96-1429. Pictured Rocks National Lakeshore; Availability of Final Environmental Impact Statement
[Federal Register Volume 61, Number 18 (Friday, January 26, 1996)]
[Notices]
[Pages 2529-2530]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-1429]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
National Park Service
Pictured Rocks National Lakeshore; Availability of Final
Environmental Impact Statement
AGENCY: National Park Service, Interior.
[[Page 2530]]
ACTION: Availability of final environmental impact statement for the
proposed Beaver Basin Rim Road at Pictured Rocks National Lakeshore,
Alger County, Michigan.
-----------------------------------------------------------------------
SUMMARY: Pursuant to section 102(2)(c) of the National Environmental
Policy Act (NEPA) of 1969, the National Park Service (NPS) announces
the availability of a final environmental impact statement (FEIS) for
the proposed Beaver Basin Rim Road in Pictured Rocks National
Lakeshore. The draft environmental impact statement for the proposal
was on 60-day public review from January 20 to March 20, 1995.
The NPS proposes to construct a paved road in Pictured Rocks
National Lakeshore along the Beaver Basin Rim. The action is being
proposed in response to a mandate by Congress in section 6 of the Act
of October 15, 1966, 16 U.S.C. 460s-5(b)(1), establishing Pictured
Rocks National Lakeshore, directing the development of a scenic
shoreline drive. The proposed action is also consistent with and would
implement the management directions of the 1981 general management plan
for the national lakeshore. The FEIS was prepared by the NPS.
The NPS's preferred alternative for the Beaver Basin Rim Road is
identified in the FEIS as Alternative B: Shoreline Zone Alignment.
Under the preferred alternative, a 13-mile long paved road would be
constructed in the shoreline zone of Pictured Rocks National Lakeshore.
The proposed road would connect on both ends with Alger County Road H-
58. Two spur roads would be constructed off the main road to two
overlooks. These overlooks would provide views of Beaver Basin, Beaver
Lake, Grand Portal Point, the Sevenmile Creek area, and Lake Superior.
Two other alternatives are also considered: The no action alternative,
and an alternative under which a new paved road would be constructed
within the inland buffer zone of the national lakeshore.
DATES: The 30-day no action period for review of the FEIS will end on
March 2, 1996. A record of decision will follow the no action period.
FOR FURTHER INFORMATION CONTACT: Superintendent, Pictured Rocks
National Lakeshore, Grant Petersen, P.O. Box 40, Munising, Michigan
49862 or telephone 906-387-2607.
Dated: January 16, 1996.
William W. Schenk,
Field Director Midwest Field Area.
[FR Doc. 96-1429 Filed 1-25-96; 8:45 am]
BILLING CODE 4310-70-P
Document Information
- Published:
- 01/26/1996
- Department:
- National Park Service
- Entry Type:
- Notice
- Action:
- Availability of final environmental impact statement for the proposed Beaver Basin Rim Road at Pictured Rocks National Lakeshore, Alger County, Michigan.
- Document Number:
- 96-1429
- Dates:
- The 30-day no action period for review of the FEIS will end on March 2, 1996. A record of decision will follow the no action period.
- Pages:
- 2529-2530 (2 pages)
- PDF File:
-
96-1429.pdf