2023-01488. Premium Energy Holdings, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications  

  • Start Preamble Start Printed Page 4997

    On March 31, 2022, Premium Energy Holdings, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Whale Rock Pumped Storage Hydro Project to be located approximately 0.5 miles east of Cayucos, California in San Luis Obispo County. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.

    The proposed closed-loop project would consist of the following: (1) a new upper reservoir with a normal maximum operating elevation of 1,788 feet average mean sea level, a surface area of 87 acres, and a total storage capacity of 4,780 acre-feet; (2) an existing lower reservoir (Whale Rock Reservoir completed in 1961); (3) a 0.68-mile-long headrace tunnel, 0.16-mile-long vertical shaft, 4.76-mile-long horizontal tunnel, 0.07-mile-long penstock, and 0.99-mile-long tailrace tunnel with a maximum head of 1,558 feet connecting the reservoirs to the powerhouse; (4) a new powerhouse located on land owned by the State of California that would house 4 new pump-turbines rated at 150 megawatts each; (5) a new substation constructed on the southern shore of Lake Nacimiento near the powerhouse connected to the regional electrical utility with either, (6) 7 miles of existing line (upgraded), interconnecting the Morro—Solar 230-kilovolt (kV) transmission line, or 7 miles of existing line (upgraded), interconnecting the Morro—Diablo 230-kV transmission line and 0.5 miles of new right-of-way south of the Baywood substation for the new tap interconnection; and (7) appurtenant facilities. The estimated annual power generation at the Whale Rock Pumped Storage Project would be 1,200,000 megawatt-hours.

    Applicant Contact: Victor M. Rojas, Managing Director, Premium Energy Holdings, LLC. 355 South Lemon Ave., Suite A, Walnut, California 91789; phone: (909) 595-5314; victor.rojas@pehllc.net.

    FERC Contact: Benjamin Mann; email: benjamin.mann@ferc.gov; phone: (202) 502-8127.

    Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36.

    The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission's eFiling system at https://ferconline.ferc.gov/​eFiling.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/​QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P-15272.

    More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of Commission's website at http://www.ferc.gov/​docs-filing/​elibrary.asp. Enter the docket number (P-15272) in the docket number field to access the document. For assistance, contact FERC Online Support.

    Start Signature

    Dated: January 19, 2023.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2023-01488 Filed 1-25-23; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
01/26/2023
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2023-01488
Pages:
4997-4997 (1 pages)
Docket Numbers:
Project No. 15272-000
PDF File:
2023-01488.pdf