95-1937. Standard for Splicing Copper and Fiber Optic Cables  

  • [Federal Register Volume 60, Number 17 (Thursday, January 26, 1995)]
    [Rules and Regulations]
    [Pages 5096-5127]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-1937]
    
    
    
    -----------------------------------------------------------------------
    
    
    DEPARTMENT OF AGRICULTURE
    Rural Utilities Service
    
    7 CFR Part 1755
    
    
    Standard for Splicing Copper and Fiber Optic Cables
    
    AGENCY: Rural Utilities Service, USDA.
    
    ACTION: Final rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Rural Utilities Service (RUS) hereby amends its 
    regulations on telecommunications standards and specifications for 
    materials, equipment and construction. The revised standard will update 
    the splicing methods and materials used for splicing copper cables 
    brought about through technological advancements over the past fifteen 
    years and incorporate a section into the standard dealing with the 
    splicing methods and materials used to splice fiber optic cables.
    
    DATES: Effective date: February 27, 1995.
        Incorporation by reference: Incorporation by reference of certain 
    publications listed in this final rule is approved by the Director of 
    the Federal Register as of February 27, 1995.
    
    FOR FURTHER INFORMATION CONTACT: Garnett G. Adams, Chief, Outside Plant 
    Branch, Telecommunications Standards Division, Rural Utilities Service, 
    room 2844, South Building, U.S. Department of Agriculture, Washington, 
    DC 20250-1500, telephone (202) 720-0667.
    
    SUPPLEMENTARY INFORMATION:
    
    Executive Order 12866
    
        This final rule has been determined to be not significant for the 
    purposes of Executive Order 12866 and therefore has not been reviewed 
    by the Office of Management and Budget.
    
    Executive Order 12778
    
        This final rule has been reviewed under Executive Order 12778, 
    Civil Justice Reform. If adopted, this final rule will not:
        (1) Preempt any State or local laws, regulations, or policies;
        (2) Have any retroactive effect; and
        (3) Require administrative proceedings before parties may file suit 
    challenging the provisions of this rule.
    
    Regulatory Flexibility Act Certification
    
        The Administrator of RUS has determined that this final rule will 
    not have a significant economic impact on a substantial number of small 
    entities, as defined by the Regulatory Flexibility Act (5 U.S.C. 601 et 
    seq.). This final rule involves standards and specifications, which may 
    increase the direct short term costs to RUS borrowers. However, the 
    long-term direct economic costs are reduced through greater durability 
    and lower maintenance cost over time.
    
    Information Collection and Recordkeeping Requirements
    
        This final rule contains no information collection or recordkeeping 
    requirements under the Paperwork Reduction Act of 1980 (Pub. L. 96-
    511).
    
    National Environmental Policy Act Certification
    
        The Administrator of RUS has determined that this final rule will 
    not significantly affect the quality of the human environment as 
    defined by the National Environmental Policy Act of 1969 (42 U.S.C. 
    4321 et seq.). Therefore, this action does not require an environmental 
    impact statement or assessment.
    
    Catalog of Federal Domestic Assistance
    
        The program described by this final rule is listed in the Catalog 
    of Federal Domestic Assistance programs under No. 10.851, Rural 
    Telephone Loans and Loan Guarantees, and No. 10.582, Rural Telephone 
    Bank Loans. This catalog is available on a subscription basis from the 
    Superintendent of Documents, the United States Government Printing 
    Office, Washington, DC 20402.
    
    Executive Order 12372
    
        This final rule is excluded from the scope of Executive Order 
    12372, Intergovernmental Consultation that requires intergovernmental 
    consultation with state and local officials. A Notice of Final Rule 
    titled Department Programs and Activities Excluded from Executive Order 
    12372 (50 FR 47034) exempts RUS and RTB loans and loan guarantees, and 
    RTB bank loans, to governmental and nongovernmental entities from 
    coverage under this Order.
    
    Background
    
        RUS issues publications titled ``Bulletin'' which serve to guide 
    borrowers regarding already codified policy, procedures, and 
    requirements needed to manage loans, loan guarantee programs, and the 
    security instruments which provide for and secure RUS financing. RUS 
    issues standards and specifications for the construction of telephone 
    facilities financed with RUS loan funds. RUS is rescinding Bulletin 
    345-6, RUS Standard for Splicing Plastic-Insulated Cables, PC-2, and 
    codifying the revised standard at 7 CFR 1755.200, RUS Standard for 
    Splicing Copper and Fiber Optic Cables.
        RUS Bulletin 345-6 is used by borrowers and contractors as an 
    outside plant construction standard for splicing copper cables 
    installed in aerial and buried splice closures, ready-access 
    enclosures, and buried plant housings. Because of technological 
    advancements made in copper cable splicing methods and materials over 
    the past fifteen years, the current splicing methods and materials 
    relating to copper cables specified in the current standard have become 
    outdated. To allow borrowers and contractors to take advantage of these 
    improved methods and materials which will reduce installation costs, 
    the current standard will be revised to update the copper cable 
    splicing methods and materials to reflect these improved methods and 
    materials. [[Page 5097]] 
        The current standard does not include splicing methods and 
    materials used for fiber optic cables because at the time the standard 
    was written no such methods and materials were addressed because RUS 
    borrowers were providing telecommunication services to subscribers only 
    over copper cables. Since that time RUS borrowers have been providing 
    telecommunication services to subscribers over both copper and fiber 
    optic cables. Since RUS borrowers are installing fiber optic cables to 
    provide subscriber services, the current standard needs to be revised 
    to provide borrowers and contractors with standardized splicing methods 
    and materials for fiber optic cables.
        This action will allow borrowers and contractors an economical and 
    efficient means of reducing their construction costs through the use of 
    improved splicing techniques for copper cables and standardized 
    splicing methods for fiber optic cables.
        On August 29, 1994, RUS published a proposed rule (59 FR 44347) to 
    rescind RUS Bulletin 345-6, RUS Standard for Splicing Plastic-Insulated 
    Cables, PC-2, and to codify the revised standard at 7 CFR 1755.200, RUS 
    Standard for Splicing Copper and Fiber Optic Cables. Comments on this 
    proposed rule were due by October 28, 1994. No comments were received 
    by this due date.
        Although no comments were received from any outside party on the 
    proposed rule, RUS, upon review of the proposed rule, discovered that 
    paragraph (e)(8) which makes reference to paragraphs (g)(4), (g)(5)(i), 
    (g)(5)(ii), and (g)(5)(iv) should be changed to reference paragraphs 
    (g)(4), and (g)(5)(i) through (g)(5)(iii) because paragraph (g)(5)(iv) 
    did not exist in the proposed rule. Therefore RUS will change the 
    paragraph (e)(8) to make reference to paragraphs (g)(4), and (g)(5)(i) 
    through (g)(5)(iii). This change will not result in any change in the 
    technical requirements of paragraph (e)(8).
    
