99-1602. Yakima River Basin Water Enhancement Project, Yakima, WA, INT-FES 99-3  

  • [Federal Register Volume 64, Number 15 (Monday, January 25, 1999)]
    [Notices]
    [Page 3714]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-1602]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF THE INTERIOR
    
    Bureau of Reclamation
    
    
    Yakima River Basin Water Enhancement Project, Yakima, WA, INT-FES 
    99-3
    
    AGENCY: Bureau of Reclamation, Interior.
    
    ACTION: Notice of availability of final programmatic environmental 
    impact statement.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Pursuant to Section 102(2)(C) of the National Environmental 
    Policy Act of 1969, as amended, the Department of the Interior, Bureau 
    of Reclamation (Reclamation) has prepared a final programmatic 
    environmental impact statement (PEIS) for implementing provisions of 
    Phase 2 of the Yakima River Basin Water Enhancement Project 
    (Enhancement Project). The purpose of the Enhancement Project is to 
    meet the competing water needs of the Yakima River basin, including the 
    protection, mitigation, and enhancement of fish and wildlife resources 
    and improvement of the reliability of the water supply for irrigation, 
    through improved water conservation and management and other 
    appropriate means.
    
    DATES: A decision will not be made on the proposed action shall at 
    least 30 days after this notice of availability of the final PEIS is 
    published in the Federal Register. Soon after the 30-day waiting 
    period, Reclamation will complete a Record of Decision, identifying the 
    action that will be taken and discussing all factors leading to the 
    decision.
    
    ADDRESSES: A copy of the final PEIS may be obtained without charge from 
    the following location:
         Bureau of Reclamation, Upper Columbia Area Office, 1917 
    Marsh Road, Yakima, Washington 98907
    
    FOR FURTHER INFORMATION CONTACT: John Tiedeman, Environmental 
    Specialist, at the above address or at 509-575-5848.
    
    SUPPLEMENTARY INFORMATION: The final PEIS evaluates the effects of 
    Title XII of the Enhancement Project legislation. The provisions and 
    measures of the Enhancement Project legislation form the parameters and 
    the methods for achieving the protection, mitigation, and enhancement 
    of fish and wildlife through improved water management, instream flows, 
    water quality, the creation and enhancement of wetlands, and improved 
    reliability of irrigation water supplies. Central to this legislation 
    is the Yakima River Basin Water Conservation Program which attempts to 
    balance competing demands on the basin's water supply. This voluntary 
    program will reduce demands on the available water supply by promoting 
    conservation measures to improve the efficiency of water delivery and 
    use, instream flows for fish and wildlife, and the reliability of the 
    irrigation water supply.
        Specific measures that will be implemented depend upon proposals 
    contained in the water conservation plans, feasibility investigations 
    of measures selected for consideration, and program criteria. 
    Consequently, the final PEIS is a broad scope document to provide 
    ``umbrella'' coverage for implementing the Enhancement Project with 
    subsequent tiering for NEPA compliance of specific follow-on actions as 
    appropriate.
        Six alternatives, including no action, were evaluated in the final 
    PEIS. The no action alternative is presented as the most likely future 
    condition that could be expected without the implementation of 
    additional Title XII provisions beyond the currently established 
    riverflows, which includes the new operational criteria required by the 
    legislation. This alternative provided the basis for impact 
    comparisons. Five action alternatives presented the implementation of 
    all elements of the Enhancement Project at different levels of 
    implementation of project components. The preferred and environmentally 
    preferred alternative is Alternative 2A, which includes all provisions 
    of Title XII, and which would provide for the implementation of water 
    conservation measures throughout the basin, rather than concentrating 
    in specific areas.
        Beneficial impacts of the project are considered to be enhanced 
    water quality, increased streamflow, and overall reinforcement of fish 
    and wildlife habitat, as well as an increase in the reliability of 
    irrigation water supplies.
    
        Dated: January 7, 1999.
    Steven R. Clark,
    Acting Regional Director, Pacific Northwest Region.
    [FR Doc. 99-1602 Filed 1-22-99; 8:45 am]
    BILLING CODE 4310-94-M
    
    
    

Document Information

Published:
01/25/1999
Department:
Reclamation Bureau
Entry Type:
Notice
Action:
Notice of availability of final programmatic environmental impact statement.
Document Number:
99-1602
Dates:
A decision will not be made on the proposed action shall at least 30 days after this notice of availability of the final PEIS is published in the Federal Register. Soon after the 30-day waiting period, Reclamation will complete a Record of Decision, identifying the action that will be taken and discussing all factors leading to the decision.
Pages:
3714-3714 (1 pages)
PDF File:
99-1602.pdf