95-31533. National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 1 (Tuesday, January 2, 1996)]
    [Notices]
    [Pages 62-63]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-31533]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-98-000]
    
    
    National Fuel Gas Supply Corporation; Notice of Request Under 
    Blanket Authorization
    
    December 26, 1995.
        Take notice that on December 5, 1995, National Fuel Gas Supply 
    Corporation (National), 10 Lafayette Square, Buffalo, New York, 14203, 
    filed in the above docket a request pursuant to Section 157.205 of the 
    Regulations under the Natural Gas Act to construct and operate a sales 
    tap that will render service to American Meter Company (American Meter) 
    under its authorization issued in Docket No. CP83-4-000 pursuant to 
    Section 7 of the Natural Gas Act, all as more fully set forth in the 
    application which is on file with the Commission and open to public 
    inspection.
        National proposes to construct and operate a new sales tap in Erie 
    County, Pennsylvania, on National's Line S-55. National indicates that 
    this tap will provide service to American Meter pursuant to National's 
    Rate Schedules IAS, FT and IT. National states that the service 
    provided under Rate Schedule IAS will require a new receipt point so 
    that National can receive gas back from American Meter. This new 
    receipt point will be constructed pursuant to the authority granted at 
    157.208(a) and will be located on National's Line L, less than 100 feet 
    from the proposed sales tap.
        The cost of construction for the sales tap is estimated to be 
    $60,000, for which National will be reimbursed by American Meter. The 
    cost of the automatically authorized receipt point is estimated to be 
    $4,000, for which National will be reimbursed by American Meter.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.214) a motion to intervene or notice of intervention and pursuant 
    to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 
    157.205) a protest to the request. If no protest is filed within the 
    time allowed therefor, the proposed activity is deemed to be authorized 
    effective on the day after the time allowed for filing a protest. If a 
    protest is filed and not withdrawn within 30 days after the time 
    allowed for filing a protest, the instant request shall be treated as 
    an application for 
    
    [[Page 63]]
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-31533 Filed 12-29-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
01/02/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-31533
Pages:
62-63 (2 pages)
Docket Numbers:
Docket No. CP96-98-000
PDF File:
95-31533.pdf