[Federal Register Volume 62, Number 15 (Thursday, January 23, 1997)]
[Notices]
[Pages 3536-3538]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-1611]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-362]
Southern California Edison Company; Notice of Consideration of
Issuance of Amendment to Facility Operating License, Proposed no
Significant Hazards Consideration Determination, and Opportunity for a
Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Facility Operating License No.
NPF-15 issued to Southern California Edison Company (the licensee) for
operation of the San Onofre Nuclear Generating Station (SONGS), Unit
No. 3 located in San Diego County, California.
The proposed amendment would replace Surveillance Requirements
3.8.1.14 and 3.8.1.15 until the SONGS Unit 3 Cycle 9 refueling outage
(currently scheduled to begin on April 5, 1997), with surveillance
requirements that were in force when these surveillances were last
performed.
The exigent circumstances for this TS amendment request exist due
to the recent discovery of the inappropriate crediting of previous test
results to the post-Technical Specification Improvement Program SRs.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act) and the Commission's regulations.
Pursuant to 10 CFR 50.91(a)(6) for amendments to be granted under
exigent circumstances, the NRC staff must determine that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in 10 CFR 50.92, this means that operation of
the facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. As
required by 10 CFR 50.91(a), the licensee has provided its analysis of
the issue of no significant hazards consideration, which is presented
below:
1. The proposed change does not involve a significant increase
in the probability or consequences of an accident previously
evaluated.
The proposed change would temporarily replace Surveillance
Requirements (SRs) SR 3.8.1.14 and 3.8.1.15 with the SRs that had
existed for this testing in the Technical Specifications (TSs) prior
to the Technical Specification Improvement Program (TSIP).
Operation of the facility would remain unchanged as a result of
the proposed changes and no assumptions or results of any accident
analyses are affected. Therefore, the proposed change will not
involve a significant increase in the probability or consequences of
any accident previously evaluated.
2. The proposed change does not create the possibility of a new
or different kind of accident from any accident previously
evaluated.
The proposed change would temporarily replace Surveillance
Requirements (SRs) SR 3.8.1.14 and 3.8.1.15 with the SRs that had
existed for this testing in the previous (pre-TSIP) TS.
Operation of the facility would remain unchanged as a result of
the proposed change. Therefore, the proposed change will not create
the possibility of a new or different kind of accident from any
accident previously evaluated.
[[Page 3537]]
3. The proposed change does not involve a significant reduction
in a margin of safety.
The proposed change would temporarily replace Surveillance
Requirements (SRs) SR 3.8.1.14 and 3.8.1.15 with the SRs that had
existed for this testing in the previous (pre-TSIP) TS. Acceptance
of the pre-TSIP test, using higher generator output, would not
deleteriously impact any margin of safety. The generator output of
the Emergency Diesel Generator (EDG) is manually adjusted during the
SRs by the operator conducting the test. Imposing the post-TSIP
upper limit is less severe on the equipment since this ensures the
generator output is at a lower level during the test. Similarly,
operation of the facility would remain unchanged as a result of the
proposed change. Therefore, the proposed change will not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 15 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of the 15-day notice period. However, should circumstances
change during the notice period, such that failure to act in a timely
way would result, for example, in derating or shutdown of the facility,
the Commission may issue the license amendment before the expiration of
the 15-day notice period, provided that its final determination is that
the amendment involves no significant hazards consideration. The final
determination will consider all public and State comments received.
Should the Commission take this action, it will publish in the Federal
Register a notice of issuance. The Commission expects that the need to
take this action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rules
Review and Directives Branch, Division of Freedom of Information and
Publications Services, Office of Administration, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, and should cite the
publication date and page number of this Federal Register notice.
Written comments may also be delivered to Room 6D22, Two White Flint
North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m. to
4:15 p.m. Federal workdays. Copies of written comments received may be
examined at the NRC Public Document Room, the Gelman Building, 2120 L
Street, NW., Washington, DC.
The filing of requests for hearing and petitions for leave to
intervene is discussed below.
