2015-00249. PJM Interconnection, L.L.C. American Transmission Systems, Inc.; Notice of Institution of Section 206 Proceeding and Refund Effective Date
-
Start Preamble
On December 31, 2014, the Commission issued an order in Docket No. ER15-303-000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into the justness and reasonableness of American Transmission Systems, Inc.'s (ATSI) 12.38 percent return on equity in conjunction with ATSI's October 31, 2014 section 205 filing proposing revisions to its with transmission formula rate and Protocols. PJM Interconnection, L.L.C. et al., 149 FERC ¶ 61,292 (2014).
The refund effective date in Docket No. ER15-303-000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register.
Start SignatureDated: January 6, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-00249 Filed 1-9-15; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 01/12/2015
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2015-00249
- Pages:
- 1501-1501 (1 pages)
- Docket Numbers:
- Docket No. ER15-303-000
- PDF File:
- 2015-00249.pdf