00-927. Notice of Intent to File an Application for a New License  

  • [Federal Register Volume 65, Number 10 (Friday, January 14, 2000)]
    [Notices]
    [Pages 2387-2388]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 00-927]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Intent to File an Application for a New License
    
    January 7, 2000.
        a. Type of Filing: Notice of Intent to File An Application for a 
    New License.
        b. Project No.: 2177.
        c. Date Filed: December 21, 1999.
        d. Submitted By: Georgia Power Company--current licensee.
        e. Name of Project: Middle Chattahoochee Hydroelectric Project.
        f. Location: On the Chattahoochee River, near the cities of 
    Columbus, Phenix City and Smith's, in Harris and Muscogee Counties, 
    Georgia, and Chambers, Lee, and Russell Counties, Alabama.
        g. Filed Pursuant to: Section 15 of the Federal Power Act.
        h. Licensee Contact: George Martin, Georgia Power Company, 241 
    Ralph McGill Boulevard NE, Atlanta, GA 30308 (404) 506-1357.
        i. FERC Contact: Tom Dean, thomas.dean@ferc.fed.us, (202) 219-2778, 
    or Ron McKitrick, ronald.mckitrick@ferc.fed.us, (770) 452-3778 
    regarding the alternative licensing procedures.
        j. Effective date of current license: January 1, 1955.
        k. Expiration date of current license: December 31, 2004.
        l. Description of the Project: The project consists of the 
    following three developments:
        The Goat Rock Development consists of the following existing 
    facilities: (1) A
    
    [[Page 2388]]
    
    75-foot-high concrete dam comprised of an overflow spillway section 
    surmounted with 4-foot-high flashboards; (2) the 6-mile-long, 1,050-
    acre Goat Rock reservoir at a normal pool elevation of 404 feet msl; 
    (3) a powerhouse, integral with the dam, containing six generating 
    units with a total installed capacity of 26,000 kW, and (4) other 
    appurtenances.
        The Oliver Development consists of the following existing 
    facilities: (1) A 70-foot-high concrete dam comprised of a gated 
    spillway section; (2) the 8.5-mile-long, 2,150-acre Lake Oliver 
    reservoir at a normal pool elevation of 337 feet msl; (3) a powerhouse, 
    integral with the dam, containing four generating units with a total 
    installed capacity of 60,000 kW, and (4) other appurtenances.
        The North Highlands Development consists of the following existing 
    facilities: (1) a 40-foot-high concrete masonry dam comprised of an 
    overflow spillway section surmounted with 3.5-foot-high flashboards; 
    (2) the 131-acre North Highlands reservoir at a normal pool elevation 
    of 269 feet msl; (3) a powerhouse, integral with the dam, containing 
    four generating units with a total installed capacity of 29,600 kW, and 
    (4) other appurtenances.
        m. Each application for a new license and any competing license 
    applications must be filed with the Commission at least 24 months prior 
    to the expiration of the existing license. All applications for license 
    for this project must be filed by December 31, 2002.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 00-927 Filed 1-13-00; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
01/14/2000
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
00-927
Pages:
2387-2388 (2 pages)
PDF File:
00-927.pdf