95-908. Kenetech Windpower, Wyoming Wind Energy Project; Availability of Draft Environmental Impact Statement  

  • [Federal Register Volume 60, Number 9 (Friday, January 13, 1995)]
    [Notices]
    [Pages 3256-3257]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-908]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF THE INTERIOR
    
    Bureau of Land Management
    [WY-030-94-5101-10-K014; WYW-130382]
    
    
    Kenetech Windpower, Wyoming Wind Energy Project; Availability of 
    Draft Environmental Impact Statement
    
    AGENCIES: Bureau of Land Management, Interior.
    
    ACTION: Notice of Availability of Draft Environmental Impact Statement 
    (DEIS) for the Kenetech Windpower, Wyoming Wind Energy Project, Carbon 
    County, Wyoming.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Under section 102(2)(C) of the National Environmental Policy 
    Act (NEPA) of 1969 as amended, the Bureau of Land Management, Rawlins 
    District Office has prepared a DEIS on the potential impacts of a 
    proposed wind energy project. A total of 1,390 wind turbines and 
    associated facilities (including approximately 29 miles of 230 kV 
    powerline) would be constructed on 62,000 acres (25,091 hectares) of 
    private, Federal and State lands, over a 10-12 year development period, 
    in Carbon County, Wyoming. If the project is approved, the BLM will 
    issue a right-of-way grant under section 501 of the Federal Land Policy 
    and Management Act of 1976 for the wind energy facilities and 
    powerline. The U.S. Bonneville Power Administration (BPA) is a 
    cooperating agency and will base a decision to purchase 25 MW of power, 
    under Public Law 96-501, upon this analysis.
    
    DATES: Comments on the DEIS will be accepted through March 20, 1995. 
    Public Meetings will be held at the Jeffrey Center, Third and Spruce 
    Streets, Rawlins, Wyoming, on February 8, 1995, at 7:00 p.m., and on 
    February 9, 1995, at the Albany County Public Library, Large Meeting 
    Room, 310 S. 8th Street, Laramie, Wyoming, at 7:00 p.m.
    
    ADDRESSES: Comments should be sent to Bureau of Land Management, 
    Rawlins District Office, Walter E. George, Project Leader, 1300 3rd 
    Street, P.O. Box 670, Rawlins, Wyoming 82301 or Bonneville Power 
    Administration, Richard Stone, Environmental Specialist (ECN-3), P.O. 
    Box 3621, Portland, Oregon 97208.
    
    FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, Walter E. 
    George, Project Leader, 1300 3rd Street, P.O. Box 670, Rawlins, Wyoming 
    82301, phone number 307-324-7171 or Bonneville Power Administration, 
    Richard Stone, Environmental Specialist (ECN-3), P.O. Box 3621, 
    Portland, Oregon 97208, phone number 503-230-3797.
    
    SUPPLEMENTARY INFORMATION: Kenetech Windpower proposes to construct a 
    500 (MW) Wind Energy Project to be located on Foote Creek Rim and 
    Simpson Ridge in Carbon County, Wyoming. The project area is located 
    approximately 40 miles (64.36 Km) southeast of Rawlins, and 40 miles 
    (64.36 Km) northwest of Laramie, Wyoming. The Foote Creek Rim portion 
    is in all or portions of approximately 10 sections in Townships l9N and 
    20N, Ranges 78W and 79W north and west of Arlington. The Simpson Ridge 
    portion is in all or portions of 92 sections in Townships 20N, 21N, and 
    22N, Ranges 80W and 81W south of Hanna. Land ownership in the project 
    area is approximately 62 percent private, 28 percent public 
    (administered by BLM), and 10 percent State of Wyoming.
        The project will be constructed in phases over a 10-12 year period. 
    The first phase, involving 70.5 MW of electrical power generated by 201 
    Wind Turbine Generators (WTGs), would be constructed on Foote Creek Rim 
    in 1995-1996. Later phases would involve 50 MW (approximately 75 WTGs/
    50 MW) increases per year, as utility contracts are approved, until the 
    500 MW capacity is reached (for a total of 1,390 WTGs). BLM would issue 
    Notices to Proceed for subsequent phases following a review of site-
    specific proposals (Plans of Development) and monitoring data for 
    consistency with this analysis. Ancillary facilities include, but are 
    not limited to:
    
    1. Above and below-ground electric
    2. Communication lines
    3. Access roads
    4. Substations
    5. Control/maintenance building
    6. Transformer sites
        The Bonneville Power Administration, Department of Energy, a 
    Cooperating Agency for the EIS, will execute a power purchase contract 
    to purchase 25 MW of electricity from the Foote Creek Rim phase of the 
    project under BPA's Resource Supply Expansion Program.
        The wind turbines will be erected on 80 to 120 feet (24 to 37 
    meters) tubular [[Page 3257]] towers with height determined by specific 
    meteorological and geographic characteristics. The WTGs are variable 
    speed, up-wind, three-fiberglass-bladed machines with a rotor diameter 
    of 108 feet (33 meters). The WTGs will be spaced approximately 162 to 
    216 feet (49 to 66 meters) apart with approximately 1,080 to 1,620 feet 
    (329 to 494 meters) between each row.
        The electrical utility interconnection is with the PacifiCorp 230 
    kV system at the Miner's substation at Hanna, Wyoming. A wood pole 230 
    kV line would be erected from the project site northwest, approximately 
    29 miles (40 Km), to the Miner's substation.
        The DEIS analyzes impacts from the proposed action, a 300 MW 
    alternative (Alternative A), and the No Action Alternative. Alternative 
    project locations, reduced project area, construction phasing 
    alternatives, and alternative generating sources were considered but 
    not analyzed in detail.
        The DEIS identifies potentially significant impacts to:
    
    1. Big game crucial habitat and movement patterns
    2. Avian mortality from collisions with turbine blades
    3. Loss of sage grouse habitat
    4. Disturbance of native American religious or culturally significant 
    sites
    5. Modification of basic elements of visual resources in the project 
    area
    
        Dated: January 9, 1995.
    Robert A. Bennett,
    Acting State Director.
    [FR Doc. 95-908 Filed 1-12-95; 8:45 am]
    BILLING CODE 4310-22-P
    
    

Document Information

Published:
01/13/1995
Department:
Land Management Bureau
Entry Type:
Notice
Action:
Notice of Availability of Draft Environmental Impact Statement (DEIS) for the Kenetech Windpower, Wyoming Wind Energy Project, Carbon County, Wyoming.
Document Number:
95-908
Dates:
Comments on the DEIS will be accepted through March 20, 1995. Public Meetings will be held at the Jeffrey Center, Third and Spruce Streets, Rawlins, Wyoming, on February 8, 1995, at 7:00 p.m., and on February 9, 1995, at the Albany County Public Library, Large Meeting Room, 310 S. 8th Street, Laramie, Wyoming, at 7:00 p.m.
Pages:
3256-3257 (2 pages)
Docket Numbers:
WY-030-94-5101-10-K014, WYW-130382
PDF File:
95-908.pdf