2013-00900. Turlock Irrigation District and Modesto Irrigation District; Notice Clarifying Party Status  

  • Start Preamble

    On January 9, 2013, the Modesto Irrigation District (Modesto) filed a motion for clarification of party status or, in the alternative, for intervention in the above-captioned jurisdictional proceeding with respect to the La Grange Project. In its December 19, 2012 Order Finding Licensing of Hydroelectric Project Required, 141 FERC ¶ 62,211 (2012), Commission staff imposed filing requirements on Modesto and included Modesto in the caption of the Order. In addition, Modesto is part owner of the La Grange Dam. Therefore, the Commission clarifies that Modesto is a party to the jurisdictional proceeding.

    Start Signature

    Dated: January 11, 2013.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2013-00900 Filed 1-16-13; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
01/17/2013
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2013-00900
Pages:
3892-3892 (1 pages)
Docket Numbers:
Docket No. UL11-1-000, Project No. 2299-078
PDF File:
2013-00900.pdf