    List of Subjects in 7 CFR Part 1755
    
        Incorporation by reference, Loan programs--communications, Rural 
    areas, Telephone.
    
        For reasons set out in the preamble, RUS amends chapter XVII of 
    title 7 of the Code of Federal Regulations as follows:
    
    PART 1755--TELECOMMUNICATIONS STANDARDS AND SPECIFICATIONS FOR 
    MATERIALS, EQUIPMENT AND CONSTRUCTION
    
        1. The authority citation for part 1755 continues to read as 
    follows:
    
        Authority: 7 U.S.C. 901 et seq., 1921 et seq.
    
    
    Sec. 1755.97  [Amended]
    
        2. Section 1755.97 is amended by removing the entry for RUS 
    Bulletin 345-6 from the table.
        3. Section 1755.98 is amended by adding a new entry to the table in 
    numerical order to read as follows:
    
    
    Sec. 1755.98  List of telephone standards and specifications included 
    in other 7 CFR parts.
    
    * * * * *
    
    ------------------------------------------------------------------------
       Section         Issue date                      Title                
    ------------------------------------------------------------------------
    1755.200.....  Jan. 26, 1995.....  RUS Standard for Splicing Copper and 
                                        Fiber Optic Cables.                 
                                                                            
                                                                            
                      *        *        *        *        *                 
    ------------------------------------------------------------------------
    
        4. Section 1755.200 is added to read as follows:
    
    
    Sec. 1755.200  RUS standard for splicing copper and fiber optic cables.
    
        (a) Scope. (1) This section describes approved methods for splicing 
    plastic insulated copper and fiber optic cables. Typical applications 
    of these methods include aerial, buried, and underground splices.
        (2) American National Standard Institute/National Fire Protection 
    Association (ANSI/NFPA) 70, 1993 National Electrical Code (NEC) 
    referenced in this section is incorporated by reference by RUS. This 
    incorporation by reference was approved by the Director of the Federal 
    Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. A copy 
    of the ANSI/NFPA 1993 NEC standard is available for inspection during 
    normal business hours at RUS, room 2845, U.S. Department of 
    Agriculture, Washington, DC 20250-1500 or at the Office of the Federal 
    Register, 800 North Capitol Street, NW., suite 700, Washington, DC. 
    Copies are available from NFPA, Batterymarch Park, Quincy, 
    Massachusetts 02269, telephone number 1 (800) 344-3555.
        (3) American National Standard Institute/Institute of Electrical 
    and Electronics Engineers, Inc. (ANSI/IEEE), 1993 National Electrical 
    Safety Code (NESC) referenced in this section is incorporated by 
    reference by RUS. This incorporation by reference was approved by the 
    Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 
    1 CFR part 51. A copy of the ANSI/IEEE 1993 NESC standard is available 
    for inspection during normal business hours at RUS, room 2845, U.S. 
    Department of Agriculture, Washington, DC 20250-1500 or at the Office 
    of the Federal Register, 800 North Capitol Street, NW., suite 700, 
    Washington, DC. Copies are available from IEEE Service Center, 455 Hoes 
    Lane, Piscataway, New Jersey 08854, telephone number 1 (800) 678-4333.
        (b) General. (1) Only Rural Utilities Service (RUS) accepted filled 
    cable and splicing materials shall be used on outside plant projects 
    financed by RUS.
        (2) The installation instructions provided by the manufacturer of 
    splicing materials shall be followed except where those instructions 
    conflict with the procedures specified in this section.
        (3) Precautions shall be taken to prevent the ingress of moisture 
    and other contaminants during all phases of the splicing installation. 
    When an uncompleted splice must be left unattended, it shall be sealed 
    to prevent the ingress of moisture and other contaminants.
        (4) Minor sheath damage during construction may be repaired if the 
    repair is completed immediately and approved by the borrower's resident 
    project representative. Minor damage is typically repaired by:
        (i) Scuffing the cable sheath associated with the damaged area;
        (ii) Applying several layers of DR tape over the scuffed and 
    damaged area;
        (iii) Applying several layers of plastic tape over the DR tape; and
        (iv) If damage is severe enough to rupture the cable shield, a 
    splice closure shall be installed.
        (5) All splice cases installed on RUS toll trunk and feeder cables 
    shall be filled, whether aerial, buried, or underground.
        (c) Splicing considerations for copper cables--(1) Preconstruction 
    testing. It is desirable that each reel of cable be tested for grounds, 
    opens, shorts, crosses, and shield continuity before the cable is 
    installed. However, manufacturer supplied test results are acceptable. 
    All cable pairs shall be free from electrical defects.
        (2) Handling precautions. The cable manufacturer's instructions 
    concerning pulling tension and bending radius shall be observed. Unless 
    the cable manufacturer's recommendation is more stringent, the minimum 
    bending radius shall be 10 times the cable diameter for copper cables 
    and 20 times the cable diameter for fiber optic cables.
        (3) Cable sheath removal. (i) The length of cable sheath to be 
    removed shall be governed by the type of splicing hardware used. Follow 
    the splice case manufacturer's recommendations. For pedestals or large 
    pair count splice housings, consider removing enough cable sheath to 
    allow the conductors to [[Page 5098]] extend to the top of the pedestal 
    and then to hang downward to approximately 15 centimeters (cm) (6 
    inches (in.)) above the baseplate.
        (ii) Caution shall be exercised to avoid damaging the conductor 
    insulation when cutting through the cable shield and removing the 
    shield. Sharp edges and burrs shall be removed from the cut end of the 
    shield.
        (4) Shield bonding and grounding. For personnel safety, the shields 
    of the cables to be spliced shall be bonded together and grounded 
    before splicing activities are started. (See paragraphs (g)(2), and 
    (g)(5)(i) through (g)(5)(iii) of this section for final bonding and 
    grounding provisions.)
        (5) Binder group identification. (i) Color coded plastic tie wraps 
    shall be placed loosely around each binder group of cables before 
    splicing operations are attempted. The tie wraps shall be installed as 
    near the cable sheath as practicable and shall conform to the same 
    color designations as the binder ribbons. Twisted wire pigtails shall 
    not be used to identify binder groups due to potential transmission 
    degradation.
        (ii) The standard insulation color code used to identify individual 
    cable pairs within 25-pair binder groups shall be as shown in Table 1:
    
