Start Preamble
AGENCY:
Western Area Power Administration, DOE.
ACTION:
Notice of public meetings and additional opportunity for public review and comment.
SUMMARY:
The U.S. Department of Energy (DOE), Western Area Power Administration (Western) issued a notice of intent (NOI) to prepare an Environmental Impact Statement (EIS) on August 2, 2006, for the Eastern Plains Transmission Project (EPTP or Transmission Project). This notice announces additional public meetings to provide the public opportunity to review and comment on additional transmission line routes and revised routes; the scope of the EIS; and review comments previously received during the scoping meetings held in August and September 2006.
Western is proposing to participate with Tri-State Generation and Transmission Association, Incorporated (Tri-State) in the construction of the EPTP. Western's participation would be in exchange for 275 megawatts (MW) of capacity rights on the proposed transmission lines. The EIS will address Start Printed Page 2508the construction, operation, and maintenance of approximately 1,000 miles of high-voltage transmission lines and ancillary facilities, which include substations, fiber optic installation, access roads, and construction staging areas. The EIS will discuss alternatives such as Western's system alternatives and the no action alternative (no Federal action). The EIS will analyze and present environmental impacts compared to the existing baseline condition in which no Transmission Project facilities exist. The EIS also will include analyses of the environmental impacts of Tri-State's proposed generation projects, and other past, present, and reasonably foreseeable projects in the EPTP area. The EIS will be prepared in accordance with the National Environmental Policy Act (NEPA) and DOE NEPA Implementing Procedures.
DATES:
See SUPPLEMENTARY INFORMATION section for meeting dates and locations. The comment period will close March 9, 2007.
ADDRESSES:
Written comments, questions, and information on the scope of the EIS may be mailed, faxed, or e-mailed to Mr. Jim Hartman, Environmental Manager, Western Area Power Administration, Rocky Mountain Region, P.O. Box 3700, Loveland, CO 80539; fax (970) 461-7213; or e-mail eptp@wapa.gov. For persons wishing to leave voice messages, the toll-free number is (888) 826-4710.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
For further information or to request copies of the EIS, contact Mr. Hartman at the addresses provided or telephone the Transmission Project hotline toll-free at (888) 826-4710. For general information on DOE's NEPA review procedures or the status of a NEPA review, contact Ms. Carol M. Borgstrom, Director, Office of NEPA Policy and Compliance (GC-20), U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585-0119; telephone (202) 586-4600 or (800) 472-2756; or fax (202) 586-7031.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Background and Need for Agency Action
Western, a power marketing administration within DOE, markets Federal hydroelectric power to preference customers, as specified by law. They include municipalities, cooperatives, public utility and irrigation districts, Federal and State agencies, and Native American Tribes in 15 western States, including Colorado and Kansas. Western's proposal is to participate with Tri-State in the construction of the Transmission Project in exchange for approximately 275 MW of capacity rights on the proposed transmission lines. Tri-State is a wholesale electric power supplier, owned by the 44 electric cooperatives it serves. Tri-State and the member utilities serve customers throughout Colorado, Nebraska, New Mexico, and Wyoming. Tri-State's Board of Directors approved a Resource Development Plan that includes the Transmission Project.
Western needs to provide more economical, reliable, diverse, and flexible power delivery to its customers by expanding the capability and geographic reach of Western's existing transmission system. The Transmission Project would provide Western's customers with more economical service by allowing customers to purchase transmission service directly from Western rather than through other companies' transmission lines. Also, during low water times, the Transmission Project would provide Western increased access to other options for satisfying Western's Federal hydropower contractual allocations. In addition, the Transmission Project would provide a direct interconnection at the Midway Substation which would facilitate power transfer between two of Western's Federal projects, the Colorado River Storage Project and the Loveland Area Projects. Enhancing and expanding transmission pathways also would contribute to ensuring reliability of the Federal transmission system.
Proposed Action and Alternatives
Western is preparing the EIS on its proposal to participate with Tri-State in the construction of the Transmission Project. Western's proposed activities include construction planning and management for approximately 1,000 miles of high-voltage transmission lines, and acquiring rights-of-way for transmission lines, access roads, and communication facilities. In addition to the transmission lines, access roads, and construction staging areas, the EIS will address environmental effects of four new substations; expansions of approximately eight existing substations; and installing a fiber optic communications system for control of the transmission lines.
