97-34172. El Segundo Power, LLC, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 63, Number 1 (Friday, January 2, 1998)]
    [Notices]
    [Pages 69-74]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-34172]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EG98-22-000, et al.]
    
    
    El Segundo Power, LLC, et al.; Electric Rate and Corporate 
    Regulation Filings
    
    December 24, 1997.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. El Segundo Power, LLC
    
    [Docket No. EG98-22-000]
    
        Take notice that on December 19, 1997, El Segundo Power, LLC, with 
    its principal office at 1221 Nicollet Mall, Suite 700, Minneapolis, MN 
    55403, filed with the Commission an application for determination of 
    exempt wholesale generator status pursuant to Part 365 of the 
    Commission's Regulations.
        Applicant states that it is a limited liability company organized 
    under the laws of the State of Delaware. Applicant will be engaged 
    directly and exclusively in owning and operating an approximately 1020 
    MW gas-fired electric generating facility located at 301 Vista Del Mar 
    Boulevard, El Segundo, CA 90245. Electric energy produced by the 
    facility will be sold at wholesale to the Independent System Operator 
    and into the California Power Exchange.
        Comment date: January 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. Tampa Electric Company
    
    [Docket No. ER97-169-000]
    
        Take notice that on December 12, 1997, Tampa Electric Company 
    (Tampa Electric) filed a letter agreement with the Florida Municipal 
    Power Agency (FMPA) that amends the letter of commitment between Tampa 
    Electric and FMPA tendered previously in this docket.
        Comment date: January 9, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. Central Hudson Gas & Electric Corporation; Consolidated Edison 
    Company of New York, Inc.; Long Island Lighting Company; New York 
    State Electric & Gas Corporation; Niagara Mohawk Power Corp.; 
    Orange and Rockland Utilities, Inc.; Rochester Gas and Electric 
    Corporation; New York Power Pool
    
    [Docket Nos. ER97-1523-000, OA97-470-000, and ER97-4234-000 (Not 
    Consolidated)]
    
        Take notice that on December 19, 1997, Central Hudson Gas & 
    Electric Corporation, Consolidated Edison Company of New York, Inc., 
    Long Island Lighting Company, New York State Electric & Gas 
    Corporation, Niagara Mohawk Power Corporation, Orange and Rockland 
    Utilities, Inc., and Rochester Gas and Electric Corporation (Member 
    Systems) filed, pursuant to Section 205 of the Federal Power Act, 
    revisions to the following documents filed on January 31, 1997, in the 
    above-referenced proceedings as part of the restructuring of the New 
    York Power Pool:
        1. Independent System Operator Agreement and the Independent System 
    Operator Tariff;
        2. New York State Reliability Council Agreement;
        3. Independent System Operator--New York State Reliability Council 
    Agreement; and
        4. Independent System Operator--Transmission Provider Agreement.
        In addition, the Member Systems filed the New York Independent 
    System Operator Filing Definitions Document, supporting information and 
    affidavits.
        The Member Systems state that the revised documents are being 
    served on the parties to this proceeding and the New York State Public 
    Service Commission, the Pennsylvania Public Utilities Commission and 
    the New Jersey Board of Public Utilities.
        Comment date: January 23, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. Idaho Power Company
    
    [Docket Nos. ER97-4021-000 and ER97-4023-000]
    
        Take notice that on December 8, 1997, Idaho Power Company (IPC), 
    tendered for filing an amended filing with regard to its Power Sale 
    Agreement with Truckee-Donner Public Utility District and the Network 
    Integration Transmission Agreement by Idaho Power on its Open-Access 
    Transmission Tariff.
        Comment date: January 9, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. Millennium Energy Corporation
    
    [Docket No. ER98-174-000]
    
        Take notice that on December 11, 1997, Millennium Energy 
    Corporation (Millennium Energy) tendered for filing an amendment and 
    supplement to its application filed October 15, 1997, for waivers and 
    blanket approvals under various regulations of the Commission and for 
    an order accepting its FERC Electric Rate Schedule No. 1, to be 
    effective on the date of the Commission's order accepting the Rate 
    Schedule for filing.
        Comment date: January 9, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Aurora Power Resources, Inc.
    
