2023-12018. Defense Federal Acquisition Regulation Supplement: Management of the Procurement Technical Assistance Agreement Program (DFARS Case 2020-D022)  

  • Start Preamble

    AGENCY:

    Defense Acquisition Regulations System, Department of Defense (DoD).

    ACTION:

    Final rule.

    SUMMARY:

    DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to implement a section of the National Defense Authorization Act for Fiscal Year 2020 that transfers responsibilities for carrying out the procurement technical assistance cooperative agreement program from the Director of the Defense Logistics Agency to the Under Secretary of Defense for Acquisition and Sustainment.

    DATES:

    Effective June 9, 2023.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ms. Jeanette Snyder, 703–508–7524.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    Section 852 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2020 (Pub. L. 116–92) modifies 10 U.S.C. 2411(3) (redesignated 10 U.S.C. 4951) to transfer authority of the procurement technical assistance cooperative agreement (PTAC) program from the Director of the Defense Logistics Agency to the Under Secretary of Defense for Acquisition and Sustainment. This final rule revises a solicitation provision and a contract clause to reflect this statutory change, change the name of the of the entities providing assistance from PTACs to APEX Accelerators, update statutory references, and update the applicable website.

    II. Publication of This Final Rule for Public Comment Is Not Required by Statute

    The statute that applies to the publication of the Federal Acquisition Regulation (FAR) is 41 U.S.C. 1707, Publication of Proposed Regulations. Subsection (a)(1) of the statute requires that a procurement policy, regulation, procedure, or form (including an amendment or modification thereof) must be published for public comment if it relates to the expenditure of appropriated funds, and has either a significant effect beyond the internal operating procedures of the agency issuing the policy, regulation, procedure, or form, or has a significant cost or administrative impact on contractors or offerors. This final rule is not required to be published for public comment, because this rule merely reflects the transfer of responsibility for the PTAC program from the Director of the Defense Logistics Agency to the Under Secretary of Defense for Acquisition and Sustainment, changes the name of the of the entities providing assistance from PTACs to APEX Accelerators, and updates the applicable website. This final rule does not have a significant effect beyond the internal operating procedures of the Government and does not have a significant cost or administrative impact on contractors or offerors.

    III. Applicability to Contracts at or Below the Simplified Acquisition Threshold and for Commercial Services and Commercial Products, Including Commercially Available Off-the-Shelf Items

    This rule does not create any new solicitation provisions or contract clauses. This rule merely updates information provided in the contract clause at DFARS 252.205–7000, Provision of Information to Cooperative Agreement Holders, and the solicitation provision at DFARS 252.219–7000, Advancing Small Business Growth. The rule does not impact the applicability of this clause or provision.

    IV. Executive Orders 12866 and 13563

    Executive Orders (E.O.s) 12866 and 13563 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. This is not a significant regulatory action and, therefore, was not subject to review under section 6(b) of E.O. 12866, Regulatory Planning and Review, dated September 30, 1993.

    V. Congressional Review Act

    As required by the Congressional Review Act (5 U.S.C. 801–808) before an interim or final rule takes effect, DoD will submit a copy of the interim or final rule with the form, Submission of Federal Rules under the Congressional Review Act, to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States. A major rule under the Congressional Review Act cannot take effect until 60 days after it is published in the Federal Register . The Office of Information and Regulatory Affairs has determined that this rule is not a major rule as defined by 5 U.S.C. 804.

    VI. Regulatory Flexibility Act

    The Regulatory Flexibility Act does not apply to this rule because this final rule does not constitute a significant DFARS revision within the meaning of FAR 1.501–1, and 41 U.S.C. 1707 does not require publication for public comment. Start Printed Page 37799

    VII. Paperwork Reduction Act

    The Paperwork Reduction Act (44 U.S.C. chapter 35) applies to this rule. However, these changes to the DFARS do not impose additional information collection requirements to the paperwork burden previously approved by the Office of Management and Budget (OMB) under OMB Control Number 0704–0286, Defense Federal Acquisition Regulation Supplement (DFARS), Part 205, Publicizing Contract Actions, and DFARS 252–205–7000, Provision of Information to Cooperative Agreement Holders.

    Start List of Subjects

    List of Subjects in 48 CFR Part 252

    • Government procurement
    End List of Subjects Start Signature

    Jennifer D. Johnson,

    Editor/Publisher, Defense Acquisition Regulations System.

    End Signature

    Therefore, 48 CFR part 252 is amended as follows:

    Start Part

    PART 252—SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    End Part Start Amendment Part

    1. The authority citation for 48 CFR part 252 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 41 U.S.C. 1303 and 48 CFR chapter 1.

    End Authority Start Amendment Part

    2. Amend section 252.205–7000 by revising the clause heading and clause date and paragraph (a) to read as follows:

    End Amendment Part
    Provision of Information to Cooperative Agreement Holders.
    * * * * *

    Provision of Information to Cooperative Agreement Holders (Jun 2023)

    (a) Definition. Cooperative agreement holder means a State or local government; a private, nonprofit organization; a tribal organization (as defined in section 4(c) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304(l)); or an economic enterprise (as defined in section 3(e) of the Indian Financing Act of 1974 (25 U.S.C. 1452(e))) whether such economic enterprise is organized for profit or nonprofit purposes; which has an agreement with the Under Secretary of Defense for Acquisition and Sustainment to furnish procurement technical assistance to business entities.

    * * * * *
    Start Amendment Part

    3. Amend section 252.219–7000 by revising the clause date and paragraphs (b) and (c) to read as follows:

    End Amendment Part
    Advancing Small Business Growth.
    * * * * *

    Advancing Small Business Growth (Jun 2023)

    * * * * *

    (b) The Offeror acknowledges by submission of its offer that by acceptance of the contract resulting from this solicitation, the Offeror may exceed the applicable small business size standard of the North American Industry Classification System (NAICS) code assigned to the contract and would no longer qualify as a small business concern for that NAICS code. Small business size standards matched to industry NAICS codes are published by the Small Business Administration and are available at 13 CFR 121.201 and https://www.sba.gov/​document/​support-table-size-standards. The Offeror is therefore encouraged to develop the capabilities and characteristics typically desired in contractors that are competitive as other-than-small contractors in this industry.

    (c) For procurement technical assistance, the Offeror may contact the nearest APEX Accelerator. APEX Accelerator locations are available at https://www.apexaccelerators.us.

    * * * * *
    End Supplemental Information

    [FR Doc. 2023–12018 Filed 6–8–23; 8:45 am]

    BILLING CODE 5001–06–P

Document Information

Effective Date:
6/9/2023
Published:
06/09/2023
Department:
Defense Acquisition Regulations System
Entry Type:
Rule
Action:
Final rule.
Document Number:
2023-12018
Dates:
Effective June 9, 2023.
Pages:
37798-37799 (2 pages)
Docket Numbers:
Docket DARS-2023-0023
RINs:
0750-AL08: Management of the Procurement Technical Assistance Agreement Program (DFARS Case 2020-D022)
RIN Links:
https://www.federalregister.gov/regulations/0750-AL08/management-of-the-procurement-technical-assistance-agreement-program-dfars-case-2020-d022-
Topics:
Government procurement
PDF File:
2023-12018.pdf
CFR: (1)
48 CFR 252