            Table 1.--Cable Pair Identification Within Binder Groups        
    ------------------------------------------------------------------------
                                                              Color         
                       Pair No.                    -------------------------
                                                         Tip         Ring   
    ------------------------------------------------------------------------
    1.............................................  White.......  Blue.     
    2.............................................  White.......  Orange.   
    3.............................................  White.......  Green.    
    4.............................................  White.......  Brown.    
    5.............................................  White.......  Slate.    
    6.............................................  Red.........  Blue.     
    7.............................................  Red.........  Orange.   
    8.............................................  Red.........  Green.    
    9.............................................  Red.........  Brown.    
    10............................................  Red.........  Slate.    
    11............................................  Black.......  Blue.     
    12............................................  Black.......  Orange.   
    13............................................  Black.......  Green.    
    14............................................  Black.......  Brown.    
    15............................................  Black.......  Slate.    
    16............................................  Yellow......  Blue.     
    17............................................  Yellow......  Orange.   
    18............................................  Yellow......  Green.    
    19............................................  Yellow......  Brown.    
    20............................................  Yellow......  Slate.    
    21............................................  Violet......  Blue.     
    22............................................  Violet......  Orange.   
    23............................................  Violet......  Green.    
    24............................................  Violet......  Brown.    
    25............................................  Violet......  Slate.    
    ------------------------------------------------------------------------
    
        (iii) The standard binder ribbon color code used to designate 25-
    pair binder groups within 600-pair super units shall be as shown in 
    Table 2:
    
                   Table 2.--Cable Binder Group Identification              
    ------------------------------------------------------------------------
                                                                  Group pair
                   Group No.                  Color of bindings      count  
    ------------------------------------------------------------------------
    1.....................................  White-Blue..........    1-25    
    2.....................................  White-Orange........   26-50    
    3.....................................  White-Green.........   51-75    
    4.....................................  White-Brown.........  76-100    
    5.....................................  White-Slate.........  101-125   
    6.....................................  Red-Blue............  126-150   
    7.....................................  Red-Orange..........  151-175   
    8.....................................  Red-Green...........  176-200   
    9.....................................  Red-Brown...........  201-225   
    10....................................  Red-Slate...........  226-250   
    11....................................  Black-Blue..........  251-275   
    12....................................  Black-Orange........  276-300   
    13....................................  Black-Green.........  301-325   
    14....................................  Black-Brown.........  326-350   
    15....................................  Black-Slate.........  351-375   
    16....................................  Yellow-Blue.........  376-400   
    17....................................  Yellow-Orange.......  401-425   
    18....................................  Yellow-Green........  426-450   
    19....................................  Yellow-Brown........  451-475   
    20....................................  Yellow-Slate........  476-500   
    21....................................  Violet-Blue.........  501-525   
    22....................................  Violet-Orange.......  526-550   
    23....................................  Violet-Green........  551-575   
    24....................................  Violet-Brown........  576-600   
    ------------------------------------------------------------------------
    
        (iv) Super-unit binder groups shall be identified in accordance 
    with Table 3:
    
                       Table 3.--Super-Unit Binder Colors                   
    ------------------------------------------------------------------------
                           Pair numbers                         Binder color
    ------------------------------------------------------------------------
    1-600.....................................................  White.      
    601-1200..................................................  Red.        
    1201-1800.................................................  Black.      
    1801-2400.................................................  Yellow.     
    2401-3000.................................................  Violet.     
    3001-3600.................................................  Blue.       
    3601-4200.................................................  Orange.     
    4201-4800.................................................  Green.      
    4801-5400.................................................  Brown.      
    5401-6000.................................................  Slate.      
    ------------------------------------------------------------------------
    
        (v) Service pairs in screened cables shall be identified in 
    accordance with Table 4:
    
              Table 4.--Screened Cable Service Pair Identification          
    ------------------------------------------------------------------------
                                                              Color         
                   Service pair No.                -------------------------
                                                         Tip         Ring   
    ------------------------------------------------------------------------
    1.............................................  White.......  Red.      
    2.............................................  White.......  Black.    
    3.............................................  White.......  Yellow.   
    4.............................................  White.......  Violet.   
    5.............................................  Red.........  Black.    
    6.............................................  Red.........  Yellow.   
    7.............................................  Red.........  Violet.   
    8.............................................  Black.......  Yellow.   
    9.............................................  Black.......  Violet.   
    ------------------------------------------------------------------------
    
