-
Start Preamble
The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING:
Federal Energy Regulatory Commission.
DATE AND TIME:
January 19, 2017 10:00 a.m.
PLACE:
Room 2C, 888 First Street NE., Washington, DC 20426.
STATUS:
Open.
MATTERS TO BE CONSIDERED:
Agenda
* Note—Items listed on the agenda may be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at http://ferc.capitolconnection.org/ sing the eLibrary link, or may be examined in the Commission's Public Reference Room.
Start Signature1034th—Meeting; Regular Meeting
[January 19, 2017, 10 a.m.]
Item No. Docket No. Company ADMINISTRATIVE A-1 AD16-7-000 Customer Matters, Reliability, Security and Market Operations. A-2 AD16-1-000 Agency Administrative Matters. Start Printed Page 5554 ELECTRIC E-1 RM17-2-000 Uplift Cost Allocation and Transparency in Markets Operated by Regional Transmission Organizations and Independent System Operators. E-2 E-3 PL17-2-000 OMITTED Utilization of Electric Storage Resources for Multiple Services When Receiving Cost-Based Rate Recovery. E-4 OMITTED E-5 OMITTED E-6 OMITTED E-7 ER09-1256-002, ER12-2708-003 Potomac-Appalachian Transmission Highline, LLC PJM Interconnection, L.L.C. E-8 ER13-2483-001 Old Dominion Electric Cooperative. E-9 ER16-1483-002, ER16-1483-0004 California Independent System Operator Corporation. E-10 EL14-37-000 PJM Interconnection, L.L.C. E-11 ER13-1654-001, ER13-1654-002 PJM Interconnection, L.L.C. E-12 RM16-7-000 Disturbance Control Standard—Contingency Reserve for Recovery from a Balancing Contingency Event Reliability Standard. E-13 RM16-20-000 Remedial Action Schemes Reliability Standard. E-14 RM15-11-001 Reliability Standard for Transmission System Planned Performance for Geomagnetic Disturbance Events. E-15 ER16-1807-000, ER10-1459-008 FirstEnergy Solutions Corp. ER10-1469-004 The Cleveland Electric Illuminating Company. ER10-1467-004 Ohio Edison Company. ER10-1468-004 The Toledo Edison Company. ER13-785-003 FirstEnergy Generation, LLC. ER13-713-003 FirstEnergy Nuclear Generation, LLC. ER10-1453-004 FirstEnergy Generation Mansfield Unit 1 Corp. E-16 ER16-835-000 New York Independent System Operator, Inc. E-17 EL16-117-001 Vote Solar Initiative and Montana Environmental Information Center v. Montana Public Service Commission. E-18 ER16-1904-001 ISO New England Inc. E-19 EL13-88-001 Northern Indiana Public Service Company v. Midcontinent Independent System Operator, Inc. and PJM Interconnection, L.L.C. ER16-1967-000 PJM Interconnection, L.L.C. ER16-1969-000 Midcontinent Independent System Operator, Inc. ER16-1969-001 (Not Consolidated) E-20 EL16-120-000 New England Power Generators Association, Inc. v. ISO New England Inc. E-21 ER17-408-000 California Independent System Operator Corporation. E-22 ER17-411-000 California Independent System Operator Corporation. GAS G-1 RP17-303-000 Natural Gas Pipeline Company of America LLC. G-2 RP17-302-000 Wyoming Interstate Company, L.L.C. HYDRO H-1 P-1971-079 Idaho Power Company. H-2 P-1864-164 Upper Peninsula Power Company. H-3 P-2114-277 Public Utility District No. 2 of Grant County, Washington. H-4 P-4254-011 Brentwood Dam Ventures, LLC. CERTIFICATES C-1 OMITTED C-2 OMITTED C-3 CP15-514-000 CP15-539-000 Columbia Gas Transmission, LLC. Columbia Gulf Transmission, LLC. Start Printed Page 5555End SignatureIssued: January 12, 2017.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through http://ferc.capitolconnection.org/. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov' s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit http://ferc.capitolconnection.org/ or contact Danelle Springer or David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.
End Preamble[FR Doc. 2017-01138 Filed 1-13-17; 11:15 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 01/18/2017
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2017-01138
- Pages:
- 5553-5555 (3 pages)
- PDF File:
- 2017-01138.pdf