06-584. Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, VA  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, Fifth Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Berkley Bridge, at mile 0.4, across the Eastern Branch of the Elizabeth River in Norfolk, Virginia. To facilitate electrical repairs, this deviation allows the drawbridge to remain closed-to-navigation from 7 a.m. on February 7, 2006, to 7 a.m. on February 8, 2006 and from 7 a.m. on February 14, 2006, to 7 a.m. on February 15, 2006.

    DATES:

    This deviation is effective from 7 a.m. on February 7, 2006, to 7 a.m. on February 15, 2006.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Gary Heyer, Bridge Management Specialist, Fifth Coast Guard District, at (757) 398-6629.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Berkley Bridge, a lift-type drawbridge, has a vertical clearance in the closed position to vessels of 48 feet, at mean high water.

    The bridge owner, the Virginia Department of Transportation, has requested a temporary deviation from the current operating regulation set out in 33 CFR 117.1007, to effect electrical repairs of the draw span.

    To facilitate the repairs, the drawbridge will be closed to navigation from 7 a.m. on February 7, 2006, to 7 a.m. on February 8, 2006 and from 7 a.m. on February 14, 2006, to 7 a.m. on February 15, 2006. During these periods, the repairs require immobilizing the operation of the lift span in the closed-to-navigation position. At all other times, the drawbridge will operate in accordance with the current operating regulations outlined in 33 CFR 117.1007.

    The Coast Guard has informed the known users of the waterway so that they can arrange their transits to minimize any impact caused by the temporary deviation.

    In accordance with 33 CFR 117.35(c), this work will be performed with all due speed in order to return the bridge to Start Printed Page 3764normal operation as soon as possible. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: January 17, 2006.

    Waverly W. Gregory, Jr.,

    Chief, Bridge Administration Branch, Fifth Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 06-584 Filed 1-23-06; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
2/7/2006
Published:
01/24/2006
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
06-584
Dates:
This deviation is effective from 7 a.m. on February 7, 2006, to 7 a.m. on February 15, 2006.
Pages:
3763-3764 (2 pages)
Docket Numbers:
CGD05-06-004
RINs:
1625-AA09: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
PDF File:
06-584.pdf
CFR: (1)
33 CFR 117