Home »
1994 Issues »
59 FR (01/26/1994) » 94-1604. Final Finding of No Significant Impact and Intent To Terminate Source and Byproduct Material License SUA-1556 To Bingham Engineering, Salt Lake County, UT
94-1604. Final Finding of No Significant Impact and Intent To Terminate Source and Byproduct Material License SUA-1556 To Bingham Engineering, Salt Lake County, UT
[Federal Register Volume 59, Number 17 (Wednesday, January 26, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-1604]
[[Page Unknown]]
[Federal Register: January 26, 1994]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 40-9014]
Final Finding of No Significant Impact and Intent To Terminate
Source and Byproduct Material License SUA-1556 To Bingham Engineering,
Salt Lake County, UT
AGENCY: U.S. Nuclear Regulatory Commission.
ACTION: Notice of Final Finding of No Significant Impact and Intent to
Terminate Source and Byproduct Material License.
-----------------------------------------------------------------------
1. Proposed Action
The proposed administrative action is to terminate a source and
byproduct material license which will remove the NRC authorization for
Bingham Engineering to extract leachate solution from mill tailings for
purposes of clay liner testing.
2. Reasons for Final Finding of No Significant Impact
Bingham Engineering, holder of Source Material License SUA-1556
never received, held, or transferred byproduct material. The licensee's
proposed project for extraction of uranium mill tailings leachate was
never performed. Therefore, there was no impact to human health or the
environment as a consequence of release of radionuclides.
In accordance with 10 CFR 51.33(e), the Director, Uranium Recovery
Field Office, made the determination to issue a final finding of no
significant impact in the Federal Register. Concurrent with this
finding, NRC will terminate Source and Byproduct Material License SUA-
1556 which had authorized Bingham Engineering to receive and handle 25
kg of byproduct material.
This finding, together with documents setting forth the bases for
the finding, are available for public inspection and copying at the
Commission's Public Document Room at 2120 L Street, NW., Washington,
DC.
Dated at Denver, Colorado, this 13th day of January, 1994.
For the Nuclear Regulatory Commission.
Ramon E. Hall,
Director, Uranium Recovery Field Office.
[FR Doc. 94-1604 Filed 1-25-94; 8:45 am]
BILLING CODE 7590-01-M
Document Information
- Published:
- 01/26/1994
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Uncategorized Document
- Action:
- Notice of Final Finding of No Significant Impact and Intent to Terminate Source and Byproduct Material License.
- Document Number:
- 94-1604
- Pages:
- 0-0 (1 pages)
- Docket Numbers:
- Federal Register: January 26, 1994, Docket No. 40-9014