        (6) Cleaning conductors. It is not necessary to remove the filling 
    compound from cable conductors before splicing. However, it is 
    permissible to wipe individual conductors with clean paper towels or 
    clean cloth rags. No cleaning chemicals, etc., shall be used. Caution 
    shall be exercised to maintain individual cable pair and binder group 
    identity. Binder group identity shall be maintained by using color 
    coded plastic tie wraps. Individual pair identification shall be 
    maintained by carefully twisting together the two conductors of each 
    pair.
        (7) Expanded plastic insulated conductor (PIC) precautions. Solid 
    PIC and expanded (foam or foam skin) PIC are spliced in the same 
    manner, using the same tools and materials and, in general, should be 
    treated the same. However, the insulation on expanded PIC is much more 
    fragile than solid PIC. Twisting or forming expanded PIC into extremely 
    compact splice bundles and applying excessive amounts of tension when 
    tightening tie wraps causes shiners and, thus shall be avoided.
        (8) Splice connectors. (i) Only RUS accepted filled splice 
    connectors shall be used on outside plant projects financed by RUS.
        (ii) Specialized connectors are available for splicing operations 
    such as butt splices, in line splices, bridge taps, clearing and 
    capping, and multiple pair splicing operations. The splice connector 
    manufacturer's recommendations shall be followed concerning connector 
    selection and use.
        (iii) Caution shall be exercised to maintain conductor and pair 
    association both during and after splicing operations.
        (iv) Splicing operations that involve pairs containing working 
    services shall utilize splice connectors that permit splicing without 
    the interruption of service.
        (9) Piecing out conductors. Conductors may be pieced-out to provide 
    additional slack or to repair damaged conductors. However, the 
    conductors shall be pieced-out with conductors having the same gauge 
    and type and color of insulation. The conductors used for piecing-out 
    shall be from cables having RUS acceptance.
        (10) Splice organization. Spliced pair bundles shall be arranged in 
    firm lay-ups with minimum conductor tension in accordance with the 
    manufacturer's instructions.
        (11) Binder tape. Perforated nonhygroscopic and nonwicking binder 
    tape should be applied to splices housed in filled splice cases. The 
    binder tape allows the flow of filling compound while holding the 
    splice bundles near the center of the splice case to allow adequate 
    coverage of filling compound. [[Page 5099]] 
        (12) Cable tags. Cables shall be identified by a tag indicating the 
    cable manufacturer's name, cable size, date of placement, and generic 
    route information. Information susceptible to changes caused by future 
    cable throws and rearrangements should not be included. Tags on load 
    coil stubs shall include the serial number of the coil case, the 
    manufacturer's name, and the inductance value.
        (13) Screened cable. Screened PIC cable is spliced in the same 
    manner as nonscreened PIC cable. However, special considerations are 
    necessary due to differences in the cable design. The transmit and 
    receive bundles of the cable shall be separated and one of the bundles 
    shall be wrapped with shielding material in accordance with the cable 
    manufacturer's recommendations. When acceptable to the cable 
    manufacturer, it is permissible to use either the scrap screening tape 
    removed from the cable during the sheath opening process provided the 
    screening tape is edge coated or new pressure sensitive aluminum foil 
    tape over polyethylene tape.
        (14) Service wire connections. (i) Buried service wires may be 
    spliced directly to cable conductors inside pedestals using the same 
    techniques required for branch cables. Buried service wires may also be 
    terminated on terminal blocks inside pedestals in areas where high 
    service order activity or fixed count cable administration policies 
    require terminal blocks. However, only RUS accepted terminal blocks 
    equipped with grease or gel filled terminations to provide moisture and 
    corrosion resistance shall be used.
        (ii) Only filled terminal blocks having RUS acceptance shall be 
    used on aerial service wire connections.
        (15) Copper cable testing. Copper cable testing shall be performed 
    in accordance with RUS Bulletin 345-63, ``RUS Standard for Acceptance 
    Tests and Measurements of Telephone Plant,'' PC-4, (Incorporated by 
    reference at Sec. 1755.97).
        (16) Cable acceptance. Installed cable shall be tested and pass the 
    inventory and acceptance testing specified in the Telephone System 
    Construction Contract (Labor and Materials), RUS Form 515. The tests 
    and inspections shall be witnessed by the borrower's resident project 
    representative. All conductors shall be free from grounds, shorts, 
    crosses, splits, and opens.
        (d) Splice arrangements for copper cables--(1) Service distribution 
    closures. (i) Ready access closures permit cable splicing activities 
    and the installation of filled terminal blocks for service wire 
    connections in the same closure. Ready access designs shall allow 
    service technicians direct access to the cable core as well as the 
    terminal block.
        (ii) Fixed count terminals shall restrict service technician access 
    to the cable core. Predetermined cable pairs shall be spliced to the 
    terminal leads or stub cable in advance of service assignments.
        (2) Aerial splices. Aerial splice cases accommodate straight 
    splices, branch splices, load coils, and service distribution 
    terminals. Aerial splicing arrangements having more than 4 cables 
    spliced in the same splice case are not recommended. Stub cabling to a 
    second splice case to avoid a congested splice is acceptable.
        (3) Buried splices. (i) Direct buried splice cases accommodate 
    straight splices, branch splices, and load coils. Direct buried splices 
    shall be filled and shall be used only when above ground splicing in 
    pedestals is not practicable.
        (ii) A treated plank or equivalent shall be placed 15 cm (6 in.) 
    above the buried splice case to prevent damage to the splice case from 
    future digging. Where a firm base for burying a splice cannot be 
    obtained, a treated plank or equivalent shall be placed beneath the 
    splice case.
        (iii) Each buried splice shall be identified for future locating. 
    One method of marking the splice point is the use of a warning sign. 
    Another method is the burying of an electronic locating device.
        (4) BD-type pedestals. (i) BD-type pedestals are housings primarily 
    intended to house, organize, and protect cable terminations 
    incorporating splice connectors, ground lugs, and load coils. 
    Activities typically performed in pedestals are cable splicing, shield 
    bonding and grounding, loading, and connection of subscriber service 
    drops.
        (ii) The recommended splice capacities for BD-type pedestals are 
    shown in Table 5. However, larger size pedestals are permissible if 
    service requirements dictate their usefulness. Table 5 is as follows:
    
                Table 5.--Splice Capacities for BD-Type Pedestals           
    ------------------------------------------------------------------------
                                                                Maximum load
                                             Maximum straight   splice pair 
                                              splice maximum      capacity  
                                             load splice pair   using single
                                              capacity using        pair    
                 Pedestal type                  single pair    connectors or
                                               connectors or   multiple pair
                                               multiple pair       splice   
                                              splice modules    modules (see
                                                                  note 1)   
    ------------------------------------------------------------------------
    BD3, BD3A..............................  100 Pair........  50 Pair.     
    BD4, BD4A..............................  200 Pair........  100 Pair.    
    BD5, BD5A..............................  600 Pair........  300 Pair.    
    BD7....................................  1200 Pair.......  600 Pair.    
    BD14, BD14A............................  100 Pair........  50 Pair.     
    BD15, BD15A............................  400 Pair........  200 Pair.    
    BD16, BD16A............................  600 Pair........  300 Pair.    
    ------------------------------------------------------------------------
    Note 1: This table refers to load coil cases that are to be direct      
      buried with stub cables extending into the pedestal for splicing.     
      Requirements involving individual coil arrangements inside the        
      pedestal should be engineered on a case-by-case basis.                
    
