99-1017. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 64, Number 10 (Friday, January 15, 1999)]
    [Notices]
    [Pages 2639-2640]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-1017]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-5498-8]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared December 28, 1998 through 
    January 01, 1999 pursuant to the Environmental Review
        Process (ERP), under Section 309 of the Clean Air Act and Section 
    102(2)(c) of the National Environmental Policy Act as amended. Requests 
    for copies of EPA comments can be directed to the Office of Federal 
    Activities at (202) 564-7167.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 10, 1998 (62 
    FR 17856).
    
    Draft EISs
    
        ERP No. D-AFS-L65311-ID Rating EC2, North Fork St. Joe River 
    Project, Implementation, Idaho Panhandles National Forest, St. Joe 
    Ranger District, Shoshone County, ID.
        Summary: EPA expressed environmental concerns. EPA requested
    
    [[Page 2640]]
    
    more information to ensure that antidegradation requirements for water 
    quality will be met, to discuss project impact to health ecosystem, and 
    to further address cumulative impacts of this and other projects in the 
    area.
        ERP No. D-COE-L03008-AK Rating EO2, Beaufort Sea Oil and Gas 
    Development Northstar Project, Implementation, NPDES Permit, Sea 
    Island, Alaskan Beaufort Sea, Offshore Marine Environment and Onshore 
    Northslope of Alaskan Coastal Plain, AK.
        Summary: EPA expressed environmental objections to the proposed 
    Northstar project which were related to the risks of leaks and spills 
    associated with the use of undersea pipelines in the Beaufort Sea, the 
    technological/logistical difficulties in responding to oil spills, and 
    the extent to which issues and concerns of the Inupiats Eskimoes have 
    been addressed in the development of the project and the EIS. EPA 
    believes that further evaluation of double-walled undersea pipeline 
    option and the Northstar Oil Discharges Prevention and Contingency Plan 
    is necessary, and that further development of the project and EIS 
    should be conducted in consultation with the Inupiats to ensure that 
    their issues are addressed in a manner consistent with Executive Orders 
    12898 and 13084.
        ERP No. D-FHW-G40151-TX Rating LO, US-190 Corridor from FM2657 to 
    the East City Limits of Copperas Cove, Transportation Improvements, 
    Major Investment Study, Coryell and Lampasas Counties, TX.
        Summary: EPA had no objection to the selection of the preferred 
    alternative, Alternative G, as described in the draft EIS.
        ERP No. DA-COE-K32023-HI Rating EO2, Ma'aLaea Harbor Improvements 
    for Light-Draft-Vessels, Entrance Channel Realignment and Breakwater 
    Modification, Additional Information, Island of Maui, Maui County, HI.
        Summary: EPA expressed environmental objections related to water 
    quality and Clean Water Act Section 404 issues. The SDEIS showed 
    exceedances in water quality standards for turbidity during 
    construction and project operation due to increased turbulence caused 
    by additional vessel traffic from the 130 new berths. EPA believes that 
    the Corps should ensure that there are mechanisms in place to maintain 
    EPA-approved Water Quality Standards. EPA asked that the Corps' final 
    report to Congress on fiscal authorization not proceed until there are 
    satisfactory assurances from the State that onshore sewage improvements 
    would be put into place.
    
    Final EISs
    
        ERP No. F-AFS-K65272-CA, Chico Genetic Resource Center for Pest 
    Management Program, Implementation, Mendocino National Forest, Willow, 
    Butte County, CA.
        Summary: Review of the Final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
        ERP No. F-AFS-L65160-ID, North Round Valley Timber Sales and Road 
    Construction, Implementation, Payette National Forest, New Meadows 
    Ranger District, Adams County, ID.
        Summary: Review of the Final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
        ERP No. F-FHW-E40761-NC, US 64 Bypass Transportation Improvements 
    Project, from I-440 to US 64 west of Wendell and Eastern Wake 
    Expressway from existing US 64 to NC-1007 (Poole Road), Funding and COE 
    Section 404 Permit, Wake County, NC.
        Summary: EPA found the document generally addressed the agency's 
    comments on the draft EIS. However, lack of coordinated multi-modal 
    transportation planning was noted.
    
        Dated: January 12, 1999.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 99-1017 Filed 1-14-99; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
01/15/1999
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
99-1017
Pages:
2639-2640 (2 pages)
Docket Numbers:
ER-FRL-5498-8
PDF File:
99-1017.pdf