2015-01179. Tennessee Valley Authority (Sequoyah Nuclear Plant, Units 1 and 2)  

  • Start Preamble

    Notice of Atomic Safety and Licensing Board Reconstitution

    Pursuant to 10 CFR 2.313(c) and 2.321(b), the Atomic Safety and Licensing Board in the above-captioned Sequoyah Nuclear Plant, Units 1 and 2 license renewal proceeding is hereby reconstituted by appointing Administrative Judge Paul S. Ryerson to serve as Chairman in place of Administrative Judge Alex S. Karlin, and by appointing Administrative Judge Michael F. Kennedy to serve in place of Administrative Judge Paul B. Abramson.

    All correspondence, documents, and other materials shall continue to be filed in accordance with the NRC E-Filing rule. See 10 CFR 2.302 et seq.

    Start Signature

    Issued at Rockville, Maryland, this 16th day of January 2015.

    E. Roy Hawkens,

    Chief Administrative Judge, Atomic Safety and Licensing Board Panel.

    End Signature End Preamble

    [FR Doc. 2015-01179 Filed 1-22-15; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Published:
01/23/2015
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
2015-01179
Pages:
3660-3660 (1 pages)
Docket Numbers:
Docket Nos. 50-327-LR and 50-238-LR, ASLBP No. 13-927-01-LR-BD01
PDF File:
2015-01179.pdf