Take notice that on December 19, 1996, ANR Pipeline Company (ANR),
500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No.
CP97-163-000 a request pursuant to Sections 157.205 and 157.211 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and
157.211) for authorization to construct and operate an interconnection
between ANR and Central Louisiana Electric Company (CLECO), in St.
Mary's Parish, Louisiana. ANR makes such request under its blanket
certificate issued in Docket No. CP82-480-000 pursuant to Section 7 of
the Natural Gas Act, all as more fully set forth in the request on file
with the Commission and open to public inspection.
ANR states that the proposed interconnection will consist of a gas
chromatograph, associated electronic measurement facilities, and a 10-
inch tap on ANR's existing 30-inch pipeline.
[[Page 2362]]
It is indicated that the maximum capacity of the proposed
interconnection will be 125 MMcf per day. ANR avers that it will
provide deliveries to CLECO at the proposed interconnection under its
Rate Schedule ITS. It is stated that the volumes to be delivered to
CLECO will be within the certificated entitlements of CLECO, and the
volumes will not impact ANR's gas supply situation. ANR further states
that deliveries of natural gas at the proposed interconnection can be
made without detriment or disadvantage to any existing customer.
ANR estimates the total cost of the facilities will be
approximately $156,000 and that CLECO will partially reimbursed ANR for
those cost.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 97-1045 Filed 1-15-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 01/16/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-1045
- Pages:
- 2361-2362 (2 pages)
- Docket Numbers:
- Docket No. CP-97-163-000
- PDF File:
-
97-1045.pdf