2025-00974. Law Enforcement Response in Power Reactor Physical Protection Programs  

  • Document ADAMS accession No./weblink/ Federal Register citation
    Design Basis Threat, Final Rule, March 19, 2007 72 FR 12705.
    Power Reactor Security Requirements, Final Rule, March 27, 2009 74 FR 13926.
    ( print page 5746)
    SRM-SECY-17-0100, “Staff Requirements—SECY-17-0100—Security Baseline Inspection Program Assessment Results and Recommendations for Program Efficiencies,” October 9, 2018 ML18283A072.
    SECY-20-0070, “Technical Evaluation of the Security Bounding Time Concept for Operating Nuclear Power Plants” (Redacted), November 8, 2021 ML20126G265.
    SRM-SECY-20-0070, “Staff Requirements—SECY-20-0070—Technical Evaluation of the Security Bounding Time Concept for Operating Nuclear Power Plants,” June 6, 2024 ML24158A083.
    Energy Policy Act of 2005 (Pub. L. 109-58) https://www.govinfo.gov/​app/​details/​PLAW-109publ58.

Document Information

Published:
01/17/2025
Department:
Nuclear Regulatory Commission
Entry Type:
Proposed Rule
Action:
Proposed interpretive rule; request for comment.
Document Number:
2025-00974
Dates:
Submit comments on the proposed interpretation by March 3, 2025. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received before this date.
Pages:
5743-5746 (4 pages)
Docket Numbers:
NRC-2024-0167
PDF File:
2025-00974.pdf
CFR: (1)
10 CFR 73