94-1007. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 59, Number 10 (Friday, January 14, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-1007]
    
    
    [[Page Unknown]]
    
    [Federal Register: January 14, 1994]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-4707-5]
    
     
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared December 27, 1993 Through 
    December 31, 1993 pursuant to the Environmental Review Process (ERP), 
    under section 309 of the Clean Air Act and section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 10, 1993 (58 
    FR 18392).
    
    Draft EISs
    
        ERP No. D-FHW-K40201-AZ Rating EC2, Red Mountain Freeway (Loop 202) 
    Transportation Facility, Construction from Salt River between the Price 
    Freeway on the west and AZ-87 on the east, COE section 404 and NPDES 
    Permits, Phoenix Metropolitan Area, Maricopa County, AZ.
        Summary: EPA expressed environmental concerns because the proposed 
    project may encroach into the Salt River floodplain and floodway. EPA 
    also requested additional information in the FEIS regarding compliance 
    with the conformity requirements of the Clean Air Act and potential 
    impacts to waters of the United States.
        ERP No. D-NIH-D81023-MD Rating EC2, National Institutes of Health 
    Bethesda Main Campus Comprehensive Master Plan, Implementation, 
    Montgomery County, MD.
        Summary: EPA had environmental concerns with the potential 
    deterioration of air quality as a result of traffic increases around 
    the site, with the failure to consider alternatives to demolition of 
    the 2.3 million square foot Clinical Center, and with overlooked 
    opportunities to incorporate energy and water conservation measures in 
    the project Master Plan and corresponding Transportation and Energy 
    Management Plans.
        ERP No. D-NPS-K61127-CA Rating EC2, Presido of San Francisco 
    General Management Plan, Golden Gate National Recreation Areas, 
    Implementation, San Francisco, CA.
        Summary: EPA expressed environmental concerns and requested that 
    the FEIS address these concerns: how future park uses may be affected 
    by multiple types of contamination at the Presidio; the most current 
    information on hazardous substances contamination at the Presidio; 
    identification of the responsible party for ensuring compliance with 
    federal and state requirements on asbestos and polychlorinated 
    biphenyls; and the project's consistency with federal requirements 
    regarding the placement of dredged or fill material in wetlands and 
    waters of the United States.
    
    Final EISs
    
        ERP No. F-FRC-K05051-CA, Lower Mokelumne River Hydroelectric 
    Project Modifications, Licensing, (FERC. No. 29116-004), Parts of 
    Pardee and Camanhe Dams, Mokelumne River, CA.
        Summary: Review of the Final EIS was not deemed necessary. No 
    comment letter was sent to the preparing agency.
    
    Regulations 
        ERP No. R-NOA-A91059-00, 50 CFR Parts 215, 216, and 222 Protected 
    Species Special Exception Permits, To Import Marine Mammals for 
    Scientific Research, Proposed Rule (58 FR 53320).
        Summary: Review of the final EIS/Regulation has been completed and 
    the project found to be satisfactory. No comment letter was sent to the 
    preparing agency.
        ERP No. R-SCS-A90082-00, Emergency Wetlands Reserve Program, 
    Restoration and Maintenance, Interm Rule, 7 CFR part 623.
        Summary: EPA was very encouraged by the positive environmental 
    impacts, such as restoring cropland to floodplain wetlands, stated in 
    this interim rule. However, EPA provided a number of suggestions that 
    may allow the rule to more adequately respond to questions regarding 
    land eligibility, owner obligations and payment provisions.
    
        Dated: January 10, 1994.
    
    Richard E. Sanderson, 
    Director, Office of Federal Activities.
    [FR Doc. 94-1007 Filed 11-13-94; 8:45am] 
    BILLING CODE 6560-50-P 
    
    
    

Document Information

Published:
01/14/1994
Department:
Environmental Protection Agency
Entry Type:
Uncategorized Document
Document Number:
94-1007
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: January 14, 1994, ER-FRL-4707-5