[Federal Register Volume 60, Number 16 (Wednesday, January 25, 1995)]
[Notices]
[Pages 4906-4907]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-1831]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. EG95-27-000, et al.]
Renewable Energy Ireland Limited, et al.; Electric Rate and
Corporate Regulation Filings
January 18, 1995.
Take notice that the following filings have been made with the
Commission:
1. Renewable Energy Ireland Limited
[Docket No. EG95-27-000]
On January 11, 1995, Renewable Energy Ireland Limited (``REI'')
filed with the Federal Energy Regulatory Commission an application for
determination of exempt wholesale generator status pursuant to Part 365
of the Commission's regulations. REI is engaged directly and
exclusively in the business of owning and operating a 6.45 MW wind
farm, which is an eligible facility, located at Bellacorick in County
Mayo, Ireland and selling electric energy at wholesale in Ireland.
Comment date: February 3, 1995, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. Noram Energy Services, Inc.
[Docket No. ER94-1247-002]
Take notice that on January 4, 1995, Noram Energy Services, Inc.
tendered for filing a Notice of Succession in Ownership or Operation in
the above-referenced docket.
Comment date: February 1, 1995, in accordance with Standard
Paragraph E at the end of this notice.
3. Baltimore Gas and Electric Company
[Docket No. ER95-185-000]
Take notice that Baltimore Gas and Electric Company (BGE), on
January 4, 1995, tendered for filing an amendment to its November 14,
1994, filing of the Short-Term Energy Transactions Agreement between
Delmarva Power & Light Company and BGE in the above-captioned docket.
The amendment modifies Section II.C of the Agreement to reflect hourly,
daily, weekly, and monthly and Maximum Reservation Charges.
BGE has requested waiver of the Commission's notice requirements to
allow for an effective date of November 18, 1994, as originally
requested.
Comment date: February 1, 1995, in accordance with Standard
Paragraph E at the end of this notice.
4. New England Power Company
[Docket No. ER95-253-000]
Take notice that New England Power Company on December 22, 1994,
[[Page 4907]] tendered for filing a correction to a typographical error
in its filing letter in this docket.
Comment date: February 1, 1995, in accordance with Standard
Paragraph E at the end of this notice.
5. Southern Indiana Gas and Electric Company
[Docket No. ER95-375-000]
Take notice that Southern Indiana Gas and Electric Company (SIGECO)
on December 30, 1994, tendered for filing Supplement No. 10 to Electric
Power Agreement with Alcoa Generating Corporation (AGC), dated May 21,
1971 (Alcoa Generating Corporation, FERC Rate Schedule No. 2) (Southern
Indiana Gas and Electric Company, FERC Rate Schedule No. 29), and
modified by the Fourth, Fifth, Sixth, Eighth, and Ninth Supplements.
The Tenth Supplement proposes to replace Article II, Section 2.6 of the
said agreement with a new section 2.6 which provides for the sale of
Non-Displacement Energy by AGC from its capacity ownership on Warrick
Unit No. 4 to SIGECO, at a rate equal to the out-of-pocket costs of
AGC, plus up to ten percent of such costs.
The proposed Supplement will permit Southern Indiana Gas and
Electric Company to utilize, to its own and its customers advantage,
surplus electric energy that Alcoa Generating Corporation is willing to
make available from capacity on its ownership of Warrick Unit 4. The
intent of such Non-Displacement Energy purchases is to supplement, but
not displace, energy which SIGECO would itself generate to meet its
needs.
Waiver of the Commission's Notice Requirements is requested to
allow for an effective date of November 14, 1994.
Comment date: February 1, 1995, in accordance with Standard
Paragraph E at the end of this notice.
6. Portland General Electric Company
[Docket No. ER95-414-000]
Take notice that on January 11, 1995, Portland General Electric
Company (PGE), tendered for filing an executed service agreement under
FERC Electric Tariff, Original Volume No. (PGE-1), with Gulfstream
Energy, LLC. By this filing, PGE seeks to correct the customer name for
Service Agreement No. 40 under FERC Electric Tariff, Original Volume
No. 1. Copies of the filing have been served on the parties included in
the Certificate of Service attached to the filing letter.
Comment date: February 1, 1995, in accordance with Standard
Paragraph E at the end of this notice.
7. Boston Edison Company
[Docket No. ER95-415-000]
Take notice that on January 11, 1995, Boston Edison Company
(Edison), tendered for filing a supplemental Exhibit A to a Service
Agreement for Hull Municipal Light Plant (Hull), under its FERC
Electric Tariff, Original Volume No. III, Non-Firm Transmission Service
(the Tariff). The required Exhibit A specifies the amount and duration
of transmission service required by Braintree under the Tariff.
Edison states that it has served the filing on Hull and on the
Massachusetts Department of Public Utilities.
Edison requests a waiver of the Commission's notice requirements to
permit the Exhibit A to become effective as of the commencement date of
the transaction to which it relates, November 1, 1994.
Comment date: February 1, 1995, in accordance with Standard
Paragraph E at the end of this notice.
8. San Diego Gas & Electric Company
[Docket No. ER95-416-000]
Take notice that on January 12, 1995, San Diego Gas & Electric
Company (SDG&E), tendered for filing an Interchange Agreement
(Agreement) between SDG&E and Associated Power Services, Inc. (APSI).
SDG&E requests that the Commission allow the Agreement to become
effective on the 15th day of March, 1995 or at the earliest possible
date.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and APSI.
Comment date: February 1, 1995, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-1831 Filed 1-24-95; 8:45 am]
BILLING CODE 6717-01-P