DEPARTMENT OF ENERGY
[Project No. 2354-018]
Georgia Power Co.; Notice of Intent To Prepare an Environmental
Assessment
January 6, 1994.
The Federal Energy Regulatory Commission (FERC) has received an
application for relicensing of the existing North Georgia Hydroelectric
Project (project). The project is located on the Tallulah, Tugalo, and
Chattooga Rivers in Northeast Georgia and Northwest South Carolina. The
project consists of six hydroelectric developments and is within the
Savannah River Basin.
The FERC staff intends to prepare an Environmental Assessment (EA)
on the hydroelectric project in accordance with the National
Environmental Policy Act.
The EA will objectively consider both site-specific and cumulative
environmental impacts of the project and reasonable alternatives, and
will include economic and engineering analyses.
A draft EA will be issued and circulated for review by all
interested parties. All comments filed on the draft EA will be analyzed
by the staff and considered in the final EA. The staff's conclusions
and recommendations will then be presented for the consideration of the
Commission in reaching its final licensing decision.
The purpose of this notice and the scoping document, which is being
sent to interested individuals, organizations, and agencies with
environmental expertise and concerns, is to solicit from those entities
comments that will assist the staff in identifying the scope of
environmental issues that should be analyzed in the EA.
The scoping document will: (1) Identify preliminary environmental
issues related to the proposed project, (2) identify preliminary
resource issues that are not important and do not require detailed
analysis, (3) identify reasonable alternatives to be addressed in the
EA, and (4) solicit all available information, especially quantified
data, on the resource issues, including points of view in opposition
to, or in support of, the staff's preliminary views.
Written comments must be filed no later than March 3, 1994 with:
Secretary, Federal Energy Regulatory Commission, 825 North Capitol
Street, NE., Washington, DC 20426.
All written correspondence should clearly show the following
caption on the first page:
North Georgia Hydroelectric Project, (FERC Project No. 2354-018)
Intervenors, those on the Commission's service list for this
proceeding (parties), are reminded of the Commission's Rules of
Practice and Procedure, requiring parties filing documents with the
Commission, to serve a copy of the document on each person whose name
appears on the official service list. Further, if a party or interceder
files comments or documents with the Commission relating to the merits
of an issue that may affect the responsibilities of a particular
resource agency, they must also serve a copy of the document on that
resource agency.
A two-day site visit to the project is planned for January 31 and
February 1, 1994. Those who wish to attend should contact Ms. JoLee
Gardner, Georgia Power Company, at (404) 526-3576, by January 20, 1994,
for details.
Any questions regarding this notice may be directed to Joe Davis,
Environmental Coordinator, at (202) 219-2865.
Lois D. Cashell,