96-387. Blue Mountain Power, L.P.; Notice of Filing of Coal Capability Powerplant and Industrial Fuel Use Act  

  • [Federal Register Volume 61, Number 7 (Wednesday, January 10, 1996)]
    [Notices]
    [Page 725]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-387]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Office of Fossil Energy.
    
    [Docket No. FE C&E 95-02--Certification Notice--148]
    
    
    Blue Mountain Power, L.P.; Notice of Filing of Coal Capability 
    Powerplant and Industrial Fuel Use Act
    
    AGENCY: Office of Fossil Energy, Department of Energy
    ACTION: Notice of filing.
    
    -----------------------------------------------------------------------
    
    SUMMARY: On December 18, 1995, Blue Mountain Power, L.P., submitted a 
    coal capability self-certification pursuant to section 201 of the 
    Powerplant and Industrial Fuel Use Act of 1978, as amended.
    
    ADDRESSES: Copies of self-certification filings are available for 
    public inspection, upon request, in the Office of Fuels Programs, 
    Fossil Energy, Room 3F-056, FE-52, Forrestal Building, 1000 
    Independence Avenue, S.W., Washington, D.C. 20585.
    
    FOR FURTHER INFORMATION CONTACT: Ellen Russell at (202) 586-9624.
    
    SUPPLEMENTARY INFORMATION: Title II of the Powerplant and Industrial 
    Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8301 et seq.), 
    provides that no new baseload electric powerplant may be constructed or 
    operated without the capability to use coal or another alternate fuel 
    as a primary energy source. In order to meet the requirement of coal 
    capability, the owner or operator of such facilities proposing to use 
    natural gas or petroleum as its primary energy source shall certify, 
    pursuant to FUA section 201(d), to the Secretary of Energy prior to 
    construction, or prior to operation as a base load powerplant, that 
    such powerplant has the capability to use coal or another alternate 
    fuel. Such certification establishes compliance with section 201(a) as 
    of the date filed with the Department of Energy. The Secretary is 
    required to publish a notice in the Federal Register that a 
    certification has been filed. The following owner/operator of a 
    proposed new baseload powerplant has filed a self-certification in 
    acccordance with section 201(d).
        Owner: Blue Mountain Power, L.P.
        Operator: Destec Operating Company.
        Location: Richland Township, in Bucks County adjacent to 
    Quakertown, PA.
        Plant Configuration: Combined cycle.
        Capacity: 150 megawatts.
        Fuel: Natural gas.
        Purchasing Entities: Metropolitan Edison.
        In-Service Dates: Late 1997.
    
        Issued in Washington, D.C., December 29, 1995.
    Anthony J. Como,
    Director, Office of Coal & Electricity, Office of Fuels Programs, 
    Office of Fossil Energy.
    [FR Doc. 96-387 Filed 1-9-96; 8:45 am]
    BILLING CODE 6450-01-P
    
    

Document Information

Published:
01/10/1996
Department:
Energy Department
Entry Type:
Notice
Action:
Notice of filing.
Document Number:
96-387
Dates:
Late 1997.
Pages:
725-725 (1 pages)
Docket Numbers:
Docket No. FE C&E 95-02--Certification Notice--148
PDF File:
96-387.pdf