95-1831. Renewable Energy Ireland Limited, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 60, Number 16 (Wednesday, January 25, 1995)]
    [Notices]
    [Pages 4906-4907]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-1831]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. EG95-27-000, et al.]
    
    
    Renewable Energy Ireland Limited, et al.; Electric Rate and 
    Corporate Regulation Filings
    
    January 18, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Renewable Energy Ireland Limited
    
    [Docket No. EG95-27-000]
    
        On January 11, 1995, Renewable Energy Ireland Limited (``REI'') 
    filed with the Federal Energy Regulatory Commission an application for 
    determination of exempt wholesale generator status pursuant to Part 365 
    of the Commission's regulations. REI is engaged directly and 
    exclusively in the business of owning and operating a 6.45 MW wind 
    farm, which is an eligible facility, located at Bellacorick in County 
    Mayo, Ireland and selling electric energy at wholesale in Ireland.
        Comment date: February 3, 1995, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. Noram Energy Services, Inc.
    
    [Docket No. ER94-1247-002]
    
        Take notice that on January 4, 1995, Noram Energy Services, Inc. 
    tendered for filing a Notice of Succession in Ownership or Operation in 
    the above-referenced docket.
        Comment date: February 1, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. Baltimore Gas and Electric Company
    
    [Docket No. ER95-185-000]
    
        Take notice that Baltimore Gas and Electric Company (BGE), on 
    January 4, 1995, tendered for filing an amendment to its November 14, 
    1994, filing of the Short-Term Energy Transactions Agreement between 
    Delmarva Power & Light Company and BGE in the above-captioned docket. 
    The amendment modifies Section II.C of the Agreement to reflect hourly, 
    daily, weekly, and monthly and Maximum Reservation Charges.
        BGE has requested waiver of the Commission's notice requirements to 
    allow for an effective date of November 18, 1994, as originally 
    requested.
        Comment date: February 1, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. New England Power Company
    
    [Docket No. ER95-253-000]
    
        Take notice that New England Power Company on December 22, 1994, 
    [[Page 4907]] tendered for filing a correction to a typographical error 
    in its filing letter in this docket.
        Comment date: February 1, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. Southern Indiana Gas and Electric Company
    
    [Docket No. ER95-375-000]
    
        Take notice that Southern Indiana Gas and Electric Company (SIGECO) 
    on December 30, 1994, tendered for filing Supplement No. 10 to Electric 
    Power Agreement with Alcoa Generating Corporation (AGC), dated May 21, 
    1971 (Alcoa Generating Corporation, FERC Rate Schedule No. 2) (Southern 
    Indiana Gas and Electric Company, FERC Rate Schedule No. 29), and 
    modified by the Fourth, Fifth, Sixth, Eighth, and Ninth Supplements. 
    The Tenth Supplement proposes to replace Article II, Section 2.6 of the 
    said agreement with a new section 2.6 which provides for the sale of 
    Non-Displacement Energy by AGC from its capacity ownership on Warrick 
    Unit No. 4 to SIGECO, at a rate equal to the out-of-pocket costs of 
    AGC, plus up to ten percent of such costs.
        The proposed Supplement will permit Southern Indiana Gas and 
    Electric Company to utilize, to its own and its customers advantage, 
    surplus electric energy that Alcoa Generating Corporation is willing to 
    make available from capacity on its ownership of Warrick Unit 4. The 
    intent of such Non-Displacement Energy purchases is to supplement, but 
    not displace, energy which SIGECO would itself generate to meet its 
    needs.
        Waiver of the Commission's Notice Requirements is requested to 
    allow for an effective date of November 14, 1994.
        Comment date: February 1, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Portland General Electric Company
    
    [Docket No. ER95-414-000]
    
        Take notice that on January 11, 1995, Portland General Electric 
    Company (PGE), tendered for filing an executed service agreement under 
    FERC Electric Tariff, Original Volume No. (PGE-1), with Gulfstream 
    Energy, LLC. By this filing, PGE seeks to correct the customer name for 
    Service Agreement No. 40 under FERC Electric Tariff, Original Volume 
    No. 1. Copies of the filing have been served on the parties included in 
    the Certificate of Service attached to the filing letter.
        Comment date: February 1, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Boston Edison Company
    
    [Docket No. ER95-415-000]
    
        Take notice that on January 11, 1995, Boston Edison Company 
    (Edison), tendered for filing a supplemental Exhibit A to a Service 
    Agreement for Hull Municipal Light Plant (Hull), under its FERC 
    Electric Tariff, Original Volume No. III, Non-Firm Transmission Service 
    (the Tariff). The required Exhibit A specifies the amount and duration 
    of transmission service required by Braintree under the Tariff.
        Edison states that it has served the filing on Hull and on the 
    Massachusetts Department of Public Utilities.
        Edison requests a waiver of the Commission's notice requirements to 
    permit the Exhibit A to become effective as of the commencement date of 
    the transaction to which it relates, November 1, 1994.
        Comment date: February 1, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. San Diego Gas & Electric Company
    
    [Docket No. ER95-416-000]
    
        Take notice that on January 12, 1995, San Diego Gas & Electric 
    Company (SDG&E), tendered for filing an Interchange Agreement 
    (Agreement) between SDG&E and Associated Power Services, Inc. (APSI).
        SDG&E requests that the Commission allow the Agreement to become 
    effective on the 15th day of March, 1995 or at the earliest possible 
    date.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and APSI.
        Comment date: February 1, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-1831 Filed 1-24-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
01/25/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-1831
Dates:
February 3, 1995, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
4906-4907 (2 pages)
Docket Numbers:
Docket No. EG95-27-000, et al.