        (iii) Special distribution pedestals having a divider plate for 
    mounting filled terminal blocks are available. Distribution pedestals 
    are also equipped with service wire channels for installation of buried 
    service wires without disturbing the cabling and gravel inside the base 
    of the pedestal. Distribution pedestals are recommended in locations 
    where the connection of service wires is required.
        (5) Large pair count splice housings. Large pair count splice 
    housings are recommended for areas not suitable for man- holes. The 
    recommended capacities are shown in Table 6:
    
              Table 6.--Splice Capacities for Large Count Housings          
    ------------------------------------------------------------------------
                                                              Maximum load  
                                        Maximum straight       splice pair  
                                      splice pair capacity   capacity using 
                                        using single pair      single pair  
              Housing type                connectors or       connectors or 
                                      multiple pair splice    multiple pair 
                                             modules         splice modules 
                                                              (see note 1)  
    ------------------------------------------------------------------------
    BD 6000.........................  6,000 Pair..........  3,000 Pair.     
    BD 8000.........................  8,000 Pair..........  4,000 Pair.     
    BD 10000........................  10,000 Pair.........  5,000 Pair.     
    ------------------------------------------------------------------------
    
        (6) Pedestal restricted access inserts. Restricted access inserts 
    may be used to protect splices susceptible to unnecessary handling 
    where subsequent work activities are required or expected to occur 
    after splices have been completed. Restricted access inserts also 
    provide moisture protection in areas susceptible to temporary flooding. 
    A [[Page 5100]] typical restricted access insert is shown in Figure 1:
    
    BILLING CODE 3410-15-P
    [GRAPHIC][TIFF OMITTED]TR26JA95.002
    
    
    
    BILLING CODE 3410-15-C [[Page 5101]] 
        (7) Serving Area Interface (SAI) Systems. SAI systems provide the 
    cross-connect point between feeder and distribution cables. Connection 
    of feeder to distribution pairs is accomplished by placing jumpers 
    between connecting blocks. Only RUS accepted connecting blocks having 
    grease or gel filled terminations to provide moisture and corrosion 
    resistance shall be used.
        (8) Buried cable splicing arrangements. Typical buried cable 
    splicing arrangements are illustrated in Figures 2 through 5:
    
    BILLING CODE 3410-15-P
                                                                           
        [[Page 5102]]
        
    [GRAPHIC][TIFF OMITTED]TR26JA95.003
    
    
    [[Page 5103]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.004
    
    
    [[Page 5104]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.005
    
    
    [[Page 5105]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.006
    
    
    
    BILLING CODE 3410-15-C
    [[Page 5106]]
    
        (9) Underground splices (manholes). Underground splice cases 
    accommodate straight splices, branch splices, and load coils. 
    Underground splices shall be filled.
        (10) Central office tip cable splices. (i) Filled cable or filled 
    splices are not recommended for use inside central offices, except in 
    cable vault locations. Outside plant cable sheath and cable filling 
    compound are susceptible to fire and will support combustion. Fire, 
    smoke, and gases generated by these materials during burning are 
    detrimental to telephone switching equipment.
        (ii) Tip cables should be spliced in a cable vault. However, as a 
    last resort, tip cables may be spliced inside a central office if flame 
    retardant splice cases or a noncombustible central office splice 
    housing is used to contain the splice.
        (iii) Splices inside the central office shall be made as close as 
    practical to the point where the outside plant cables enter the 
    building. Except in cable vault locations, outside plant cables within 
    the central office shall be wrapped with fireproof tape or enclosed in 
    noncombustible conduit.
        (e) Splicing considerations for fiber optic cables--(1) Connection 
    characteristics. Splicing efficiency between optical fibers is a 
    function of light loss across the fiber junctions measured in decibels 
    (dB). A loss of 0.2 dB in a splice corresponds to a light transmission 
    efficiency of approximately 95.5 percent.
        (2) Fiber core alignment. Fiber splicing techniques shall be 
    conducted in such a manner that the cores of the fibers will be aligned 
    as perfectly as possible to allow maximum light transmission from one 
    fiber to the next. Without proper alignment, light will leave the fiber 
    core and travel through the fiber cladding. Light outside the fiber 
    core is not a usable light signal. Core misalignment is illustrated in 
    Figure 6:
    
    BILLING CODE 3410-15-P
    [GRAPHIC][TIFF OMITTED]TR26JA95.007
    
    
    
    BILLING CODE 3410-15-C
    [[Page 5107]]
    
        (3) Splice loss. (i) Splice loss can also be caused by fiber 
    defects such as nonidentical core diameters, cores not in center of the 
    fiber, and noncircular cores. Such defects are depicted in Figure 7:
    
                                                     BILLING CODE 3410-15-P
    [[Page 5108]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.008
    
    
    BILLING CODE 3410-15-C
    [[Page 5109]]
    
        (ii) Undesirable splice losses are caused by poor splicing 
    techniques including splicing irregularities such as improper cleaves 
    and dirty splices. Typical cleave problems are illustrated in Figure 8:
    