By February 24, 1997, the licensee may file a request for a hearing
with respect to issuance of the amendment to the subject facility
operating license and any person whose interest may be affected by this
proceeding and who wishes to participate as a party in the proceeding
must file a written request for a hearing and a petition for leave to
intervene. Requests for a hearing and a petition for leave to intervene
shall be filed in accordance with the Commission's ``Rules of Practice
for Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested
persons should consult a current copy of 10 CFR 2.714 which is
available at the Commission's Public Document Room, the Gelman
Building, 2120 L Street, NW., Washington, DC, and at the local public
document room located at the Main Library, University of California,
P.O. Box 19557, Irvine, California 92713. If a request for a hearing or
petition for leave to intervene is filed by the above date, the
Commission or an Atomic Safety and Licensing Board, designated by the
Commission or by the Chairman of the Atomic Safety and Licensing Board
Panel, will rule on the request and/or petition; and the Secretary or
the designated Atomic Safety and Licensing Board will issue a notice of
hearing or an appropriate order.
As required by 10 CFR 2.714, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following factors: (1) The nature of the petitioner's right under the
Act to be made a party to the proceeding; (2) the nature and extent of
the petitioner's property, financial, or other interest in the
proceeding; and (3) the possible effect of any order which may be
entered in the proceeding on the petitioner's interest. The petition
should also identify the specific aspect(s) of the subject matter of
the proceeding as to which petitioner wishes to intervene. Any person
who has filed a petition for leave to intervene or who has been
admitted as a party may amend the petition without requesting leave of
the Board up to 15 days prior to the first prehearing conference
scheduled in the proceeding, but such an amended petition must satisfy
the specificity requirements described above.
Not later than 15 days prior to the first prehearing conference
scheduled in the proceeding, a petitioner shall file a supplement to
the petition to intervene which must include a list of the contentions
which are sought to be litigated in the matter. Each contention must
consist of a specific statement of the issue of law or fact to be
raised or controverted. In addition, the petitioner shall provide a
brief explanation of the bases of the contention and a concise
statement of the alleged facts or expert opinion which support the
contention and on which the petitioner intends to rely in proving the
contention at the hearing. The petitioner must also provide references
to those specific sources and documents of which the petitioner is
aware and on which the petitioner intends to rely to establish those
facts or expert opinion. Petitioner must provide sufficient information
to show that a genuine dispute exists with the applicant on a material
issue of law or fact. Contentions shall be limited to matters within
the scope of the amendment under consideration. The contention must be
one which, if proven, would entitle the petitioner to relief. A
petitioner who fails to file such a supplement which satisfies these
requirements with respect to at least one contention will not be
permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing, including the opportunity to present evidence and cross-
examine witnesses.
If the amendment is issued before the expiration of the 30-day
hearing period, the Commission will make a final determination on the
issue of no significant hazards consideration. If a hearing is
requested, the final determination will serve to decide when the
hearing is held.
If the final determination is that the amendment request involves
no significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment.
If the final determination is that the amendment request involves a
significant hazards consideration, any hearing held would take place
before the issuance of any amendment.
A request for a hearing or a petition for leave to intervene must
be filed with the Secretary of the Commission, U.S.
[[Page 3538]]
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Docketing and Services Branch, or may be delivered to the Commission's
Public Document Room, the Gelman Building, 2120 L Street, NW.,
Washington, DC, by the above date. Where petitions are filed during the
last 10 days of the notice period, it is requested that the petitioner
promptly so inform the Commission by a toll-free telephone call to
Western Union at 1-(800) 248-5100 (in Missouri 1-(800) 342-6700). The
Western Union operator should be given Datagram Identification Number
N1023 and the following message addressed to William H. Bateman,
Director, Project Directorate IV-2: petitioner's name and telephone
number, date petition was mailed, plant name, and publication date and
page number of this Federal Register notice. A copy of the petition
should also be sent to the Office of the General Counsel, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, and to T.E. Oubre,
Esquire, Southern California Edison Company, P.O. Box 800, Rosemead,
California 91770, attorney for the licensee.
Nontimely filings of petitions for leave to intervene, amended
petitions, supplemental petitions and/or requests for hearing will not
be entertained absent a determination by the Commission, the presiding
officer or the presiding Atomic Safety and Licensing Board that the
petition and/or request should be granted based upon a balancing of the
factors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).
For further details with respect to this action, see the
application for amendment dated January 13, 1997, which is available
for public inspection at the Commission's Public Document Room, the
Gelman Building, 2120 L Street, NW., Washington, DC, and at the local
public document room, located at the Main Library, University of
California, P.O. Box 19557, Irvine, California 92713.
Dated at Rockville, Maryland, this 16th day of January 1997.
For the Nuclear Regulatory Commission.
Mel B. Fields,
Project Manager, Project Directorate IV-2, Division of Reactor Projects
III/IV, Office of Nuclear Reactor Regulation.
[FR Doc. 97-1611 Filed 1-22-97; 8:45 am]