94-685. PSI Energy, Inc., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 59, Number 8 (Wednesday, January 12, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-685]
    
    
    [[Page Unknown]]
    
    [Federal Register: January 12, 1994]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. ER93-712-000, et al.]
    
     
    
    PSI Energy, Inc., et al.; Electric Rate and Corporate Regulation 
    Filings
    
    January 5, 1994.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. PSI Energy, Inc.
    
    [Docket No. ER93-712-000]
    
        Take notice that PSI Energy, Inc. (PSI) and the City of Logansport, 
    Indiana on December 17, 1993, tendered for filing additional supporting 
    information to the FERC Filing in Docket No. ER93-712-000 to comply 
    with a FERC staff request.
        Copies of the filing were served on the City of Logansport Indiana 
    and the Indiana Utility Regulatory Commission.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    2. Madison Gas Electric Co.
    
    [Docket No. ER94-66-000]
    
        Take notice that on December 17, 1994, Madison Gas and Electric 
    Company (MGE) tendered for filing with the Federal Energy Regulatory 
    Commission revised pages from the Interchange Agreements it and 
    Heartland Energy Services, Inc. (HES). The revision caps the price of 
    the daily rate for Negotiated Capacity and General Purpose Energy at 
    the rate for weekly service. MGE and HES respectfully request an 
    effective date of December 31, 1993.
        MGE states that a copy of the filing has been provided to HES and 
    the Public Service Commission of Wisconsin.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. Florida Power Corp.
    
    [Docket No. ER94-275-000]
    
        Take notice that on December 16, 1993, Florida Power Corporation 
    (Florida Power) requested the Commission to disclaim jurisdiction over 
    agreements under which Florida Power rents distribution facilities to 
    the City of Mount Dora, Florida, and Reedy Creek Utilities Company, 
    respectively, or, if the Commission asserts jurisdiction, to accept the 
    agreements for filing to become effective September 1, 1988 and June 5, 
    1978, respectively.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. Arizona Public Service Co.
    
    [Docket No. ER94-276-000]
    
        Take notice that on December 16, 1993, Arizona Public Service 
    Company (APS) tendered for filing the Interconnection Agreement 
    (Agreement) between The United States of America on Behalf of The 
    Colorado River Indian Irrigation Project (CRIP) and APS and Service 
    Schedules A and B to the Agreement.
        The Agreement provides a means by which the Parties will develop 
    and operate their respective electric systems in a coordinated manner. 
    The Service Schedules allow for various reciprocal transmission related 
    services.
        Copies of this filing have been served upon CRIP and the Arizona 
    Corporation Commission.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. PacifiCorp
    
    [Docket No. ER94-283-000]
    
        Take notice that PacifiCorp, on December 17, 1993, tendered for 
    filing in accordance with the Commission's Order pertaining to 
    agreements involving final amnesty for jurisdictional service and 
    waiver of notice, issued July 30, 1993 under Docket No. PL93-2-002, 
    (Final Order) the Western Systems Coordinating Council (WSCC) 
    Agreement, as amended, dated August 4, 1967 and the Western Systems 
    Coordinating Council Agreement, dated November 18, 1993.
        Copies of this filing were supplied to all parties to the WSCC 
    Agreement, the Public Utility Commission of Oregon and the Utah Public 
    Service Commission.
        PacifiCorp requests that the Commission disclaim jurisdiction of 
    the WSCC Agreements or if the Commission does assert jurisdiction 
    PacifiCorp requests in accordance with the Final Order and 18 CFR 35.11 
    of the Commission's Rules and Regulations and that a waiver of prior 
    notice requirements be granted.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Wisconsin Public Service Corp.
    
    [Docket No. ER94-284-000]
    
        Take notice that on December 17, 1993, Wisconsin Public Service 
    Corporation (WPSC) tendered for filing an executed Transmission Service 
    Agreement between WPS and Heartland Energy Services Inc. The Agreement 
    provides for transmission service under the T-1 Transmission Tariff, 
    FERC Original Volume No. 4.
        WPS asks that the agreement become effective January 1, 1994.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. New England Power Co.
    
