98-1788. Safety Standards for Scaffolds Used in the Construction Industry (Aerial Lifts); Effective Date and Office of Management and Budget Control Numbers Under Paperwork Reduction Act  

  • [Federal Register Volume 63, Number 17 (Tuesday, January 27, 1998)]
    [Rules and Regulations]
    [Pages 3813-3814]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-1788]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF LABOR
    
    Occupational Safety and Health Administration
    
    29 CFR Part 1926
    
    [Docket No. S-205]
    RIN 1218-AA40
    
    
    Safety Standards for Scaffolds Used in the Construction Industry 
    (Aerial Lifts); Effective Date and Office of Management and Budget 
    Control Numbers Under Paperwork Reduction Act
    
    AGENCY: Occupational Safety and Health Administration, Labor.
    
    ACTION: Final rule; amendment; announcement of effective date and OMB 
    approval of information collection requirements.
    
    -----------------------------------------------------------------------
    
    SUMMARY: This document announces the effective date of a provision in 
    the Occupational Safety and Health Administration's construction 
    standard for scaffolds that addresses manufacturer certification of 
    ``field modified'' aerial lifts. The document also adds an entry to 
    display that the collection of information has been approved by the 
    Office of Management and Budget under the Paperwork Reduction Act of 
    1995.
    
    EFFECTIVE DATE: The amendment in this final rule and 
    Sec. 1926.453(a)(2), published at 61 FR 46026, are effective January 
    27, 1998.
    
    FOR FURTHER INFORMATION CONTACT:
    Laurence Davey, Directorate of Construction, Occupational Safety and 
    Health Administration, U.S. Department of Labor, Room N-3621, 200 
    Constitution Avenue, NW., Washington, DC 20210, telephone (202) 219-
    7198.
    
    SUPPLEMENTARY INFORMATION: In the August 30, 1996, Federal Register at 
    61 FR 46026, et seq., OSHA revised the standards for scaffolds in 
    construction, codified as subpart L of 29 CFR part 1926. The effective 
    date for the revised subpart was November 29, 1996. However, in that 
    same document, at 61
    
    [[Page 3814]]
    
    FR 46026 and 46103-46104, the Agency announced its intent to request 
    Office of Management and Budget (OMB) approval for a provision 
    addressing aerial lifts in Sec. 1926.453(a)(2). OSHA stated that the 
    effective date for Sec. 1926.453(a)(2) would be announced in the 
    Federal Register at a later date, once OSHA received approval for the 
    information collection requirements in that provision from OMB. The 
    aerial lift provisions contain a requirement for manufacturer 
    certification of ``field modified'' aerial lifts, which was previously 
    codified in Sec. 1926.556, and which was redesignated at 
    Sec. 1926.453(a)(2) in the final rule.
        In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. 
    3501-3520), OMB has approved the information collection and assigned 
    OMB control number 1218-0216, which expires on October 31, 2000. Under 
    5 CFR 1320.5(b), an Agency may not conduct or sponsor a collection of 
    information unless: (1) The collection displays a valid control number, 
    and (2) the agency informs potential persons who may respond to the 
    collections of information that such persons are not required to 
    respond to the collection of information unless it displays a currently 
    valid OMB control number. Accordingly, now that OMB has approved the 
    collections in Sec. 1926.453(a)(2), OSHA is codifying the current OMB 
    control number into Sec. 1926.5, which is the central section in which 
    OSHA displays its approved collections under the Paperwork Reduction 
    Act. The effective date of Sec. 1926.453(a)(2) is January 27, 1998.
    
    Authority and Signature
    
        This document was prepared under the direction of Charles N. 
    Jeffress, Assistant Secretary of Labor for Occupational Safety and 
    Health, U.S. Department of Labor, 200 Constitution Avenue, N.W., 
    Washington, DC 20210.
    
    List of Subjects in 29 CFR Part 1926
    
        Construction; Occupational safety and health; Reporting and 
    recordkeeping requirements.
    
        Signed at Washington, D.C., this 15th day of January, 1998.
    Charles N. Jeffress,
    Assistant Secretary of Labor.
    
        Accordingly, the Occupational Safety and Health Administration 
    amends 29 CFR part 1926 as set forth below.
    
    PART 1926--[AMENDED]
    
        1. The authority citation for subpart A of part 1926 continues to 
    read as follows:
    
        Authority: Section 107, Contract Work Hours and Safety Standards 
    Act (Construction Safety Act) (40 U.S.C. 333); secs. 4, 6, 8, 
    Occupational Safety and Health Act of 1970 (29 U.S.C. 653, 655, 
    657); Secretary of Labor's Order 12-71 (36 FR 8754), 8-76 (41 FR 
    25059), or 1-90 (55 FR 9033), as applicable; 29 CFR part 1911.
    
    
    Sec. 1926.5   [Amended]
    
        2. In Sec. 1926.5, the table is amended by adding the entry
     ``Sec. 1926.453(a)(2)......................................1218-0216''
    in numerical order.
    
    [FR Doc. 98-1788 Filed 1-26-98; 8:45 am]
    BILLING CODE 4510-26-M
    
    
    

Document Information

Effective Date:
1/27/1998
Published:
01/27/1998
Department:
Occupational Safety and Health Administration
Entry Type:
Rule
Action:
Final rule; amendment; announcement of effective date and OMB approval of information collection requirements.
Document Number:
98-1788
Dates:
The amendment in this final rule and Sec. 1926.453(a)(2), published at 61 FR 46026, are effective January 27, 1998.
Pages:
3813-3814 (2 pages)
Docket Numbers:
Docket No. S-205
RINs:
1218-AA40: Scaffolds (Part 1926) (Construction: Safer Scaffolds)
RIN Links:
https://www.federalregister.gov/regulations/1218-AA40/scaffolds-part-1926-construction-safer-scaffolds-
PDF File:
98-1788.pdf
CFR: (2)
29 CFR 1926.453(a)(2)
29 CFR 1926.5