2015-00461. National Emission Standards for Hazardous Air Pollutants: Primary Aluminum Reduction Plants; Extension of Comment Period
-
Start Preamble
AGENCY:
Environmental Protection Agency.
ACTION:
Supplemental notice of proposed rulemaking; extension of public comment period.
SUMMARY:
The Environmental Protection Agency (EPA) is announcing that the period for providing public comments on the December 8, 2014, supplemental proposed rule titled “National Emission Standards for Hazardous Air Pollutants: Primary Aluminum Reduction Plants” is being extended for 15 days.
DATES:
Comments. The public comment period for the supplemental proposed rule published in the Federal Register on December 8, 2014 (79 FR 72914), is being extended for 15 days to February 6, 2015, in order to provide the public additional time to submit comments and supporting information.
ADDRESSES:
Comments. Written comments on the supplemental proposed rule may be submitted to the EPA electronically, by mail, by facsimile or through hand delivery/courier. Please refer to the supplemental proposal (79 FR 72914) for the addresses and detailed instructions.
Docket. Publicly available documents relevant to this action are available for public inspection either electronically at http://www.regulations.gov or in hard copy at the EPA Docket Center, Room 3334, 1301 Constitution Avenue NW., Washington, DC. The Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. A reasonable fee may be charged for copying. The official public docket for this rulemaking is Docket ID No. EPA-HQ-OAR-2011-0797.
World Wide Web. The EPA Web site for this rulemaking is at http://www.epa.gov/ttn/atw/alum/alumpg.html.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Mr. David Putney, Metals and Inorganic Chemicals Group (D243-02), Sector Policies and Programs Division, Office of Air Quality Planning and Standards, U.S. Environmental Protection Agency, Research Triangle Park, North Carolina 27711; Telephone number: (919) 541-2016; Fax number (919) 541-3207; Email address: putney.david@epa.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Comment Period
After considering a request received to extend the public comment period, the EPA has decided to extend the public comment period for an additional 15 days. Therefore, the public comment period will end on February 6, 2015, rather than January 22, 2015. This extension will help ensure that the public has sufficient time to review the proposed rule, the supporting technical documents and data available in the docket.
Start SignatureDated: January 6, 2015.
Stephen D. Page,
Director, Office of Air Quality Planning and Standards.
[FR Doc. 2015-00461 Filed 1-14-15; 8:45 am]
BILLING CODE 6560-50-P
Document Information
- Published:
- 01/15/2015
- Department:
- Environmental Protection Agency
- Entry Type:
- Proposed Rule
- Action:
- Supplemental notice of proposed rulemaking; extension of public comment period.
- Document Number:
- 2015-00461
- Dates:
- Comments. The public comment period for the supplemental proposed rule published in the Federal Register on December 8, 2014 (79 FR 72914), is being extended for 15 days to February 6, 2015, in order to provide the public additional time to submit comments and supporting information.
- Pages:
- 2067-2067 (1 pages)
- Docket Numbers:
- EPA-HQ-OAR-2011-0797, FRL-9921-63-OAR
- RINs:
- 2060-AQ92: National Emission Standards for Hazardous Air Pollutants: Primary Aluminum Reduction Plants
- RIN Links:
- https://www.federalregister.gov/regulations/2060-AQ92/national-emission-standards-for-hazardous-air-pollutants-primary-aluminum-reduction-plants
- PDF File:
- 2015-00461.pdf
- Supporting Documents:
- » Redline Version of Subpart LL showing the Differences from the Current Subpart LL and the 2015 Amended Rule
- » Summary Of Public Comments And Responses
- » Flathead Beacon News Paper Article
- » Residual Risk Assessment for the Primary Aluminum Production Source Category in Support of the September 2015 Risk and Technology Review Final Rule
- » Final MACT Floor Analysis for the Primary Aluminum Production Source Category
- » Final Cost Impacts for the Primary Aluminum Production Source Category
- » Final Technology Review for the Primary Aluminum Production Source Category
- » Approach for Applying the Upper Prediction Limit to Limited Datasets for the Final Rule for Primary Aluminum Production Source Category
- » Final Economic Impact Analysis for the Primary Aluminum Production Source Category
- » Final Rationale for Selection of Compliance Dates for the Primary Aluminum Production Source Category
- CFR: (1)
- 40 CFR 63