2024-31566. Seaway Regulations and Rules: Periodic Update, Various Categories  

  • Table 1 to Paragraph ( d )

    Overall length of ships Length of mooring line (m) Breaking strength (MT)
    40 m or more but not more than 60 m 110 10
    more than 60 m but not more than 90 m 110 15
    more than 90 m but not more than 120 m 110 20
    more than 120 m but not more than 180 m 110 28
    more than 180 m but not more than 200 m 110 31
    more than 200 m but not more than 225.5 m 110 35
    Elongation of synthetic lines shall not exceed 20%.
    * * * * *

4. Amend § 401.12 by revising the table in paragraph (b) to read as follows:

Minimum requirements—mooring lines and fairleads.
* * * * *

(b) * * *

Table 1 to Paragraph ( b )

Overall length of ships For mooring lines Nos. 1 and 2 For mooring lines Nos. 3 and 4
100 m or more but not more than 180 m Shall be at a location on the ship side where the beam is at least 90% of the full beam of the ship Shall be at a location on the ship side where the beam is at least 90% of the full beam of the ship.
more than 180 m but not more than 225.5m Between 20 m & 50 m from the stern Between 20 m & 50 m from the stern.

Document Information

Effective Date:
1/10/2025
Published:
01/10/2025
Department:
609
Entry Type:
Rule
Action:
Final rule.
Document Number:
2024-31566
Dates:
This rule is effective on January 10, 2025.
Pages:
1881-1884 (4 pages)
Topics:
Hazardous materials transportation, Navigation (water), Penalties, Radio, Reporting and recordkeeping requirements, Vessels, Waterways
PDF File:
2024-31566.pdf
CFR: (1)
33 CFR 401