Western issued a notice of intent (NOI) to prepare an EIS for the Transmission Project, on August 2, 2006, (71 FR 43733) which included dates, times, and locations of public scoping meetings, and opportunities available for the public to comment. Since the NOI was published, 10 public scoping meetings were conducted between August 28 and September 14, 2006, throughout eastern Colorado and western Kansas. This notice announces additional public meetings in February 2007 to provide the public opportunity to review and comment on additional transmission line routes and revised routes; the scope of the EIS; and review comments previously received during the scoping meetings held in August and September 2006.
Alternative Transmission Line Routes
During the August and September 2006 scoping meetings, Western presented preliminary locations of transmission line corridors and new substations. As a result of comments received, Western gathered additional data, made several route refinements, added additional routes, and considered alternatives, all of which will be made available to the public at the February 2007, meetings. At the February meetings, Western seeks comments on the alternative routes. In the draft EIS, Western will consider those additional comments in its analysis of the alternative routes.
Western will address other alternatives in the EIS, including the no action alternative. Under the no action alternative, Western would not participate with Tri-State in the construction of the Transmission Project. The EIS will also evaluate the environmental effects of all the alternatives and compare them to the existing baseline condition, in which no Transmission Project facilities are present. Alternative transmission line routes and substation locations will be refined as part of the EIS public process and addressed in the EIS. Western will consider additional reasonable alternatives that are technically and economically viable and that would meet Western's purpose and need.
Impacts Associated With Tri-State's Generation Projects
Tri-State, in its Resource Development Plan, proposes to develop a two-unit expansion of a coal-based power plant in Holcomb, Kansas, and is planning an additional generation project in southeastern Colorado (referred to as Tri-State's Colorado Power Project). Western is not a participant in, is not involved in, and does not have control over Tri-State's generation projects. The EIS will evaluate the environmental impacts of Tri-State's generation projects as well as other past, present, and reasonably foreseeable projects. Start Printed Page 2509
Summary of Comments Received During First Round Scoping
Western prepared a summary of the comments received during the first round of scoping meetings and will make the summary available at http://www.wapa.gov/transmission/eptp.htm prior to the public meetings in February 2007. Copies also are available upon request.
Meetings
The dates and meeting locations are:
1. February 12, 2007, Carroll Building, 418 Edison Street, Brush, CO 80723.
2. February 13, 2007, Limon Community Building, South Room, 477 D Avenue, Limon, CO 80828.
3. February 14, 2007, Burlington Education and Community Center, 420 S. 14th Street, Old Town, Burlington, CO 80807.
4. February 15, 2007, City Hall, Community Room, 245 W. 4th Street, Wray, CO 80758.
5. February 16, 2007, Byers High School, Meeting Rooms 537/538, 444 E. Front Street, Byers, CO 80103.
6. February 19, 2007, Veteran's Memorial Building, 207 North Main Street, Lakin, KS 67860.
7. February 20, 2007, Community Activity Building (CAB Building), Wallace County Fairgrounds, Sharon Springs, KS 67758.
8. February 21, 2007, Lamar Community Building, Multi-Purpose Room, 610 South 6th Street, Lamar, CO 81052.
9. February 22, 2007, Hanover Junior/Senior High School, 17050 South Peyton Highway, Colorado Springs (Hanover), CO 80928.
10. February 23, 2007, McHarg Park Community Center, 405 Second Street, Avondale, CO 81022.
Each meeting will be held between 3 and 7 p.m., except for the meeting on February 22 at the Hanover School, which will be held between 4 and 8 p.m.
Participation in the NEPA Process
Persons interested in receiving future notices, Transmission Project information, copies of the EIS, and other information on the NEPA review process should contact Mr. Hartman as described under ADDRESSES. The EIS (choice of summary or full document) will be available in printed and electronic (compact disc) formats.
Western anticipates the draft EIS will be available summer 2007, with a final EIS available spring 2008. A Record of Decision is expected to be issued spring 2008. The public will be provided an opportunity to comment on the draft EIS. The location of public hearings on the draft EIS will be provided in the Federal Register and to local media at a later date.
Start SignatureDated: January 11, 2007.
Timothy J. Meeks,
Administrator.
[FR Doc. E7-703 Filed 1-18-07; 8:45 am]
BILLING CODE 6450-01-P
Document Information
- Published:
- 01/19/2007
- Department:
- Western Area Power Administration
- Entry Type:
- Notice
- Action:
- Notice of public meetings and additional opportunity for public review and comment.
- Document Number:
- E7-703
- Dates:
- See SUPPLEMENTARY INFORMATION section for meeting dates and locations. The comment period will close March 9, 2007.
- Pages:
- 2507-2509 (3 pages)
- PDF File:
- e7-703.pdf