-
Start Preamble
AGENCY:
Environmental Protection Agency.
ACTION:
Notice of proposed settlement.
SUMMARY:
Under Section 122(h)(1) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), the Environmental Protection Agency (EPA) has proposed to settle claims for response costs at the Jack Goins Waste Oil Superfund Site (Site) located in Cleveland, Tennessee, with Alstom Power, BFI (Chattanooga), Bowater Newsprint Operations, Emerson Electric, Johnston Coca-Cola Bottling Company, Maytag Cleveland Cooking Products, Smith & Green Construction Co., Inc., and Texaco, Inc. EPA will consider public comments on the proposed settlement for thirty days. EPA may withdraw from or modify the proposed settlement should such comments disclose facts or considerations which indicate the proposed settlement is inappropriate, improper, or inadequate. Copies of the proposed settlement are available from: Ms. Paula V. Batchelor, U.S. Environmental Protection Agency, Region IV, CERCLA Program Services Branch, Waste Management Division, 61 Forsyth Street, SW., Atlanta, Georgia 30303, (404) 562-8887.
Written comment may be submitted to Mr. Greg Armstrong at the above address within 30 days of the date of publication.
Start SignatureDated: January 3, 2003.
James Miller,
Acting Chief, CERCLA Program Services Branch, Waste Management Division.
[FR Doc. 03-1242 Filed 1-17-03; 8:45 am]
BILLING CODE 6560-50-P
Document Information
- Published:
- 01/21/2003
- Department:
- Environmental Protection Agency
- Entry Type:
- Notice
- Action:
- Notice of proposed settlement.
- Document Number:
- 03-1242
- Pages:
- 2766-2766 (1 pages)
- Docket Numbers:
- FRL-7440-7
- PDF File:
- 03-1242.pdf