94-437. Williston Basin Interstate Pipeline Co.; Fuel Reimbursement Charge Filing
[Federal Register Volume 59, Number 6 (Monday, January 10, 1994)]
[Notices]
[Pages 1398-1399]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-437]
[[Page Unknown]]
[Federal Register: January 10, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. TM94-3-49-000]
Williston Basin Interstate Pipeline Co.; Fuel Reimbursement
Charge Filing
January 4, 1994.
Take notice that on December 30, 1993, Williston Basin Interstate
Pipeline Company (Williston Basin), tendered for filing as part of its
FERC Gas Tariff the following revised tariff sheets:
Second Revised Volume No. 1
Third Revised Sheet No. 15
Second Revised Sheet No. 15A
Third Revised Sheet No. 16
Second Revised Sheet No. 16A
Third Revised Sheet No. 18
Second Revised Sheet No. 18A
Second Revised Sheet No. 19
Second Revised Sheet No. 20
Third Revised Sheet No. 21
Original Volume No. 2
Fifty-second Revised Sheet No. 10
Fiftieth Revised Sheet No. 11B
The proposed effective date of the tariff sheets is February 1,
1994.
Williston Basin states that the revised tariff sheets reflect
revisions to the fuel reimbursement charge and percentage components of
the Company's relevant gathering, transportation and storage rates,
pursuant to Williston Basin's Fuel Reimbursement Adjustment Provision,
contained in Section 38 of the General Terms, and Conditions of Second
Revised Volume No. 1 of Williston Basin's FERC Gas Tariff.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 385.214). All such
motions or protests should be filed on or before January 11, 1994.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make the
protestants parties to the proceeding. Any person wishing to become a
party to the proceeding must file a motion to intervene. Copies of the
filing are on file with the Commission and are available for public
inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-437 Filed 1-7-94; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 01/10/1994
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 94-437
- Pages:
- 1398-1399 (2 pages)
- Docket Numbers:
- Federal Register: January 10, 1994, Docket No. TM94-3-49-000