    BILLING CODE 3410-15-P
    [GRAPHIC][TIFF OMITTED]TR26JA95.009
    
    
    BILLING CODE 3410-15-C [[Page 5110]] 
        (4) Handling precautions. The following precautions shall be 
    observed:
        (i) Avoid damaging the cable during handling operations prior to 
    splicing. Minor damage may change the transmission characteristics of 
    the fibers to the extent that the cable section will have to be 
    replaced;
        (ii) The cable manufacturer's recommendations concerning pulling 
    tension shall be observed. The maximum pulling tension for most fiber 
    optic cable is 2669 newtons (600 pound-force);
        (iii) The cable manufacturer's recommendations concerning bending 
    radius shall be observed. Unless the cable manufacturer's 
    recommendation is more stringent, the minimum bending radius for fiber 
    optic cable shall be 20 times the cable diameter;
        (iv) The cable manufacturer's recommendations concerning buffer 
    tube bending radius shall be observed. Unless the cable manufacturer's 
    recommendation is more stringent, the minimum bending radius for buffer 
    tubes is usually between 38 millimeters (mm) (1.5 in.) and 76 mm (3.0 
    in.). The bending limitations on buffer tubes are intended to prevent 
    kinking. Buffer tube kinking may cause excessive optical loss or fiber 
    breakage; and
        (v) Handle unprotected glass fibers carefully to avoid introducing 
    flaws such as scratched or broken fibers.
        (5) Personnel safety. The following safety precautions shall be 
    observed:
        (i) Safety glasses shall be worn when handling glass fibers;
        (ii) Never view open-ended fibers with the naked eye or a 
    magnifying device. Improper viewing of a fiber end that is transmitting 
    light may cause irreparable eye damage; and
        (iii) Dispose of bare scrap fibers by using the sticky side of a 
    piece of tape to pick up and discard loose fiber ends. Fiber scraps 
    easily penetrate the skin and are difficult to remove.
        (6) Equipment requirements. (i) Fiber optic splices shall be made 
    in areas where temperature, humidity, and cleanliness can be 
    controlled. Both fusion and mechanical splicing techniques may require 
    a splicing vehicle equipped with a work station that will allow 
    environmental control.
        (ii) Both fusion and mechanical splicing techniques are permitted 
    on RUS financed projects. When using the mechanical splicing technique, 
    only RUS accepted mechanical fiber optic splice connectors can be used.
        (iii) Fusion splicing machines shall be kept in proper working 
    condition. Regular maintenance in accordance with the machine 
    manufacturer's recommendations shall be observed.
        (iv) Mechanical splicing tools shall be in conformance with the 
    tool manufacturer's recommendations.
        (v) An optical time domain reflectometer (OTDR) shall be used for 
    testing splices. The OTDR shall be stationed at the central office or 
    launch point for testing individual splices as they are made and for 
    end-to-end signature tests for the fiber optic link.
        (vi) An optical power meter shall be used for end-to-end cable 
    acceptance tests.
        (vii) A prerequisite for the successful completion of a fiber optic 
    splicing endeavor is the presence of a talk circuit between the 
    splicing technician in the splicing vehicle and the operator of the 
    OTDR in the central office. The splicing technician and the OTDR 
    operator shall have access to communications with each other in order 
    to inform each other as to:
        (A) Which splices meet the loss objectives;
        (B) The sequence in which buffer tubes and fibers are to be 
    selected for subsequent splicing operations; and
        (C) The timing required for the performance of OTDR testing to 
    prevent making an OTDR test at the same time a splice is being fused.
        (7) Cable preparation. (i) Engineering work prints shall prescribe 
    the cable slack needed at splice points to reach the work station 
    inside the splicing vehicle. Consideration should be given to the slack 
    required for future maintenance activity as well as initial 
    construction activities. The required slack may be different for each 
    splice point, depending on the site logistics. However, the required 
    slack is seldom less than 15 meters (50 feet). The amount of slack 
    actually used shall be recorded for each splice point to assist future 
    maintenance and restoration efforts.
        (ii) The splice case manufacturer's recommendations concerning the 
    amount of cable sheath to be removed shall be followed to facilitate 
    splicing operations. The length of the sheath opening shall be 
    identified with a wrap of plastic tape.
        (iii) If the cable contains a rip cord, the cable jacket shall be 
    ring cut approximately 15 cm (6 in.) from the end and the 15 cm (6 in.) 
    of cable jacket shall be removed to expose the rip cord. The rip cord 
    shall be used to slit the jacket to the tape mark.
        (iv) If the cable does not contain a rip cord, the cable jacket 
    shall be slit using a sheath splitter. No cuts shall be made into the 
    cable core nor shall the buffer tubes be damaged.
        (v) If the cable contains an armor sheath, the outer jacket shall 
    be opened along the slit and the jacket shall be removed exposing the 
    armor sheath. The armor shall be separated at the seam and pulled from 
    the cable exposing the inner jacket. The armor shall be removed making 
    allowances for a shield bond connector. The inner sheath shall be slit 
    using a sheath splitter or rip cord. The cable core shall not be 
    damaged nor shall there be any damage to the buffer tubes. The jacket 
    shall be peeled back and cut at the end of the slit. The exposed buffer 
    tubes shall not be cut, kinked, or bent.
        (vi) After the cable sheath has been removed, the binder tape shall 
    be removed from the cable. The cable shall not be crushed or deformed.
        (vii) The buffer tubes shall be unstranded one at a time. The 
    buffer tubes shall not be kinked.
        (viii) If the cable is equipped with a strength member, the 
    strength member shall be cut to the length recommended by the splice 
    case manufacturer.
        (ix) Each buffer tube shall be inspected for kinks, cuts, and flat 
    spots. If damage is detected, an additional length of cable jacket 
    shall be removed and all of the buffer tubes shall be cut off at the 
    point of damage.
        (x) The cable preparation sequence shall be repeated for the other 
    cable end.
        (8) Shield bonding and grounding. For personnel safety, the shields 
    and metallic strength members of the cables to be spliced shall be 
    bonded together and grounded before splicing activities are started. 
    (See paragraphs (g)(4), and (g)(5)(i) through (g)(5)(iii) of this 
    section for final bonding and grounding provisions).
        (9) Fiber optic color code. The standard fiber optic color code for 
    buffer tubes and individual fibers shall be as shown in Table 7:
    
                 Table 7.--Fiber and Buffer Tube Identification             
    ------------------------------------------------------------------------
             Buffer tube and fiber No.                      Color           
    ------------------------------------------------------------------------
     1........................................  Blue.                       
     2........................................  Orange.                     
     3........................................  Green.                      
     4........................................  Brown.                      
     5........................................  Slate.                      
     6........................................  White.                      
     7........................................  Red.                        
     8........................................  Black.                      
     9........................................  Yellow.                     
    10........................................  Violet.                     
    11........................................  Rose.                       
    12........................................  Aqua.                       
    13........................................  Blue/Black Tracer.          
    14........................................  Orange/Black Tracer.        
    15........................................  Green/Black Tracer.         
    16........................................  Brown/Black Tracer.         
    17........................................  Slate/Black Tracer.         
    18........................................  White/Black Tracer.         
    [[Page 5111]]                                                           
                                                                            
    19........................................  Red/Black Tracer.           
    20........................................  Black/Yellow Tracer.        
    21........................................  Yellow/Black Tracer.        
    22........................................  Violet/Black Tracer.        
    23........................................  Rose/Black Tracer.          
    24........................................  Aqua/Black Tracer.          
    ------------------------------------------------------------------------
    