    [Docket No. ER98-573-000]
    
        Take notice that on December 11, 1997, Aurora Power Resources, Inc. 
    (APRI), filed a supplement to its application for market-based rates as 
    power marketer. The supplemental information pertains to ownership of 
    APRI, business activities of the owners and a statement of non-
    affiliation of APRI with any other entity.
        Comment date: January 9, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Central Illinois Public Service Company
    
    [Docket No. ER98-858-000]
    
        Take notice that on December 1, 1997, Central Illinois Public 
    Service Company (CIPS), submitted one non-firm point-to-point service 
    agreement and two umbrella short-term firm transmission service 
    agreements, each dated November 21, 1997, establishing the following as 
    customers under the terms of CIPS' Open Access Transmission Tariff, 
    Tenaska Power Services Co., and Entergy Power Marketing Corp.
        CIPS requests an effective date of November 21, 1997, for the 
    service agreements. Accordingly, CIPS requests waiver of the 
    Commission's notice requirements. Copies of this filing were
    
    [[Page 70]]
    
    served on the two customers and the Illinois Commerce Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Southern Company Services, Inc.
    
    [Docket No. ER98-860-000]
    
        Take notice that on November 26, 1997, Southern Company Services, 
    Inc., acting on behalf of Gulf Power Company, filed an amended Service 
    Agreement by and among itself, as agent for Gulf Power Company, Gulf 
    Power Company and the Florida Public Utilities Company (FPUC), on 
    behalf of its Marianna Division, pursuant to which Gulf Power Company 
    will make wholesale power sales to FPUC for a term in excess of one (1) 
    year.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. PP&L, Inc.
    
    [Docket No. ER98-863-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and QST Energy 
    Trading Inc., (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. PP&L, Inc.
    
    [Docket No. ER98-864-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and UGI Power 
    Supply, Inc., (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. PP&L, Inc.
    
    [Docket No. ER98-865-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and Dupont Power 
    Marketing, Inc., (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. PP&L, Inc.
    
    [Docket No. ER98-866-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L, UGI Utilities, 
    Inc. (UGI), and West Penn Power Company d/b/a Allegheny Power 
    (Supplier). The terms and conditions contained within this Agreement 
    are identical to the terms and conditions contained with the Form of 
    Transmission Agency Agreement submitted to the Commission on October 3, 
    1997, as part of the joint filing by the Pennsylvania Public Utility 
    Commission and the Pennsylvania PJM Utilities at Docket No. ER98-64-
    000. This filing merely submits an individual executed copy of the 
    Transmission Agency Agreement between PP&L, UGI and an alternative 
    supplier participating in UGI's Retail Access Pilot Program.
        Copies of the filing were served on UGI, the Supplier and the
        Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. PP&L, Inc.
    
    [Docket No. ER98-867-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and Energis 
    Resources, Incorporated (hereinafter Supplier). The terms and 
    conditions contained within this Agreement are identical to the terms 
    and conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. PP&L, Inc.
    
    [Docket No. ER98-868-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and Delmarva Power 
    & Light Company (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. PP&L, Inc.
    
    [Docket No. ER98-869-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and NorAm Energy
    
    [[Page 71]]
    
    Management, Inc., (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. PP&L, Inc.
    
    [Docket No. ER98-870-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L) filed an 
    executed Transmission Agency Agreement between PP&L and Allegheny 
    Energy Solutions, Inc., (hereinafter Supplier). The terms and 
    conditions contained within this Agreement are identical to the terms 
    and conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. PP&L, Inc.
    
    [Docket No. ER98-871-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L) filed an 
    executed Transmission Agency Agreement between PP&L and GPU Advanced 
    Resources, Inc., (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. PP&L, Inc.
    
    [Docket No. ER98-872-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and Strategic 
    Energy Partners Ltd., (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. PP&L, Inc.
    
    [Docket No. ER98-873-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L) filed an 
    executed Transmission Agency Agreement between PP&L and New Energy 
    Ventures, L.L.C., (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. PP&L, Inc.
    
