04-547. Railroad Cost Recovery Procedures-Productivity Adjustment  

  • Start Preamble

    AGENCY:

    Surface Transportation Board.

    ACTION:

    Proposed adoption of a Railroad Cost Recovery Procedures productivity adjustment.

    SUMMARY:

    The Surface Transportation Board proposes to adopt 1.022 (2.2%) as the measure of average change in railroad productivity for the 1998-2002 (5-year) period. The current value of 1.9% was developed for the 1997 to 2001 period.

    DATES:

    Comments are due 15 day after the date of this decision.

    Start Printed Page 1780

    EFFECTIVE DATE:

    The proposed productivity adjustment is effective 30 days after the date of service.

    ADDRESSES:

    Send comments (an original and 10 copies) referring to STB Ex Parte No. 290 (Sub-No. 4) to: Office of the Secretary, Case Control Branch, 1925 K Street, NW., Washington, DC 20423-0001. Parties should submit all pleading and attachments on a 3.5-inch diskette in WordPerfect 6.0 or 6.1 compatible format.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    H. Jeff Warren, (202) 565-1533. Federal Information Relay Service (FIRS) for the hearing impaired: 1-800-877-8339.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Additional information is contained in the Board's decision, which is available on our Web site http://www.stb.dot.gov. To purchase a copy of the full decision, write to, call, or pick up in person from the Board's contractor, ASAP Document Solutions, Suite 405, 1925 K Street, NW., Washington, DC 20006, phone (202) 293-7878. [Assistance for the hearing impaired is available through FIRS: 1-800-877-8339.]

    This action will not significantly affect either the quality of the human environment or energy conservation.

    Pursuant to 5 U.S.C. 605(b), we conclude that our action will not have a significant economic impact on a substantial number of small entities within the meaning of the Regulatory Flexibility Act.

    Start Signature

    Decided: January 6, 2004.

    By the Board, Chairman Nober.

    Vernon A. Williams,

    Secretary.

    End Signature End Supplemental Information

    [FR Doc. 04-547 Filed 1-9-04; 8:45 am]

    BILLING CODE 4915-00-P

Document Information

Published:
01/12/2004
Department:
Surface Transportation Board
Entry Type:
Notice
Action:
Proposed adoption of a Railroad Cost Recovery Procedures productivity adjustment.
Document Number:
04-547
Dates:
Comments are due 15 day after the date of this decision.
Pages:
1779-1780 (2 pages)
Docket Numbers:
STB Ex Parte No. 290 (Sub No. 4)
PDF File:
04-547.pdf