2025-01082. Energy Conservation Program: Commercial Warm Air Furnaces; Final Determination  

  • Table I.1—List of Commenters With Written Submissions in Response to the December 2024 NOTD

    Commenter(s) Abbreviation Comment No. in the docket Commenter type
    Michael Ravnitzky Ravnitzky 2 Individual.
    Air-Conditioning, Heating, and Refrigeration Institute AHRI 6 Trade Association.
    Appliance Standards Awareness Project and Northwest Energy Efficiency Alliance (Joint Commenters) ASAP and NEEA 7 Efficiency Organization.
    Trane Technologies Trane 8 Manufacturer.
    Johnson Controls JCI 9 Manufacturer.
    Daikin Applied Americas Inc Daikin 10 Manufacturer.

Document Information

Effective Date:
7/3/2023
Published:
01/17/2025
Department:
Energy Department
Entry Type:
Rule
Action:
Final determination.
Document Number:
2025-01082
Dates:
The effective date of July 3, 2023, for the TE2 test procedure is confirmed.
Pages:
5560-5566 (7 pages)
Docket Numbers:
EERE-2024-BT-DET-0012
RINs:
1904-AE57: Test Procedures for Commercial Warm Air Furnaces
RIN Links:
https://www.federalregister.gov/regulations/1904-AE57/test-procedures-for-commercial-warm-air-furnaces
PDF File:
2025-01082.pdf
Supporting Documents:
» 2025-01-08 DOE response to Daikin Applied Americas Inc. request for a comment period extension (xref EERE-2024-BT-DET-0012-0004)
CFR: (1)
10 CFR 431