    [Docket No. ER94-286-000]
    
        Take notice that on December 20, 1993, New England Power Company 
    (NEP) submitted for filing executed Amendments to its Service 
    Agreements with Granite State Electric Company, New Hampshire Electric 
    Cooperative, and the Town of Littleton, New Hampshire (hereinafter 
    Customers) under NEP's FERC Electric Tariff, Original Volume No. 1.
        NEP states that the proposed Amendments provide a monthly credit to 
    its New Hampshire Customers based on a portion of the savings received 
    by NEP through the issuance of tax-exempt financing authorized by the 
    State of New Hampshire.
        NEP requests waiver of the Commission's notice requirements so that 
    the Amendments may become effective on January 1, 1994.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Green Mountain Power Corp.
    
    [Docket No. ER94-287-000]
    
        Take notice that on December 20, 1993, Green Mountain Power 
    Corporation (GMP) tendered for filing a Service Agreement and 
    Certificate of Concurrence for Montaup Electric Company under FERC 
    Electric Tariff No. 2, known as GMP's Opportunity Transaction Tariff 
    (Tariff). The Service Agreement is intended to supersede the unexecuted 
    Service Agreement for Eastern Utilities Associates. The Service 
    Agreement and Certificate of Concurrence will allow Montaup to enter 
    into transactions, including exchange unit transactions, in accordance 
    with the Tariff. No terms or conditions of the Tariff are affected by 
    the form of Service Agreement.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Midwest Power Systems Inc.
    
    [Docket No. ER94-288-000]
    
        Take notice that on December 20, 1993, Midwest Power Systems Inc. 
    (MPSI) tendered for filing a ``Construction and Financing Agreement'' 
    (Financing Agreement) dated March 5, 1990, and a ``First Amendment to 
    Financing Agreement'' (Amendment) dated December 10, 1992, between 
    Associated Electric Cooperative, Inc. (AEC) and Iowa Power Inc., n/k/a 
    MPSI. The Financing Agreement and the Amendment provide for the 
    financing of MPSI's portion of certain MINT Line project facilities by 
    AEC. MPSI received no financial gain from the Financing Agreement and 
    the Amendment.
        On July 30, 1993, the Commission issued its ``Final Order'' in 
    Docket No. PL93-2-002, ``Prior Notice and Filing Requirement'', 
    clarifying that agreements for joint ownership of transmission 
    facilities must be filed. The Final Order also established an amnesty 
    period during which such filings can be brought up to date. This filing 
    falls within the provisions of the amnesty period.
        MPSI requests a waiver of the Commission's rules so that the 
    Financing Agreement may be approved retroactive to March 5, 1990, and 
    the Amendment may be approved retroactive to October 1, 1992.
        MPSI states that copies of this filing were served on Associated 
    Electric and the Iowa Utilities Board.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Midwest Power Systems Inc.
    
    [Docket No. ER94-289-000]
    
        Take notice that on December 20, 1993, Midwest Power Systems, Inc. 
    (MPSI) tendered for filing a Peaking Capacity Sales Agreement 
    (Agreement) dated June 6, 1991, between Corn Belt Power Cooperative 
    (Corn Belt) and Iowa Public Service Company, n/k/a MPSI. This 
    Agreement's principle purpose is to establish terms for MPSI to 
    purchase capacity and energy from Corn Belt from June 1, 1994, through 
    September 30, 2000. Paragraph 12 of the Agreement allows for MPSI to 
    sell capacity and energy to Corn Belt, at Corn Belt's sole option, in 
    the months of October and November of each respective year.
        On July 30, 1993, the Commission issued its ``Final Order'' in 
    Docket No. PL93-2-002, ``Prior Notice and Filing Requirements'', 
    clarifying that agreements for ``the sale of electric power and energy 
    to any person'' must be filed. The Final Order also established an 
    amnesty period during which such filings can be brought up to date. 
    This filing falls within the provisions of the amnesty period.
        MPSI requests that the Peaking Capacity Sales Agreement be approved 
    effective June 1, 1994.
        MPSI states that copies of this filing were served on Corn Belt and 
    the Iowa Utilities Board.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Midwest Power Systems Inc.
    