    [Docket No. ER98-874-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and DTE-CoEnergy, 
    L.L.C., (hereinafter Supplier). The terms and conditions contained 
    within this Agreement are identical to the terms and conditions 
    contained with the Form of Transmission Agency Agreement submitted to 
    the Commission on October 3, 1997, as part of the joint filing by the 
    Pennsylvania Public Utility Commission and the Pennsylvania PJM 
    Utilities at Docket No. ER98-64-000. This filing merely submits an 
    individual executed copy of the Transmission Agency Agreement between 
    PP&L and an alternative supplier participating in PP&L's Retail Access 
    Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. PP&L, Inc.
    
    [Docket No. ER98-875-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and Southern Energy 
    Retail Trading and Marketing, Inc., (hereinafter Supplier). The terms 
    and conditions contained within this Agreement are identical to the 
    terms and conditions contained with the Form of Transmission Agency 
    Agreement submitted to the Commission on October 3, 1997, as part of 
    the joint filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. Southern Company Services, Inc.
    
    [Docket No. ER98-876-000]
    
        Take notice that on December 2, 1997, Alabama Power Company (APC), 
    filed proposed changes to Rate Schedule REA-1 of FERC Electric Tariff, 
    Original Volume No. 1, of Alabama Power
    
    [[Page 72]]
    
    Company. The proposed changes will provide the affected customers a 
    rate reduction. In addition, the filing proposes to revise Rate 
    Schedule REA-1's provisions for terminating service at any given 
    delivery point. APC has requested an effective date of January 1, 1997. 
    The filing also contains corresponding Statements of Consent from the 
    affected Customers.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. PP&L, Inc.
    
    [Docket No. ER98-877-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and CNG Retail 
    Services Corporation (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. PP&L, Inc.
    
    [Docket No. ER98-878-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and Enron Power 
    Marketing, Inc., (hereinafter Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L and an alternative supplier participating in 
    PP&L's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    25. PP&L, Inc.
    
    [Docket No. ER98-879-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L, UGI Utilities, 
    Inc. (UGI), and New Energy Partners, L.L.C., (Supplier). The terms and 
    conditions contained within this Agreement are identical to the terms 
    and conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L, UGI and an alternative supplier participating 
    in UGI's Retail Access Pilot Program.
        Copies of the filing were served on UGI, the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. PP&L, Inc.
    
    [Docket No. ER98-880-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L, UGI Utilities, 
    Inc. (UGI), and DTE Co Energy L.L.C., (Supplier). The terms and 
    conditions contained within this Agreement are identical to the terms 
    and conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L, UGI and an alternative supplier participating 
    in UGI's Retail Access Pilot Program.
        Copies of the filing were served on UGI, the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. PP&L, Inc.
    
    [Docket No. ER98-881-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L, UGI Utilities, 
    Inc. (UGI), and Allegheny Energy Solutions, Inc., (Supplier). The terms 
    and conditions contained within this Agreement are identical to the 
    terms and conditions contained with the Form of Transmission Agency 
    Agreement submitted to the Commission on October 3, 1997, as part of 
    the joint filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L, UGI and an alternative supplier participating 
    in UGI's Retail Access Pilot Program.
        Copies of the filing were served on UGI, the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. PP&L, Inc.
    
    [Docket No. ER98-882-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L, UGI Utilities, 
    Inc. (UGI), and Delmarva Power d/b/a Connectiv Energy (Supplier). The 
    terms and conditions contained within this Agreement are identical to 
    the terms and conditions contained with the Form of Transmission Agency 
    Agreement submitted to the Commission on October 3, 1997, as part of 
    the joint filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L, UGI and an alternative supplier participating 
    in UGI's Retail Access Pilot Program.
        Copies of the filing were served on UGI, the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    29. PP&L, Inc.
    
    [Docket No. ER98-883-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L, UGI Utilities, 
    Inc. (UGI) and UGI Power Supply, Inc., (Supplier). The terms and 
    conditions contained within this Agreement are identical to the terms 
    and conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket
    
    [[Page 73]]
    
    No. ER98-64-000. This filing merely submits an individual executed copy 
    of the Transmission Agency Agreement between PP&L, UGI and an 
    alternative supplier participating in UGI's Retail Access Pilot 
    Program.
        Copies of the filing were served on UGI, the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    30. PP&L, Inc.
    
