98-833. Stingray Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 9 (Wednesday, January 14, 1998)]
[Notices]
[Page 2227]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-833]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-169-000]
Stingray Pipeline Company; Notice of Request Under Blanket
Authorization
January 8, 1998.
Take notice that on December 31, 1997, Stingray Pipeline Company
(Stingray), 701 East 22nd Street, Lombard, Illinois 60148, filed in
Docket No. CP98-169-000 a request pursuant to Secs. 157.205 and
157.208(b) of the Commission's Regulations under the Natural Gas Act
(18 CFR 157.205 and 157.208(b) for authorization to construct, own and
operate facilities to connect Stingray's existing East Cameron Block
338 (EC 338), Offshore Louisiana platform to a new production platform
to be located in East Cameron Block 373 (EC 373), Offshore Louisiana
under Stingray's blanket certificate issued in Docket No. CP91-1505-000
pursuant to Section 7 of the Natural Gas Act, all as more fully set
forth in the request that is on file with the Commission and open to
public inspection.
Specifically, Stingray proposes to construct, own and operate a
dual 8-inch meter and approximately 0.10 miles of 16-inch lateral on a
new platform to be located in EC 373; approximately 12.91 miles of 16-
inch lateral from the new EC 373 platform to the existing EC 338
platform; and approximately 0.05 miles of 16-inch lateral to connect
the 12.91-mile lateral to the existing EC 338 platform. Stingray
estimates the cost of the proposed facilities to be $11,358,000.
Stingray states that it will provide self-implementing
transportation service by means of the proposed facilities pursuant to
its Order No. 509 blanket certificate and Subparts G and K of Part 284
of the Commission's Regulations. Stingray asserts that the proposed
facilities will allow Stingray to receive approximately 24,982,000 Mcf
of additional production on annual basis for transportation onshore.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-833 Filed 1-13-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 01/14/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-833
- Pages:
- 2227-2227 (1 pages)
- Docket Numbers:
- Docket No. CP98-169-000
- PDF File:
-
98-833.pdf