94-1313. Northern States Power Co., et al.; Electric Rates and Corporate Regulation Filings  

  • [Federal Register Volume 59, Number 13 (Thursday, January 20, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-1313]
    
    
    [[Page Unknown]]
    
    [Federal Register: January 20, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. ER94-113-000, et al.]
    
     
    
    Northern States Power Co., et al.; Electric Rates and Corporate 
    Regulation Filings
    
    January 12, 1994.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Northern States Power Co. (Minnesota) and Northern States Power 
    Co. (Wisconsin)
    
    [Docket No. ER94-113-000]
    
        Take notice that on December 16, 1993, Northern States Power 
    Company tendered for filing an amendment in its November 2, 1993 filing 
    in this docket.
        Comment date: January 25, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    2. Sierra Pacific Power Co.
    
    [Docket No. ER94-119-000]
    
        Take notice that on December 29, 1993, Sierra Pacific Power Company 
    tendered for filing an amendment to its original filing tendered in the 
    above-referenced docket on November 3, 1993.
        Comment date: January 25, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. San Joaquin Valley Energy Partners IV, L.P., and BioConversion 
    Partners, L.P.
    
    [Dockets No. QF87-336-002 & QF87-336-003]
    
        On December 29, 1993, San Joaquin Valley Energy Partners IV, L.P. 
    (San Joaquin), and BioConversion Partners, L.P. (BioConversion), 
    (collectively, Applicants) of 24772 Road 16, Chowchilla, California 
    93610 submitted for filing an application for recertification of a 
    facility as a qualifying small power production facility (Docket No. 
    QF87-336-002) and another application for certification of the above 
    facility as a qualifying cogeneration facility (Docket No. QF87-336-
    003), pursuant to Sec. 292.207(b) of the Commission's Regulations. No 
    determination has been made that the submittal constitute complete 
    filings.
        In Docket No. QF87-336-000, Chowchilla Biomass Power Plant 
    Associates Limited Partnership was granted certification for an 8.8 MW 
    biomass-fueled small power production facility [39 FERC  62,269 
    (1987)]. The electricity produced is sold to Pacific Gas and Electric 
    Company. On July 31, 1992, in Docket No. QF87-336-001, San Joaquin 
    filed a notice of self-recertification pursuant to Sec. 292.207(a) of 
    the Commission's Regulations reporting a change in ownership of the 
    facility.
        According to the Applicants, the facility will now be owned by San 
    Joaquin and BioConversion. Northern States Power Company, an electric 
    utility, will have an ownership interest in the facility. The 
    Chowchilla I facility will now be modified to include the char 
    production facility owned by BioConversion, and the power generation 
    facility owned by San Joaquin. The maximum net electric power 
    production capacity of the facility will be 9.9 MW. The Applicants 
    request recertification as a small power production facility to reflect 
    the new ownership, and certification as a bottoming cycle cogeneration 
    facility to reflect facility modifications.
        Comment date: February 22, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, NE., Washington, DC 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-1313 Filed 1-19-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
01/20/1994
Department:
Federal Energy Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-1313
Dates:
January 25, 1994, in accordance with Standard Paragraph E at the end of this notice.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: January 20, 1994, Docket No. ER94-113-000, et al.