    [Docket No. ER98-884-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L and Horizon Energy 
    Company (hereinafter Supplier). The terms and conditions contained 
    within this Agreement are identical to the terms and conditions 
    contained with the Form of Transmission Agency Agreement submitted to 
    the Commission on October 3, 1997, as part of the joint filing by the 
    Pennsylvania Public Utility Commission and the Pennsylvania PJM 
    Utilities at Docket No. ER98-64-000. This filing merely submits an 
    individual executed copy of the Transmission Agency Agreement between 
    PP&L and an alternative supplier participating in PP&L's Retail Access 
    Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    31. PP&L, Inc.
    
    [Docket No. ER98-885-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L, UGI Utilities, 
    Inc. (UGI), and Energis Resources Incorporated (Supplier). The terms 
    and conditions contained within this Agreement are identical to the 
    terms and conditions contained with the Form of Transmission Agency 
    Agreement submitted to the Commission on October 3, 1997, as part of 
    the joint filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L, UGI and an alternative supplier participating 
    in UGI's Retail Access Pilot Program.
        Copies of the filing were served on UGI, the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    32. PP&L, Inc.
    
    [Docket No. ER98-888-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L, UGI Utilities, 
    Inc. (UGI), and Horizon Energy (Supplier). The terms and conditions 
    contained within this Agreement are identical to the terms and 
    conditions contained with the Form of Transmission Agency Agreement 
    submitted to the Commission on October 3, 1997, as part of the joint 
    filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L, UGI and an alternative supplier participating 
    in UGI's Retail Access Pilot Program.
        Copies of the filing were served on UGI, the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    33. PP&L, Inc.
    
    [Docket No. ER98-889-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L) filed an 
    executed Transmission Agency Agreement between PP&L, UGI Utilities, 
    Inc. (UGI), and CNG Retail Service Corporation (Supplier). The terms 
    and conditions contained within this Agreement are identical to the 
    terms and conditions contained with the Form of Transmission Agency 
    Agreement submitted to the Commission on October 3, 1997, as part of 
    the joint filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L, UGI and an alternative supplier participating 
    in UGI's Retail Access Pilot Program.
        Copies of the filing were served on UGI, the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    34. PP&L, Inc.
    
    [Docket No. ER98-890-000]
    
        Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
    executed Transmission Agency Agreement between PP&L, UGI Utilities, 
    Inc. (UGI), and Strategic Energy Partners Ltd. (Supplier). The terms 
    and conditions contained within this Agreement are identical to the 
    terms and conditions contained with the Form of Transmission Agency 
    Agreement submitted to the Commission on October 3, 1997, as part of 
    the joint filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
    merely submits an individual executed copy of the Transmission Agency 
    Agreement between PP&L, UGI and an alternative supplier participating 
    in UGI's Retail Access Pilot Program.
        Copies of the filing were served on UGI, the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    35. Cinergy Capital & Trading, Inc.
    
    [Docket No. ER98-1063-000]
    
        Take notice that on December 15, 1997, Cinergy Capital & Trading, 
    Inc. (CC&T), filed an amendment to its Rate Schedule FERC No. 1. CC&T 
    has requested a January 15, 1998, effective date for the amendment to 
    Rate Schedule FERC No. 1.
        Comment date: January 9, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    36. Consumers Energy Company
    
    [Docket No. ER98-1117-000]
    
        Take notice that on December 15, 1997, Consumers Energy Company 
    (Consumers), filed Amendment No. 1, to its Power Sales Agreement with 
    Edison Sault Electric Company.
        Consumers has requested that this filing be accepted retroactive to 
    January 1, 1997, to coincide with the proposed effective date of a 
    concurrently filed settlement agreement of transmission agreement 
    issues.
        Copies of the filing were served upon Edison Sault Electric Company 
    and the Michigan Public Service Commission.
        Comment date: January 7, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in
    
    [[Page 74]]
    
    determining the appropriate action to be taken, but will not serve to 
    make protestants parties to the proceeding. Any person wishing to 
    become a party must file a motion to intervene. Copies of this filing 
    are on file with the Commission and are available for public 
    inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-34172 Filed 12-31-97; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
01/02/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-34172
Dates:
January 15, 1998, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
69-74 (6 pages)
Docket Numbers:
Docket No. EG98-22-000, et al.
PDF File:
97-34172.pdf