floor, Washington, DC 20405, 202-501-4755. Please cite FAC 2005-91, Technical Amendments.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    In order to update certain elements in 48 CFR parts 1, 4, 22, 23, 26, and 52 this document makes editorial changes to the FAR.

    Start List of Subjects

    List of Subjects in 48 CFR Parts 1, 4, 22, 23, 26, and 52

    • Government procurement
    End List of Subjects Start Signature

    Dated: September 19, 2016.

    William F. Clark,

    Director, Office of Government-wide Acquisition Policy, Office of Acquisition Policy, Office of Government-wide Policy.

    End Signature

    Therefore, DoD, GSA, and NASA amend 48 CFR parts 1, 4, 22, 23, 26, and 52, as set forth below:

    Start Amendment Part

    1. The authority citation for 48 CFR parts 1, 4, 22, 23, 26, and 52 continues to read as follow:

    End Amendment Part Start Authority

    Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 51 U.S.C. 20113.

    End Authority Start Part

    PART 1—FEDERAL ACQUISITION REGULATIONS SYSTEM

    [Amended]
    End Part Start Amendment Part

    2. Amend section 1.603-1 by removing “ 41 U.S.C. 1702(b)(3)(F)” and adding “41 U.S.C. 1702(b)(3)(G)” in its place.

    End Amendment Part Start Part

    PART 4—ADMINISTRATIVE MATTERS

    [Amended]
    End Part Start Amendment Part

    3. Amend section 4.1400 by removing “ http://usaspending.gov” and adding “https://www.usaspending.gov” in its place.

    End Amendment Part Start Part

    PART 22—APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS

    [Amended]
    End Part Start Amendment Part

    4. Amend section 22.805 by removing from paragraph (a)(4)(i) http://www.dol-esa.gov/​preaward/​ and adding “https://ofccp.dol-esa.gov/​preaward/​pa_​reg.html” in its place.

    End Amendment Part Start Part

    PART 23—ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE

    [Amended]
    End Part Start Amendment Part

    5. Amend section 23.704 by removing from paragraphs (b)(1)(iv) and (b)(2) “ www.epa.gov/​epeat and adding “https://www.epa.gov/​greenerproducts/​epas-recommendations-specifications-standards-and-ecolabels” in its place.

    End Amendment Part Start Part

    PART 26—OTHER SOCIOECONOMIC PROGRAMS

    End Part Start Amendment Part

    6. Amend section 26.103 by revising paragraph (b) to read as follows:

    End Amendment Part
    Procedures.
    * * * * *

    (b) In the event of a challenge to the representation of a subcontractor, the contracting officer shall refer the matter to the U.S. Department of the Interior, Bureau of Indian Affairs (BIA), Attn: Acquisition Management Director, 12220 Sunrise Valley Drive, Reston, VA 20191. The BIA will determine the eligibility and notify the contracting officer.

    * * * * *
    Start Part

    PART 52—SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    End Part Start Amendment Part

    7. Amend section 52.234-1 by revising the section and clause headings and the definition “Title III project contractor” to read as follows:

    End Amendment Part
    Industrial Resources Developed Under Title III, Defense Production Act.
    * * * * *

    Industrial Resources Developed Under Title III, Defense Production Act (Sep 2016)

    * * * * *

    (a) Definitions.

    * * * * *

    Title III project contractor means a contractor that has received assistance for the development or manufacture of an industrial resource under Title III of Defense Production Act (50 U.S.C. App. 2091-2093).

    * * * * *
    End Supplemental Information

    [FR Doc. 2016-23205 Filed 9-29-16; 8:45 am]

    BILLING CODE 6820-EP-P

Document Information

Effective Date:
9/30/2016
Published:
09/30/2016
Department:
National Aeronautics and Space Administration
Entry Type:
Rule
Action:
Final rule.
Document Number:
2016-23205
Dates:
Effective: September 30, 2016.
Pages:
67781-67781 (1 pages)
Docket Numbers:
FAC 2005-91, Item XI, Docket No. 2016-0052, Sequence No. 4
Topics:
Government procurement
PDF File:
2016-23205.pdf
CFR: (6)
48 CFR 4.1400
48 CFR 22.805
48 CFR 23.704
48 CFR 26.103
48 CFR 1.603-1
More ...