97-1045. ANR Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 11 (Thursday, January 16, 1997)]
    [Notices]
    [Pages 2361-2362]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-1045]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. CP-97-163-000]
    
    
    ANR Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    January 10, 1997.
        Take notice that on December 19, 1996, ANR Pipeline Company (ANR), 
    500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No. 
    CP97-163-000 a request pursuant to Sections 157.205 and 157.211 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 
    157.211) for authorization to construct and operate an interconnection 
    between ANR and Central Louisiana Electric Company (CLECO), in St. 
    Mary's Parish, Louisiana. ANR makes such request under its blanket 
    certificate issued in Docket No. CP82-480-000 pursuant to Section 7 of 
    the Natural Gas Act, all as more fully set forth in the request on file 
    with the Commission and open to public inspection.
        ANR states that the proposed interconnection will consist of a gas 
    chromatograph, associated electronic measurement facilities, and a 10-
    inch tap on ANR's existing 30-inch pipeline.
    
    [[Page 2362]]
    
    It is indicated that the maximum capacity of the proposed 
    interconnection will be 125 MMcf per day. ANR avers that it will 
    provide deliveries to CLECO at the proposed interconnection under its 
    Rate Schedule ITS. It is stated that the volumes to be delivered to 
    CLECO will be within the certificated entitlements of CLECO, and the 
    volumes will not impact ANR's gas supply situation. ANR further states 
    that deliveries of natural gas at the proposed interconnection can be 
    made without detriment or disadvantage to any existing customer.
        ANR estimates the total cost of the facilities will be 
    approximately $156,000 and that CLECO will partially reimbursed ANR for 
    those cost.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Sec. 157.205 of the 
    Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the 
    request. If no protest is filed within the time allowed therefor, the 
    proposed activity shall be deemed to be authorized effective the day 
    after the time allowed for filing a protest. If a protest is filed and 
    not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 97-1045 Filed 1-15-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
01/16/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-1045
Pages:
2361-2362 (2 pages)
Docket Numbers:
Docket No. CP-97-163-000
PDF File:
97-1045.pdf