2021-01651. Notice of Final Federal Agency Actions on Proposed Highway in Utah  

  • Start Preamble

    AGENCY:

    Utah Department of Transportation (UDOT), Federal Highway Administration (FHWA), Department of Transportation.

    ACTION:

    Notice of limitation on claims for judicial review of actions by UDOT.

    SUMMARY:

    The FHWA, on behalf of UDOT, is issuing this notice to announce actions taken by UDOT that are final Federal agency actions. The final agency actions relate to a proposed highway project that includes modifications to the existing interchange on Interstate 15 (I-15) between approximate mileposts 337.5 and 339, at State Route 97 (5600 South); and roadway widening of 5600 South in Roy City, Weber County, Utah. Those actions grant licenses, permits and/or approvals for the project. UDOT's Finding of No Significant Impact provides details on the Selected Alternative for the proposed improvements.

    DATES:

    By this notice, FHWA, on behalf of UDOT, is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before June 28, 2021. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Elisa Albury, Environmental Program Manager, UDOT Environmental Services, P.O. Box 143600, Salt Lake City, UT 84114; (801) 965-4000; email: ealbury@utah.gov. UDOT's normal business hours are 8 a.m. to 5 p.m. (Mountain Time Zone), Monday through Friday, except State and Federal holidays.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Effective January 17, 2017, FHWA assigned to UDOT certain responsibilities of FHWA for environmental review, consultation, and other actions required by applicable Federal environmental laws and regulations for highway projects in Utah, pursuant to 23 U.S.C. 327. Actions taken by UDOT on FHWA's behalf pursuant to 23 U.S.C. 327 constitute Federal agency actions for purposes of Federal law. Notice is hereby given that UDOT has taken final agency actions subject to 23 U.S.C. 139(l)(1) by issuing licenses, permits, and/or approvals for the 5600 South project in the State of Utah.

    The project proposes to modify an existing interchange on I-15 at 5600 South and to widen and improve 5600 South for the purposes of meeting future 2050 travel demand, and improving safety conditions in Roy City, Weber County, Utah. Planned improvements include additional lanes, bicyclist and pedestrian facilities on 5600 South between the interchange and approximately 3500 West; realignment of Freeway Park Drive; and bridge and flyover construction and improvements to existing bridges at the interchange. The project is included in UDOT's adopted 2021-2026 State Transportation Improvement Plan (STIP) as project number S-I15-8(159)338; PIN 15685. The project is also included in the Wasatch Front Regional Council's 2019-2050 Regional Transportation Plan.

    The actions by UDOT and the laws under which such actions were taken are described in the 5600 South Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) approved on December 17, 2020, and other documents in the UDOT project records. The EA and the FONSI are available for review by contacting UDOT at the address provided above. In addition, these documents can be viewed and downloaded from the UDOT project website at https://www.udot.utah.gov/​5600SouthEA/​. This notice applies to the EA, the FONSI, the Start Printed Page 7334determination pursuant to Section 4(f) of the Department of Transportation Act of 1966, the determinations pursuant to Section 106 of the National Preservation Act of 1966, and all other UDOT and other federal agency decisions and other actions with respect to the project as of the issuance date of this notice and all laws under which such actions were taken, including but not limited to the following laws (including their implementing regulations):

    1. General: National Environmental Policy Act [42 U.S.C. 4321-4351]; Federal-Aid Highway Act [23 U.S.C. 109 and 23 U.S.C. 128]; MAP-21, the Moving Ahead for Progress in the 21st Century Act [Pub. L. 112-141].

    2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)].

    3. Land: Section 4(f) of the Department of Transportation Act of 1966 [23 U.S.C. 138 and 49 U.S.C. 303]; Landscaping and Scenic Enhancement (Wildflowers) [23 U.S.C. 319].