    [Docket No. ER94-290-000]
    
        Take notice that on December 20, 1993, Midwest Power Systems Inc. 
    (MPSI) tendered for filing a Transmission Line Terminal Facilities 
    Agreement (Facilities Agreement) dated March 5, 1990, between Nebraska 
    Public Power District (NPPD); Omaha Public Power District (OPPD), City 
    of Lincoln, Nebraska (Lincoln); and Iowa Power Inc., n/k/a MPSI. The 
    primary purpose of the Facilities Agreement is to provide for the 
    construction, finance, maintenance, and ownership responsibilities of 
    the Cooper Terminal Facilities. MPSI, OPPD, and Lincoln shall make 
    payments to NPPD for the right to use the Cooper Substation, including 
    the Cooper Terminal Facilities, for the purpose of scheduling power and 
    energy transactions pursuant to the MINT Line Coordinating Agreement.
        On July 30, 1993, the Commission issued its ``Final Order'' in 
    Docket No. PL93-2-002, ``Prior Notice and Filing Requirements'', 
    clarifying that agreements for the joint ownership of transmission 
    facilities must be filed. The Final Order also established an amnesty 
    period during which such filings can be brought up to date. This filing 
    falls within the provisions of the amnesty period.
        MPSI respectfully requests a waiver of the Commission's rules so 
    that the Transmission Line Facilities Agreement may be approved 
    retroactive to March 5, 1990.
        MPSI states that copies of this filing were served on NPPD, OPPD, 
    and Lincoln and the Iowa Utilities Board.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Northeast Utilities Service Co.
    
    [Docket No. ER94-291-000]
    
        Take notice that on December 20, 1993, Northeast Utilities Service 
    Company (NUSCO) tendered for filing a Service Agreement to provide non-
    firm transmission service to Massachusetts Municipal Wholesale Electric 
    Company (MMWEC) under the NU System Companies' Transmission Service 
    Tariff No. 2. NUSCO states that a copy of this information has been 
    mailed to MMWEC.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. PacifiCorp
    
    [Docket No. ER94-292-000]
    
        Take notice that PacifiCorp, on December 20, 1993, tendered for 
    filing in accordance with Commission's Order pertaining to agreements 
    involving final amnesty for jurisdictional service and waiver of 
    notice, issued July 30, 1993 under Docket No. PL93-2-002, agreements 
    which contain provisions involving a return of energy losses associated 
    with the purchase of Formula Power Transmission service from the 
    Bonneville Power Administration (Bonneville).
        Copies of this filing were supplied to Bonneville, the Public 
    Utility Commission of Oregon and the Utah Public Service Commission. 
    PacifiCorp requests in accordance with 18 CFR 35.11 of the Commission's 
    Rules and Regulations and that a waiver of prior notice requirements be 
    granted and that the filed agreements be accepted for filing effective 
    as indicated for each of the agreements.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. PacifiCorp
    
    [Docket No. ER94-293-000]
    
        Take notice that PacifiCorp, on December 20, 1993, tendered for 
    filing a Draft Harrison Interconnection and Transmission Facilities 
    Conveyance Agreements between PacifiCorp and Portland General Electric 
    Company (Portland General), dated September 9, 1993 which provide for 
    an interconnection between PacifiCorp's and Portland's systems at 
    PacifiCorp's Harrison Substation.
        PacifiCorp requests that a waiver of prior notice be granted 
    pursuant to the Commission's Final Order in Docket No. PL93-2-002 and 
    that an effective date of October 31, 1990 be assigned to the filed 
    agreement.
        Copies of this filing were supplied to Portland and the Public 
    Utility Commission of Oregon.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. PacifiCorp
    
    [Docket No. ER94-294-000]
    
