94-1488. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 59, Number 14 (Friday, January 21, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-1488]
    
    
    [[Page Unknown]]
    
    [Federal Register: January 21, 1994]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    
    [ER-FRL-4707-7]
    
     
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared January 03, 1994 Through 
    January 07, 1994 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 10, 1993 (58 
    FR 18392).
    
    Draft EISs
    
    ERP No. D-AFS-L61196-OR Rating LO
    
        Snake River Recreation Wild and Scenic River Management Plan, 
    Implementation, Hells Canyon National Recreation Area, Wallowa-Whitman 
    National Forest and Nez Perce and Payette National Forests, Bake and 
    Wallowa Counties, OR and Nez Perce, Idaho and Adams Counties, ID.
        Summary: EPA found no significant statutory or jurisdictional 
    issues from its perspective.
    
    ERP No. D-AFS-L65207-ID Rating EC2
    
        Fourmile Timber Sale, Timber Harvesting and Road Construction, 
    Payette National Forest, New Meadow Ranger District, Adam County, ID.
        Summary: EPA expressed environmental concerns based on the BMP 
    effectiveness, potential wetlands impacts, and potential air quality 
    impacts. Additional information is requested to address these issues in 
    the final EIS.
    
    ERP No. D-AFS-L65211-AK Rating EO2
    
        Polk Inlet Project, Long-Term Timber Sale Contract, Implementation, 
    Tongass National Forest, Prince of Wales Island, AK.
        Summary: EPA had environmental objections with the potential 
    impacts to water quality and fish habitat capability. EPA was also 
    concerned about marine impacts of LTFs, monitoring, timber harvest 
    sustainability, and forest camps. EPA requested that these issues be 
    fully discussed in the final EIS.
    
    ERP No. D-FHW-L40188-OR Rating EC2
    
        Port of the Dalles (Chenoweth) Columbia River Highway, Construction 
    of New Interchange North of Hostetler Street near Second and Division 
    Streets, Funding and COE Section 404 Permit, Wasco County, OR.
        Summary: EPA had environmental concerns based on the potential 
    impact to wetlands from highway runoff and induced growth. EPA also 
    requested additional information on wetland mitigation, indirect 
    effects and monitoring.
    
    ERP No. DS-IBR-L34010-WA Rating EO2
        Columbia Basin Continued Multipurpose Project, Implementation, 
    Grant, Adams, Lincoln, Franklin and Douglas Counties, WA.
        Summary: EPA expressed environmental objections and recommended 
    that the project be delayed until a revised Columbia River Instream 
    Protection Program is established and cumulative water withdrawal 
    impacts are assessed. The Columbia River's capacity to maintain 
    salmonid migration, spawning and rearing habitat is in jeopardy.
    
    Final EISs
    
    ERP No. F-AFS-L65182-OR
    
        East End Salvage Timber Sales and Restoration Projects, 
    Implementation, Umatilla National Forest, Heppner Ranger District, 
    Grant and Morrow Counties, OR.
        Summary: EPA provided no formal written comments. EPA had no 
    objections to the preferred alternative as described in the final 
    Environmental Impact Statement.
    
    ERP No. F-USA-G81007-NM
    
        Woodbridge Research Facility (WRF) Electromagnetic Pulse Simulators 
    Relocation Project, Construction and Operation, Sites Selected for Six 
    potential locations, Dugway Proving Ground, UT; Yuma Proving Ground, 
    AZ; and the remaining (4) in White Sands Missile Range, NM.
        Summary: EPA had no objections to the proposed project as described 
    in the Final EIS.
    
    ERP No. FS-USN-L11006-WA
    
        Puget Sound Area Carrier Battle Group, Implementation, Updated 
    Information on Element II Breakwater Pier Construction and Operation, 
    Everett Homeport Naval Station, Snohomish, King and Pierce Counties, 
    WA.
        Summary: EPA provided no formal written comments. EPA had no 
    objections to the preferred alternative as described in the EIS.
    
    
        Dated: January 18, 1994.
    William D. Dickerson,
    Deputy Director, Office of Federal Activities.
    [FR Doc. 94-1488 Filed 1-19-94; 4:15 pm]
    BILLING CODE 6560-50-U
    
    
    

Document Information

Published:
01/21/1994
Department:
Environmental Protection Agency
Entry Type:
Uncategorized Document
Document Number:
94-1488
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: January 21, 1994, ER-FRL-4707-7