97-1688. Florida Gas Transmission Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 16 (Friday, January 24, 1997)]
    [Notices]
    [Pages 3668-3669]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-1688]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP97-196-000]
    
    
    Florida Gas Transmission Company; Notice of Request Under Blanket 
    Authorization
    
    January 17, 1997.
        Take notice that on January 15, 1997, Florida Gas Transmission 
    Company (FGT), 1400 Smith Street, P.O. Box 1188, Houston, Texas 77251-
    1188, filed in Docket No. CP97-196-000 a request pursuant to Sections 
    157.205 and 157.212 of the Commission's Regulations under the Natural 
    Gas Act (18 CFR 157.205, 157.212) for authorization to construct a new 
    delivery point and approximately 400 feet of 12-inch pipeline in 
    Volusia County, Florida for delivery of natural gas to Florida Power 
    Corporation (FPC) under FGT's blanket certificate issued in Docket No. 
    CP82-553-000 pursuant to Section 7 of the Natural Gas Act, all as more 
    fully set forth in the request that is on file with the Commission and 
    open to public inspection.
        FGT proposes to construct a new tap, valve, approximately 400 feet 
    of 12-inch connecting lateral and electronic flow measurement equipment 
    and any other necessary appurtenant facilities to accommodate the 
    measurement of gas, up to 4,400 MMBtu per hour at line pressure. FGT 
    states that the natural gas volumes delivered to this new delivery 
    point will be interruptible volumes and that initial deliveries will be 
    approximately 2,200 MMBtu per hour.
        FGT states that FPC would reimburse it for all construction costs, 
    estimated to be $150,000. FGT states that FPC proposes to construct own 
    and operate the meter station and approximately 3.3 miles of 12-inch 
    non-jurisdictional pipeline connecting the meter station to the power 
    plant.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for
    
    [[Page 3669]]
    
    authorization pursuant to Section 7 of the Natural Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 97-1688 Filed 1-23-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
01/24/1997
Department:
Energy Department
Entry Type:
Notice
Document Number:
97-1688
Pages:
3668-3669 (2 pages)
Docket Numbers:
Docket No. CP97-196-000
PDF File:
97-1688.pdf