        Take notice that on December 20, 1993, PacifiCorp tendered for 
    filing, Amendment No. 2 to Contract No. 14-06-100-1152, Contract 
    Between The United States of America and PacifiCorp For Use of 
    Facilities For The Transmission of Electrical Power and Energy whereby 
    PacifiCorp provides transfers to the Bureau of Reclamation (BuRec) 
    Burbank Pumping Plants No. 2 and No. 3.
        PacifiCorp requests a waiver of the Commission's prior notice 
    requirements.
        Copies of this filing have been supplied to BuRec, the South 
    Columbia Basin Irrigation District, the Washington Utilities and 
    Transportation Commission, the Public Utility Commission of Oregon and 
    the Utah Public Service Commission.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. PacifiCorp
    
    [Docket No. ER94-295-000]
    
        Take notice that PacifiCorp on December 20, 1993, tendered for 
    filing a Letter Agreement between PacifiCorp and the City of Idaho 
    Falls, Idaho (Idaho Falls), dated January 16, 1989 for reciprocal 
    emergency backup electrical service.
        PacifiCorp requests a waiver of prior notice be granted and that an 
    effective date of February 28, 1989 be assigned to the Letter 
    Agreement. This date is the date Idaho Falls executed the Letter 
    Agreement.
        Copies of this filing were supplied to Idaho Falls and the 
    Bonneville Power Administration.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. Wisconsin Power and Light Co.
    
    [Docket No. ER94-296-000]
    
        Take notice that on December 17, 1993, Wisconsin Power and Light 
    Company tendered for filing with the Federal Energy Regulatory 
    Commission four Letter Agreements between Wisconsin Power and Light 
    Company (WP&L) and Manitowoc Public Utilities (MPU). Under the 
    Negotiated Capacity Agreement, WP&L will make capacity and associated 
    energy available to MPU and negotiated degrees of firmness, variable 
    capacity charges, and variable time duration. Under the General Purpose 
    Energy Agreement, WP&L will make non-firm energy available to MPU, with 
    terms and quantities to be arranged by mutual agreement. Under the 
    Emergency Energy Agreement, WP&L will make non-firm emergency energy 
    available to MPU in quantities that, in WP&L's sole judgement, it can 
    supply. Under the Negotiated Capacity Sub-Agreement, WP&L will supply 
    MPU with 10 MW of firm power and energy from June 1, 1994 through May 
    31, 1995.
        Wisconsin Power and Light respectfully requests an effective date 
    sixty (60) days from the date of filing.
        A copy of the filing has been served on the Public Service 
    Commission of Wisconsin.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Commonwealth Edison Co.
    
    [Docket No. ER94-297-000]
    
        Take notice that on December 20, 1993, Commonwealth Edison Company 
    (Edison) submitted a Service Agreement, dated November 16, 1993, 
    establishing PSI Energy, Inc. (PSI) as a customer under the terms of 
    Edison's Power Sales Tariff PS-1 (PS-1 Tariff). The Commission has 
    previously designated the PS-1 Tariff as FERC Electric Tariff, Original 
    Volume No. 2.
        Edison requests an effective date of December 1, 1993, and 
    accordingly seeks waiver of the Commission's notice requirements. 
    Copies of this filing were served upon PSI and the Illinois Commerce 
    Commission.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. Jersey Central Power & Light Co., et al.
    
    [Docket No. ER94-298-000]
    
        Take notice that on December 20, 1993, Jersey Central Power & Light 
    Company, Metropolitan Edison Company, Pennsylvania Electric Company and 
    GPU Nuclear Corporation, (the GPU Companies) tendered for filing rate 
    schedules relating to the provision of operating and maintenance 
    services for five generating stations located in New Jersey and 
    Pennsylvania, namely, the Yards Creek and Kinzua (Seneca) pumped 
    storage hydroelectric stations, the Homer City coal-fired generating 
    station, and the Three Mile Island Oyster Creek nuclear generating 
    stations. The subject rate schedules were filed in response to the 
    Orders of the Federal Energy Regulatory Commission issued July 30, 1993 
    and October 19, 1993.
        Copies of the filing have been furnished to the Pennsylvania Public 
    Utility Commission of New Jersey Board of Regulatory Commissioners.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. Jersey Central Power & Light Co.
    