        (10) Buffer tube removal. (i) The splice case manufacturer's 
    recommendation shall be followed concerning the total length of buffer 
    tube to be removed. Identify the length to be removed with plastic 
    tape.
        (ii) Experiment with a scrap buffer tube to determine the cutting 
    tool adjustment required to ring cut a buffer tube without damaging the 
    fibers.
        (iii) Buffer tubes shall be removed by carefully ring cutting and 
    removing approximately 15 to 46 cm (6 to 18 in.) of buffer tube at a 
    time. The process shall be repeated until the required length of buffer 
    tube has been removed, including the tape identification marker.
        (11) Coated fiber cleaning. (i) Each coated fiber shall be cleaned. 
    The cable manufacturer's recommendations shall be followed concerning 
    the solvent required to clean the coated fibers. Reagent grade 
    isopropyl alcohol is a commonly used cleaning solvent.
        (ii) A tissue or cotton ball shall be soaked in the recommended 
    cleaning solvent and the coated fibers shall be carefully wiped one at 
    a time using a clean tissue or cotton ball for each coated fiber. 
    Caution shall be exercised to avoid removing the coloring agent from 
    the fiber coating.
        (12) Fiber coating removal. (i) Fiber coatings shall be removed. In 
    accordance with the splicing method used, the splice case 
    manufacturer's recommendation shall be followed concerning the length 
    of fiber coating to be removed.
        (ii) The recommended length of fiber coating shall be removed only 
    on the two fibers to be spliced. Fiber coating removal shall be 
    performed on a one-fiber-at-a-time basis as each splice is prepared.
        (13) Bare fiber cleaning. After the fiber coating has been removed, 
    the bare fibers shall be cleaned prior to splicing. Each fiber shall be 
    wiped with a clean tissue or cotton ball soaked with the cleaning 
    solvent recommended by the cable manufacturer. The bare fiber shall be 
    wiped one time to minimize fiber damage. Aggressive wiping of bare 
    fiber shall be avoided as it lowers the fiber tensile strength.
        (14) Fiber cleaving. Cleaving tools shall be clean and have sharp 
    cutting edges to minimize fiber scratches and improper cleave angles. 
    Cleaving tools that are recommended by the manufacturer of the splicing 
    system shall be used.
        (15) Cleaved fiber handling. The cleaved and cleaned fiber shall 
    not be allowed to touch other objects and shall be inserted into the 
    splicing device.
        (16) Completion of the splice. (i) In accordance with the method of 
    splicing selected by the borrower, the splice shall be completed by 
    either fusing the splice or by applying the mechanical connector.
        (ii) Each spliced fiber shall be routed through the organizer tray 
    one at a time as splices are completed. The fibers shall be organized 
    one at a time to prevent tangled spliced fibers. The splice case 
    manufacturer's recommendation shall be followed concerning the splice 
    tray selection.
        (17) Fiber optic testing. Fiber optic testing shall be performed in 
    accordance with RUS Bulletin 345-63, ``RUS Standard for Acceptance 
    Tests and Measurements of Telephone Plant,'' PC-4, (Incorporated by 
    reference at Sec. 1755.97).
        (18) Cable acceptance. Installed cable shall be tested and pass the 
    inventory and acceptance testing specified in the Telephone System 
    Construction Contract (Labor and Materials), RUS Form 515. The tests 
    and inspections shall be witnessed by the borrower's resident project 
    representative.
        (f) Splice arrangements for fiber optic cables--(1) Aerial splices. 
    Cable slack at aerial splices shall be stored either on the messenger 
    strand, on the pole, or inside a pedestal at the base of the pole. A 
    typical arrangement for the storage of slack cable at aerial splices is 
    shown in Figure 9:
    
                                                     BILLING CODE 3410-15-P
    [[Page 5112]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.010
    
    
          
    
    BILLING CODE 3410-15-C
    [[Page 5113]]
    
        (2) Buried splices. Buried splices shall be installed in handholes 
    to accommodate the splice case and the required splicing slack. An 
    alternative to the handhole is a pedestal specifically designed for 
    fiber optic splice cases. Typical arrangements for buried cable splices 
    are shown in Figures 10 and 11:
    
    BILLING CODE 3410-15-P
                                                                           
        [[Page 5114]]
        
    [GRAPHIC][TIFF OMITTED]TR26JA95.011
    
    
    [[Page 5115]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.012
    
    
    BILLING CODE 3410-15-P
    [[Page 5116]]
    
        (3) Underground manhole splices. Underground splices shall be 
    stored in manholes on cable hooks and racks fastened to the manhole 
    wall. The cable slack shall be stored on cable hooks and racks as shown 
    in Figure 12:
    
    BILLING CODE 3410-15-P
    [GRAPHIC][TIFF OMITTED]TR26JA95.013
    
    
    
    BILLING CODE 3410-15-C [[Page 5117]] 
        (4) Central office cable entrance. (i) Filled cable or filled 
    splices are not recommended for use inside central offices except in 
    cable vault locations. Outside plant cable sheath and cable filling 
    compound are susceptible to fire and will support combustion. Fire, 
    smoke, and gases generated by these materials during burning are 
    detrimental to telephone switching equipment.
        (ii) As a first choice, the outside plant fiber optic cable shall 
    be spliced to an all-dielectric fire retardant cable in a cable vault 
    with the all-dielectric cable extending into the central office and 
    terminating inside a fiber patch panel.
        (iii) As a second choice, the outside plant cable may be spliced 
    inside the central office if a flame retardant fiber optic splice case 
    or a noncombustible central office splice housing equipped with 
    organizer trays is used to contain the splice.
        (iv) In cases referenced in paragraphs (f)(4)(ii) and (f)(4)(iii) 
    of this section, as a minimum the fire retardant all-dielectric cable 
    used to provide the connection between the cable entrance splice and 
    the fiber patch panel shall be listed as Communication Riser Cable 
    (Type CMR) in accordance with Sections 800-50 and 800-51(b) of the 1993 
    National Electrical Code.
        (v) Splices inside the central office shall be made as close as 
    practicable to the point where the outside plant cables enter the 
    building. Except in cable vault locations, outside plant cables within 
    the central office shall be wrapped with fireproof tape or enclosed in 
    noncombustible conduit.
        (g) Bonding and grounding fiber optic cable, copper cable, and 
    copper service wire--(1) Bonding. Bonding is electrically connecting 
    two or more metallic items of telephone hardware to maintain a common 
    electrical potential. Bonding may involve connections to another 
    utility.
        (2) Copper cable shield bond connections. (i) Cable shields shall 
    be bonded at each splice location. Only RUS accepted cable shield bond 
    connectors shall be used to provide bonding and grounding connections 
    to metallic cable shields. The shield bond connector manufacturer's 
    instructions shall be followed concerning installation and use.
        (ii) (A) Shield bonding conductors shall be either stranded or 
    braided tinned copper wire equivalent to a minimum No. 6 American Wire 
    Gauge (AWG) and shall be RUS accepted. The conductor connections shall 
    be tinned or of a compatible bimetallic design to avoid corrosion 
    problems associated with dissimilar metals. The number of shield bond 
    connectors required per pair size and gauge shall be as shown in Table 
    8:
    
