-
Start Preamble
January 4, 2001.
Take notice that on December 22, 2000, Panda Gila River, L.P. (Panda Gila River), tendered for filing an amendment to its First Revised FERC Electric Rate Schedule No. 1, filed with the Commission on November 2, 2000, in the above-referenced docket.
Any person desiring to be heard or to protest such filing should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, DC 20426, in accordance with rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 385.214). All such motions and protests should be filed on or before January 12, 2001. Protests will be considered by the Commission to determine the appropriate action to be taken, but will not serve to serve to make protestants parties to the proceedings. Any person wishing to become a party must file a motion to intervene. Copies of this filing are on file with the Commission and are available for public inspection. This filing may also be viewed on the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance). Comments and protests may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's web site at http://www.ferc.fed.us/efi/doorbell.htm.
Start SignatureLinwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 01-720 Filed 1-9-01; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 01/10/2001
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 01-720
- Pages:
- 1974-1974 (1 pages)
- Docket Numbers:
- Docket No. ER01-353-001
- EOCitation:
- of 2001-01-04
- PDF File:
- 01-720.pdf