    [Docket No. ER94-299-000]
    
        Take notice that on December 20, 1993, in response to the Orders of 
    the Commission, dated July 30, 1993 and October 19, 1993, relating to 
    the Prior Notice and Filing Requirements of the Federal Power Act in 
    FERC Docket No. PL93-2, Jersey Central Power & Light Company (JCP&L) 
    tendered for filing a proposed rate schedule supplement showing JCP&L's 
    charges to Atlantic City Electric Company (ACE) to defray JCP&L's cost 
    of operation and maintenance of certain interconnection facilities 
    during the years 1982-1993 and proposed for 1994 relating to JCP&L's 
    Interconnection Agreement with Atlantic City Electric Company (ACE) 
    dated as of March 1, 1978.
        Copies of the filing have been furnished to the New Jersey Board of 
    Regulatory Commissioners.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. Central Vermont Public Service Corp.
    
    [Docket No. ER94-300-000]
    
        Take notice that Central Vermont Public Service Corporation (CVPS) 
    on December 20, 1993, tendered for filing Borderline Agreement between 
    New York State Electric & Gas Corporation and CVPS.
        CVPS requests the Commission to waive its notice of filing 
    requirements to permit the original contracts to become effective 
    according to their respective terms.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. Central Hudson Gas & Electric Corp.
    
    [Docket No. ER94-302-000]
    
        Take notice that on December 20, 1993, Central Hudson Gas and 
    Electric Corporation (CHG&E) tendered for filing an amendment to FERC 
    Docket No. ER85-648-000 dated May 4, 1990 between CHG&E and New York 
    Power Authority (NYPA). The amended agreement expands the firm 
    transmission service provided by CHG&E for NYPA to include service on 
    behalf of Economic Development Customers located in Orange & Rockland 
    Utilities, Inc. service territory. In addition, the point of delivery 
    of NYPA power and energy to CHG&E will be changed to CHG&E's Rock 
    Tavern substation.
        All other provisions of Docket ER85-648-000 shall remain in effect. 
    CHG&E states that copies of the subject filing were served upon NYPA.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. Central Hudson Gas & Electric Corp.
    
    [Docket No. ER94-303-000]
    
        Take notice that on December 20, 1993, Central Hudson Gas & 
    Electric Corporation (CHG&E) tendered for filing an amendment to FERC 
    Contract No. 73 dated March 11, 1991 between CHG&E and Orange & 
    Rockland Utilities, Inc. (O&R). The amended contract expands the 
    transmission wheeling service provided by CHG&E to O&R to include the 
    purchase of capacity and energy from the various sources of the New 
    York Power Authority.
        All other provisions including the rate that will be charged, of 
    the existing contract remain in effect. CHG&E states that copies of the 
    subject filing were served upon O&R.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. Central Hudson Gas & Electric Corp.
    
    [Docket No. ER94-304-000]
    
        Take notice that on December 20, 1993, Central Hudson Gas & 
    Electric Corporation (CHG&E) tendered for filing an amendment to FERC 
    Contract No. 26 dated August 26, 1993 between CHG&E and New York State 
    Electric and Gas Corporation (NYSEG). The amended contract provides for 
    an increase in the facilities charge associated with investment at the 
    Smithfield Substation due to the replacement of a motor-operated 
    manually controlled air break switch with a supervisory controlled 
    circuit breaker.
        The facilities charge increases from $57.00 per month to $2,415.00 
    per month and is retroactive to August 16, 1991 the date on which the 
    circuit breaker was placed in service.
        All other provisions of FERC Contract No. 26 shall remain in 
    effect. CHG&E states that copies of the subject filing were served upon 
    NYSEG.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    25. Nevada Power Co.
    
