-
Start Preamble
Docket Nos. Route 66 Solar Energy Center, LLC EG22-1-000 Cypress Creek Fund 7 Tenant, LLC EG22 EG22-2-000 Cypress Creek Fund 6 Tenant, LLC EG22 EG22-3-000 Cypress Creek Fund 5 Tenant, LLC EG22 EG22-4-000 CCP-PL Lessee, LLC EG22 EG22-5-000 Hecate Energy Highland LLC EG22 EG22-6-000 EnerSmart Chula Vista BESS LLC EG22 EG22-7-000 Sagebrush Line, LLC EG22 EG22-8-000 PGR 2021 Lessee 2, LLC EG22 EG22-9-000 Beulah Solar, LLC EG22 EG22-10-000 Ellis Solar, LLC EG22 EG22-11-000 King Creek Wind Farm 1 LLC EG22 EG22-12-000 King Creek Wind Farm 2 LLC EG22 EG22-13-000 Calhoun Solar Energy LLC EG22 EG22-14-000 ENGIE 2020 ProjectCo-NH1 LLC EG22 EG22-15-000 Dunns Bridge Solar Center, LLC EG22 EG22-16-000 Jackson Generation, LLC EG22 EG22-17-000 MPH AL Pierce, LLC EG22 EG22-18-000 Take notice that during the month of December 2021, the status of the above-captioned entities as Exempt Wholesale Generators became effective by operation of the Commission's regulations. 18 CFR 366.7(a)(2021).
Start SignatureDated: January 7, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-00618 Filed 1-12-22; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 01/13/2022
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2022-00618
- Pages:
- 2148-2148 (1 pages)
- PDF File:
- 2022-00618.pdf