            Table 8.--Shield Bond Connectors per Pair Size and Gauge        
    ------------------------------------------------------------------------
                             Pair size and gauge                            
       19 AWG    ------------------------------------------   No. of shield 
                     22 AWG        24 AWG        26 AWG      bond connectors
    ------------------------------------------------------------------------
    0-25........     0-100         0-150         0-200                  1   
    50-100......   150-300       200-400       300-600                  2   
    150-200.....   400-600       600-900      900-1500                  3   
    300-600.....  900-1200      1200-2100     1800-3600                 4   
    ------------------------------------------------------------------------
    
        (B) It is permissible to strap across the shield bond connectors of 
    several cables with a single length of braided wire. However, both ends 
    of the braid shall be terminated on the pedestal ground bracket to 
    provide a bonding loop. Shield bond connection methods for individual 
    cables are shown in Figures 13 through 15, and the bonding of several 
    cables inside a pedestal using the bonding loop is shown in Figure 16:
    
                                                     BILLING CODE 3410-15-P
    [[Page 5118]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.014
    
    
    [[Page 5119]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.015
    
    
    [[Page 5120]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.016
    
    
    [[Page 5121]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.017
    
    
          
    
    BILLING CODE 3410-15-C
    [[Page 5122]]
    
        (3) Buried service wire shield bond connections. Buried service 
    wire shields shall be connected to the pedestal bonding and grounding 
    system. Typical buried service wire installations are shown in Figures 
    17 and 18. In addition to the methods referenced in Figures 17 and 18, 
    the shields of buried service wires may also be connected to the 
    pedestal bonding and grounding system using buried service wire bonding 
    harnesses listed on Page 3.3.1, Item ``gs-b,'' of RUS Bulletin 1755I-
    100. RUS Bulletin 1755I-100 may be purchased from the Superintendent of 
    Documents, U.S. Government Printing Office, Washington, DC 20402. When 
    those harnesses are used they shall be installed in accordance with the 
    manufacturer's instructions. Figures 17 and 18 are as follows:
    
                                                     BILLING CODE 3410-15-P
    [[Page 5123]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.018
    
    
    [[Page 5124]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.019
    
    
    
    BILLING CODE 3410-15-C
    [[Page 5125]]
    
        (4) Fiber optic cable bond connections. (i) The cable shield and 
    metallic strength members shall be bonded at each splice location. Only 
    RUS accepted fiber optic cable shield bond connectors shall be used to 
    provide bonding connections to the metallic cable shields. The shield 
    bond connector manufacturer's instructions shall be followed concerning 
    installation and use.
        (ii) Shield bonding conductors shall be either stranded or braided 
    tinned copper wire equivalent to a minimum No. 6 American Wire Gauge 
    (AWG) and shall be RUS accepted. The conductor connections shall be 
    tinned or of a compatible bimetallic design to avoid corrosion problems 
    associated with dissimilar metals.
        (5) Grounding. (i) Grounding is electrically connecting metallic 
    telephone hardware to a National Electrical Safety Code (NESC) 
    acceptable grounding electrode. Acceptable grounding electrodes are 
    defined in the Rule 99A of the NESC.
        (ii) The conductor used for grounding metallic telephone hardware 
    shall be a minimum No. 6 AWG solid, bare, copper conductor.
        (iii) For copper and fiber optic cable plant, all cable shields, 
    all metallic strength members, and all metallic hardware shall be:
        (A) Grounded at each splice location to a driven grounding 
    electrode (ground rod) of:
        (1) At least 1.5 meters (5 feet) in length where the local frost 
    level is normally less than 0.30 meters (1 foot) deep; or
        (2) At least 2.44 meters (8 feet) in length where the local frost 
    level is normally 0.30 meters (1 foot) or deeper; and
        (B) Bonded to a multi-grounded power system neutral when the splice 
    is within 1.8 meters (6 feet) of access to the grounding system of the 
    multi-grounded neutral system. Bonding to the multi-grounded neutral of 
    a parallel power line may help to minimize telephone interference on 
    long exposures with copper cable plant. Consideration, thus, should be 
    given to completing such bonds, at least four (4) times each mile, when 
    splices are greater than 1.8 meters (6 feet) but less than 4.6 meters 
    (15 feet) from access to the multi-grounded neutral.
        (6) Bonding and grounding splice cases. (i) Splice cases are 
    equipped with bonding and grounding devices to ensure that cable 
    shields and metallic strength members maintain electrical continuity 
    during and after cable splicing operations. The splice case 
    manufacturer's recommendations shall be followed concerning the bonding 
    and grounding procedures. Conductors used for bonding shall be either 
    stranded or braided tinned copper wire equivalent to 6 AWG. Conductors 
    used for grounding shall be a solid, bare, copper wire equivalent to 
    minimum No. 6 AWG.
        (ii) Buried splice cases installed in either handholes or pedestals 
    shall be grounded such that the cable shield grounds are attached to a 
    common ground connection that will allow the lifting of a ground on the 
    cable shield in either direction to permit efficient cable locating 
    procedures. As a first choice, buried grounding conductor(s) shall be 
    bare. However, if two or more grounding conductors are buried in the 
    same trench, they shall be insulated to avoid shorts when a locating 
    tone is applied.
        (iii) A typical bonding and grounding method for fiber optic 
    splices is shown in Figure 19:
    
                                                     BILLING CODE 3410-15-P
    [[Page 5126]]
    
    [GRAPHIC][TIFF OMITTED]TR26JA95.020
    
    
    BILLING CODE 3410-15-C [[Page 5127]] 
        (7) Bonding and grounding central office cable entrances. The RUS 
    Telecommunications Engineering and Construction Manual (TE&CM) Section 
    810 provides bonding and grounding guidance for central office cable 
    entrances. Splicing operations shall not be attempted before all 
    metallic cable shield and strength members are bonded and grounded.
    
        Dated: January 18, 1995.
    Bob J. Nash,
    Under Secretary, Rural Economic and Community Development.
    [FR Doc. 95-1937 Filed 1-25-95; 8:45 am]
    BILLING CODE 3410-15-P
    
    

Document Information

Published:
01/26/1995
Department:
Rural Utilities Service
Entry Type:
Rule
Action:
Final rule.
Document Number:
95-1937
Pages:
5096-5127 (32 pages)
PDF File:
95-1937.pdf
CFR: (3)
7 CFR 1755.97
7 CFR 1755.98
7 CFR 1755.200