-
Start Preamble
AGENCY:
Office of Hazardous Materials Safety, Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT.
ACTION:
List of application delayed more than 180 days.
SUMMARY:
In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ryan Paquet, Director, Office of Hazardous Materials Special Permits and Approvals, Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building, PHH-30, 1200 New Jersey Avenue Southeast, Washington, DC 20590-0001, (202) 366-4535
Key to “Reason for Delay”
1. Awaiting additional information from applicant
2. Extensive public comment under review
3. Application is technically complex and is of significant impact or precedent-setting and requires extensive analysis
4. Staff review delayed by other priority issues or volume of special permit applications
Meaning of Application Number Suffixes
N—New application
M—Modification request
R—Renewal Request
P—Party To Exemption Request
Start SignatureIssued in Washington, DC, on December 8, 2014.
Donald Burger,
Chief, General Approvals and Permits.
End Further Info End PreambleApplication No. Applicant Reason for delay Estimated date of completion Modification to Special Permits 9847-M FIBA Technologies, Inc. (FIBA), Millbury, MA 4 12-31-2014 14617-M Western International Gas & Cylinders, Inc., Bellville, TX 4 01-31-2015 13359-M BASF Corporation, Florham Park, NJ 4 01-31-2015 11903-M Comptank Corporation Bothwell, ON 4 01-31-2015 15832-M Baker Petrolite Corporation (BPC), Sugar Land, TX 4 12-31-2014 New Special Permit Applications 15767-N Union Pacific Railroad Company,Omaha, NE 1 12-31-2014 16001-N VELTEK, Malvern, PA 4 12-31-2014 16039-N UTLX Manufacturing LLC, Alexandria, LA 4 12-31-2014 16061-N Battery Solutions, LLC, Howell, MI 4 12-31-2014 16137-N Diversified Laboratory Repair, Gaithersburg, MD 4 12-31-2014 16118-N Toyota Motor Sales, U.S.A., Inc., Torrance, CA 4 01-31-2015 16155-N B.J. Alan Company dba Phantom Fireworks, Canfield, OH 4 12-31-2014 16121-N U.S. Department of Defense (DOD), Scott AFB, IL 4 01-31-2015 16154-N Patriot Fireworks, LLC, Ann Arbor, MI 4 12-31-2014 16181-N Arc Process, Inc., Pflugerville, TX 4 01-31-2015 Start Printed Page 106 15991-N Dockweiler, Neustadt-Glewe, Germany 4 12-31-2014 Renewal Special Permits Applications 11602-R East Tennessee Iron & Metal, Inc., Rogersville, TN 4 12-31-2014 11860-R GATX Corporation, Chicago, IL 4 12-31-2014 15580-R Wisconsin Central Ltd., Homewood, IL 4 12-31-2014 15458-R Southern States LLC, Hampton, GA 4 01-31-2015 [FR Doc. 2014-30557 Filed 12-31-14; 8:45 am]
BILLING CODE 4910-60-M
Document Information
- Published:
- 01/02/2015
- Department:
- Pipeline and Hazardous Materials Safety Administration
- Entry Type:
- Notice
- Action:
- List of application delayed more than 180 days.
- Document Number:
- 2014-30557
- Pages:
- 105-106 (2 pages)
- PDF File:
- 2014-30557.pdf
- Supporting Documents:
- » Hazardous Materials: Actions on Special Permits
- » Hazardous Materials: Applications for Modifications to Special Permits
- » Hazardous Materials: Applications for Special Permits
- » Hazardous Materials: Applications for Special Permits
- » Special Permit Applications
- » Special Permit Applications: Hazardous Materials
- » Special Permit Applications
- » Hazardous Materials: Applications for Special Permits
- » Association of American Railroads Letter to PHMSA re: NAERG LNG SP Final
- » Meetings: Virtual Public Meeting