    [Docket No. ER94-305-000]
    
        Take notice that on December 20, 1993, Nevada Power Company (NPC), 
    tendered for filing the Participation Agreement Reid Gardner Unit 4 
    (Agreement) between NPC and the California Department of Water 
    Resources (CDWR) and subsequent changes to the transmission rate 
    included in this Agreement. This Agreement provides for the Terms and 
    Conditions for participation in the operation of the Reid Gardner Unit 
    4, a coal-fired steam generation unit of approximately 250 MW located 
    at NPC's Reid Gardner generating station site in Clark County, Nevada.
        Pursuant to 18 CFR 35.11, NPC requests waiver of the Commission's 
    notice requirements, 18 CFR 35.3, to allow for an effective date of May 
    10, 1983. Additionally, pursuant to the Commission's findings in FERC 
    docket No. PL93-2-002, NPC requests that all amnesty provisions be 
    allowed.
        Copies of this filing were served on CDWR and the Nevada Public 
    Service Commission.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. Keystone Energy Service Co.
    
    [Docket No. ER94-306-000]
    
        Take notice that on December 20, 1993, Keystone Energy Service 
    Company, L.P. (Keystone) tendered for filing, pursuant to Section 205 
    of the Federal Power Act and Rule 207 of the Rules of Practice and 
    Procedure of the Federal Energy Regulatory Commission (the 
    ``Commission'') a ``Petition for Acceptance of Initial Rate Schedule 
    and Waiver of Certain Commission Regulations'' and an Initial Rate 
    Schedule requesting the Commission approve, on a market basis, an 
    Agreement for the Purchase of Electric Power between Keystone and 
    Atlantic City Electric Company (ACE), as amended for the sale of 
    capacity and associated from Keystone's cogeneration facility located 
    in Logan Township, New Jersey. Keystone has requested a waiver of the 
    notice requirements to permit filing of the Initial Rate Schedule more 
    than 120 days prior to the proposed effective date.
        Keystone has served a copy of the Petition on ACE.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. Central Vermont Public Service Corp.
    
    [Docket No. ER94-307-000]
    
        Take notice that on December 20, 1993, Central Vermont Public 
    Service Corporation Inc. (CVPS), tendered for filing six 
    Interconnections Agreements with the following Vermont facilities: 
    Comtu Falls Corporation, Hydro Energies Corporation, Emerson Falls 
    Hydro, Inc., Killington Hydroelectric Inc., Martinsville Hydro 
    Corporation, and Springfield Hydroelectric Company as provided for 
    pursuant to PL93-2-002.
        CVPS requests the Commission to waive its notice of filing 
    requirements to permit the original contracts to become effective 
    according to their respective terms.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. Illinois Power Co.
    
    [Docket No. ER94-311-000]
    
        Take notice that on December 20, 1993, Illinois Power Company (IP) 
    tendered for filing changes to Appendix A to the Interconnection 
    Agreement between Central Illinois Power Service Company (CIPS), 
    Illinois Power Company (IP), and Union Electric Company (UE). The 
    changes provide for an additional point of interconnection between CIPS 
    and IP, CIPS-IP Connection 39 - Sidney - West Kansas. IP proposes an 
    effective date of October 1, 1983, and therefore, requests waiver of 
    the Commission's notice requirements. The other changes to Appendix A 
    include minor revisions to existing connection point working and the 
    deletion of four connection points.
        IP also tenders for filing a Reserve and Emergency Interchange 
    Agreement and appendices ``G'', ``H'', ``I'', and ``J'' dated December 
    15, 1993.
        Finally, IP tenders for filing a revised Appendix ``Q'' to the 
    Facility Use Agreement between IP and CIPS dated January 17, 1956.
        Copies of the filing have been served on CIPS, UE, and the Illinois 
    Commerce Commission.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    29. PacifiCorp
    
    [Docket No. ER94-312-000]
    
        Take notice that on December 20, 1993, PacifiCorp, tendered for 
    filing in accordance with the Commission's Order pertaining to 
    agreements involving final amnesty for jurisdictional service and 
    waiver of notice, issued July 30, 1993 under Docket No. PL93-2-003 
    (Final Order). Agreement Limiting Liability Among Western 
    Interconnection Systems and related materials entitled Western 
    Interconnected Electric Systems Blackout/Brownout Insurance Program 
    (Related Materials).
        Copies of this filing were supplied to all parties to WIES, the 
    Public Utility Commission of Oregon and the Utah Public Service 
    Commission.
        PacifiCorp requests that the Commission disclaim jurisdiction of 
    the Agreement Limiting Liability Among Western Interconnected Systems 
    and/or Related Materials or, in the alternative, grant a waiver of 
    prior notice pursuant to 18 CFR 35.11 of the Commission's Rules and 
    Regulations to allow the Agreement to become effective as of the date 
    that each jurisdictional party executed the Agreement.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    30. San Diego Gas & Electric Co.
    
