    New York State Electric & Gas Corporation; Notice of Application
    
    January 17, 1997.
        Take notice that on January 10, 1997, New York State Electric & Gas 
    Corporation (NYSEG), 4500 Vestal Parkway East, Binghamton, New York 
    13902-3607, filed in Docket No. CP97-
    
    [[Page 3670]]
    
    192-000, an application pursuant to Section 7 of the Natural Gas Act, 
    as amended, and Sec. 284.224 of the Commission's Regulations, for a 
    limited-jurisdiction blanket certificate of public convenience and 
    necessity authorizing NYSEG to provide firm and interruptible storage 
    services at market-based rates at its Seneca Lake storage field located 
    in Schuyler County, New York, all as more fully set forth in the 
    application which is on file with the Commission and open to public 
    inspection.\1\
    ---------------------------------------------------------------------------
    
        \1\ NYSEG is a Hinshaw pipeline which is exempt from the 
    Commission's jurisdiction under Section 1(c) of the NGA.
    ---------------------------------------------------------------------------
    
        NYSEG states that the storage it intends to perform in interstate 
    commerce will be made possible through the use of compression already 
    installed at its Seneca Lake storage field, combined with two 
    additional compressors, rated at 2,587 horsepower each, which it plans 
    to install. NYSEG avers that it filed an application on December 16, 
    1996 with the State of New York Public Service Commission seeking 
    authority to install these additional compressor units. According to 
    NYSEG, the additional compression will enable NYSEG to: (1) Inject up 
    to 72.5 MMcfd of natural gas into storage during a 20-day injection 
    cycle; and (2) deliver up to 145 MMcfd of natural gas from storage 
    during the 10-day withdrawal period.
        As part of its request, NYSEG asks the Commission to make a 
    determination under Sec. 284.123(b)(2) of the regulations that the 
    rates and charges proposed in the application are fair and equitable.
        Any person desiring to be heard or make any protest with reference 
    to said application should on or before February 7, 1997, file with the 
    Federal Energy Regulatory Commission, 888 First Street, NE., 
    Washington, D.C. 20426, a motion to intervene or a protest in 
    accordance with the requirements of the Commission's Rules of Practice 
    and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the 
    Natural Gas Act (18 CFR 157.10). All protests filed with the Commission 
    will be considered by it in determining the appropriate action to be 
    taken but will not serve to make the protestants parties to the 
    proceeding. Any person wishing to become a party to a proceeding or to 
    participate as a party in any hearing therein must file a motion to 
    intervene in accordance with the Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to the jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required herein, if the Commission on its own review of the matter 
    finds that permission and approval for the proposed abandonment and 
    grant of certificate are required by the public convenience and 
    necessity. If a motion for leave to intervene is timely filed, or if 
    the Commission on its own motion believes that a formal hearing is 
    required, further notice of such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for NYSEG to appear or be represented at the 
    hearing.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 97-1686 Filed 1-23-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
01/24/1997
Department:
Energy Department
Entry Type:
Notice
Document Number:
97-1686
Pages:
3669-3670 (2 pages)
Docket Numbers:
Docket No. CP97-192-000
PDF File:
97-1686.pdf