    4. Wildlife: Endangered Species Act [16 U.S.C. 1531-1544 and Section 1536], Fish and Wildlife Coordination Act [16 U.S.C. 661-667(d)]; Migratory Bird Treaty Act [16 U.S.C. 703-712]; The Bald and Golden Eagle Protection Act [16 U.S.C. 668].

    5. Historic and Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended [54 U.S.C. 300101 et seq.]; Archeological Resources Protection Act of 1977 [16 U.S.C. 470(aa)-470(ll)]; Archeological and Historic Preservation Act [16 U.S.C. 469-469(c)]; Native American Grave Protection and Repatriation Act (NAGPRA) [25 U.S.C 3002-3013].

    6. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 2000(d)-2000(d)(1)]; American Indian Religious Freedom Act [42 U.S.C. 1996]; Farmland Protection Policy Act (FPPA) [7 U.S.C. 4201-4209].

    7. Wetlands and Water Resources: Clean Water Act (Section 404, Section 401, Section 319) [33 U.S.C. 1251-1377]; Safe Drinking Water Act (SDWA) [42 U.S.C. 300(f)-300(j)(6)]; Rivers and Harbors Act of 1899 [33 U.S.C. 401-406]; Emergency Wetlands Resources Act [16 U.S.C. 3921, 3931]; TEA-21 Wetlands Mitigation [23 U.S.C. 103(b)(6)(M, 133(b)(11)]; Flood Disaster Protection Act [42 U.S.C. 4001-4128].

    8. Hazardous Materials: Comprehensive Environmental Response, Compensation, and Liability Act [42 U.S.C. 9601-9675]; Superfund Amendments and Reauthorization Act of 1986; Resource Conservation and Recovery Act [42 U.S.C. 6901-6992(k)].

    9. Noise: Federal-Aid Highway Act of 1970, Public Law 91-605 [84 Stat. 1713].

    10. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 Floodplain Management; E.O. 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations; E.O. 11593 Protection and Enhancement of Cultural Resources; E.O. 13287 Preserve America; E.O. 13175 Consultation and Coordination with Indian Tribal Governments; E.O. 11514 Protection and Enhancement of Environmental Quality; E.O. 13112 Invasive Species.

    (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction. The regulations implementing Executive Order 12372 regarding intergovernmental consultation on Federal programs and activities apply to this program.)

    Start Authority

    Authority: 23 U.S.C. 139(l)(1)

    End Authority Start Signature

    Issued on: January 19, 2021.

    Ivan Marrero,

    Division Administrator, Federal Highway Administration, Salt Lake City, Utah.

    End Signature End Supplemental Information

    [FR Doc. 2021-01651 Filed 1-26-21; 8:45 am]

    BILLING CODE 4910-RY-P

Document Information

Published:
01/27/2021
Department:
Federal Highway Administration
Entry Type:
Notice
Action:
Notice of limitation on claims for judicial review of actions by UDOT.
Document Number:
2021-01651
Dates:
By this notice, FHWA, on behalf of UDOT, is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before June 28, 2021. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies.
Pages:
7333-7334 (2 pages)
PDF File:
2021-01651.pdf
Supporting Documents:
» Final Federal Agency Actions: Proposed Highway in California
» Final Federal Agency Actions: Proposed Highway Projects in Texas
» Transfer and Sanction Programs
» Experimental Project To Evaluate Proposals for Delegation of Certain Program-Wide FHWA Responsibilities to States
» Environmental Impact Statements; Availability, etc.: Multiple Counties in Alabama; Rescission
» Federal Agency Actions: SH 205 From North of John King (Rockwall County Line) to SH 78 in Collin County, TX
» Federal Agency Actions: Interstate 95 in City of Fredericksburg and Counties of Spotsylvania, Stafford, Prince William, and Fairfax, VA
» Environmental Impact Statements; Availability, etc.: I-495 and I-270 Managed Lanes Study, Montgomery and Prince George's Counties, MD and Fairfax County, VA
» Federal Agency Actions: Proposed Highway in California
» Federal Agency Actions: California; Proposed Highway