    [Docket No. ER94-317-000]
    
        Take notice that on December 21, 1993, San Diego Gas & Electric 
    Company (SDG&E) tendered for filing and acceptance, pursuant to 18 CFR 
    35.12, an Interchange Agreement (Agreement) between SDG&E and the City 
    of Riverside (Riverside).
        SDG&E requests that the Commission allow the Agreement to become 
    effective on the 1st of March, 1994 or at the earliest possible date.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and Riverside.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    31. Tucson Electric Power Co.
    
    [Docket No. ER94-322-000]
    
        Take notice that on December 21, 1993, Tucson Electric Power 
    Company (Tucson) tendered for filing an Amendment No. 1 to an Economy 
    Energy Agreement between Tucson and Arizona Power Authority (APA). The 
    Amendment was executed in response to a Staff request for more specific 
    definition of certain terms contained in the Agreement.
        The parties request an effective date of November 22, 1993, and 
    therefore request waiver of the Commission's regulations with respect 
    to notice of filing.
        Copies of this filing have been served upon all parties affected by 
    this proceeding.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    32. Montaup Electric Co.
    
    [Docket No. ER94-324-000]
    
        Take notice that on December 21, 1993, Montaup Electric Company 
    filed an Exhibit A designated Series No. 11, Newport No. 5, specifying 
    electric power to be transmitted under the Service Agreement No. 6 with 
    Newport Electric Corporation dated September 30, 1989 on file with the 
    Commission under Docket No. ER85-391-000. Under the Amnesty Order 
    issued July 30, 1993 in Docket No. PL93-2-002, Montaup requests waiver 
    of the 60-day notice requirement to permit the service to become 
    effective on March 1, 1985.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    33. New England Power Co. and Granite State Electric Co.
    
    [Docket No. ER94-326-000]
    
        Take notice that on December 21, 1993, New England Power Company 
    (NEP) and Granite State Electric Company, tendered for filing a 
    Property Sharing Agreement.
        Pursuant to the Commission's Final Order in Docket No. PL93-2-000, 
    dated July 31, 1993, the two companies request waiver of the 
    Commission's notice requirements so that the Agreement may be made 
    effective November 2, 1993.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    34. Niagara Mohawk Power Corp.
    
    [Docket No. ER94-328-000]
    
        Take notice that on December 21, 1993, Niagara Mohawk Power 
    Corporation (Niagara Mohawk), tendered for filing an agreement between 
    Niagara Mohawk and the New York Power Authority (NYPA) dated December 
    13, 1993 providing for the terms and conditions of loss compensation 
    for control area transactions.
        The effective date of January 1, 1988 is requested by Niagara 
    Mohawk.
        Copies of this filing were served upon NYPA and the New York State 
    Public Service Commission.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    35. Niagara Mohawk Power Corp.
    
    [Docket No. ER94-329-000]
    
        Take notice that on December 21, 1993, Niagara Mohawk Power 
    Corporation (Niagara Mohawk), tendered for filing an agreement between 
    Niagara Mohawk and Lockport Energy Associates, L.P. (Lockport) dated 
    April 24, 1992 providing for the terms and conditions of an 
    interconnect between Lockport's cogeneration facility and Niagara 
    Mohawk's transmission system.
        The effective date of April 24, 1992 is requested by Niagara 
    Mohawk.
        Copies of this filing were served upon Lockport and the New York 
    State Public Service Commission.
        Comment date: January 20, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, NE., Washington, DC 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell.
    Secretary.
    [FR Doc. 94-685 Filed 1-11-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
01/12/1994
Department:
Federal Energy Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-685
Dates:
January 20, 1994, in accordance with Standard Paragraph E at the end of this notice.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: January 12, 1994, Docket No. ER93-712-000, et al.