-
Start Preamble
Project No. FFP Project 10, LLC 12866-002 Northland Power Mississippi River LLC 14071-000 On January 17, 2012, the Commission held a drawing to determine priority Start Printed Page 3762among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants' plans are better adapted than the others to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows:
1. Northland Power Mississippi River LLC; Project No. 14071-000.
2. FFP Project 10, LLC; Project No. 12866-002.
Start SignatureDated: January 18, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-1417 Filed 1-24-12; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 01/25/2012
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2012-1417
- Pages:
- 3761-3762 (2 pages)
- PDF File:
- 2012-1417.pdf