    [Docket No. CP98-144-000]
    
    
    Natural Gas Pipeline Company of America; Notice of Request Under 
    Blanket Authorization
    
    December 24, 1997.
        Take notice that on December 18, 1997, Natural Gas Pipeline Company 
    of America (Natural), 701 East 22nd Street, Lombard, Illinois 60148, 
    filed in Docket No. CP98-144-000 a request pursuant to Sections 157.205 
    and 157.212(a) of the Commission's Regulations under the Natural Gas 
    Act (18 CFR 157.205 and 157.212(a)) seeking NGA Section 7(c) 
    certification to retain and operate an existing 3-inch tap and dual 2-
    inch meter originally authorized under NGPA Section 311 to deliver gas 
    to Land O'Lakes, Inc. in Beaver County, Oklahoma, under the blanket 
    certificate issued in Docket No. CP82-402-000, all as more fully set 
    forth in the request which is on file with the Commission and open to 
    public inspection.
        Natural states that it seeks NGA certification in order that it may 
    be used to provide Part 284 Subpart G transportation. Natural's 
    proposed quantities to be delivered at the existing point of delivery 
    are 1,300 MMBtu/day. Natural states that the end use of gas is for Land 
    O'Lakes, Inc. Natural states that it can provide the quantities of 
    natural gas without detriment or disadvantage to its peak day and 
    annual delivery capacity. Natural notes that the total volume of gas to 
    be delivered after the facilities are certificated will not exceed the 
    total volume originally capable of being delivered. Natural states that 
    the facilities were placed in-service on November 2, 1997. Natural 
    contends that it is currently providing interruptible transportation 
    service by means of the subject facilities under Rate Schedule ITS.
        Natural asserts that it obtained the appropriate environmental 
    clearances from the Oklahoma Historical Society, the United States 
    Department of Interior Fish and Wildlife Service, the Oklahoma 
    Archaeological Survey, and the Department of the Army Corps of 
    Engineers for its proposed construction.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed authorized effective the day 
    after the time allowed for filing a protest. If a protest is filed and 
    not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-34174 Filed 12-31-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
01/02/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-34174
Pages:
64-64 (1 pages)
Docket Numbers:
Docket No. CP98-144-000
PDF File:
97-34174.pdf