2012-698. Free Flow Power Corporation and Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing  

  • Start Preamble

    The Commission has received two preliminary permit applications deemed filed on February 1, 2011, at 8:30 a.m.,[1] for proposed projects to be located on the Mississippi River, in West Baton Rouge and East Baton Rouge Parishes, Louisiana. The applications were filed by Free Flow Power Corporation for Project No. 12817-002, and Northland Power Mississippi River LLC for Project No. 14083-000.

    On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.[2] The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application.

    The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing.

    Start Signature

    Dated: January 10, 2012.

    Nathaniel J. Davis, Sr.,

    Deputy Secretary.

    End Signature End Preamble

    Footnotes

    1.  Under the Commission's Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011).

    Back to Citation

    [FR Doc. 2012-698 Filed 1-13-12; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
01/17/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2012-698
Pages:
2288-2288 (1 pages)
Docket Numbers:
Project Nos. 12817-002 and 14083-000
PDF File:
2012-698.pdf