99-1953. Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions  

  • [Federal Register Volume 64, Number 18 (Thursday, January 28, 1999)]
    [Notices]
    [Page 4412]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-1953]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Application Ready for Environmental Analysis and 
    Soliciting Comments, Recommendations, Terms and Conditions, and 
    Prescriptions
    
    January 22, 1999.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: New Minor License.
        b. Project No.: 597-003.
        c. Date filed: June 24, 1998.
        d. Applicant: PacificCorp.
        e. Name of Project: Stairs Hydroelectric Project.
        f. Location: On Big Cottonwood Creek in Big Cottonwood Canyon, Salt 
    Lake County, near the town of Sandy, about 15 miles southeast of 
    downtown Salt Lake City, Utah. The project affects federal lands within 
    the Wasatch-Cache National Forest.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
        h. Applicant Contact: Michael B. Burke, Project Manager, 
    PacificCorp, 910 S.W. Sixth Avenue, 610PSB, Portland, Oregon, 97204, 
    (503) 464-5344.
        i. FERC Contact: Any questions on this notice should be addressed 
    to Gaylord W. Hoisington, E-mail address 
    gaylord.hoisington@ferc.fed.us, or telephone (202) 219-2756.
        j. Deadline for filing comments, recommendations, terms and 
    conditions, and prescriptions: 60 days from the issuance date of this 
    notice.
        All documents (original and eight copies) should be filed with: 
    David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
    First Street, NE, Washington, DC 20426.
        The Commission's Rules of Practice and Procedure require all 
    intervenors filing documents with the Commission to serve a copy of 
    that document on each person whose name appears on the official service 
    list for the project. Further, if an intervenor files comments or 
    documents with the Commission relating to the merits of an issue that 
    may affect the responsibilities of a particular resource agency, they 
    must also serve a copy of the document on that resource agency.
        k. Status of environmental analysis: This application has been 
    accepted for filing and is ready for environmental analysis at this 
    time.
        l. Description of the Project: The existing project consists of: 
    (1) a 150-foot-long and 35-foot-high earth-fill diversion dam; (2) a 
    reinforced concrete spillway; (3) a reinforced concrete intake 
    structure; (4) a 2,850-foot-long penstock; (5) a 100-foot-wide by 35-
    foot-long masonry powerhouse; (6) one Francis turbine generator with a 
    rated capacity of 1,200 kilowatts; (7) a 7-foot-wide by 5.3-foot-deep 
    reinforced concrete tailrace; and (8) other appurtenances. No new 
    construction is planned.
        m. Locations of the application: A copy of the application is 
    available for inspection and reproduction at the Commission's Public 
    Reference Room, located at 888 First Street, NE, Room 2A, Washington, 
    DC 20426, or by calling (202) 208-1371. The application may be viewed 
    on the web at www.ferc.fed.us. Call (202) 208-2222 for assistance. A 
    copy is also available for inspection and reproduction at the address 
    in item h above.
        n. This notice also consists of the following standard paragraphs: 
    B, and D6.
        B. Comments, Protests, or Motions to Intervene--Anyone may submit 
    comments, a protest, or a motion to intervene in accordance with the 
    requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
    .214. In determining the appropriate action to take, the Commission 
    will consider all protests or other comments filed, but only those who 
    file a motion to intervene in accordance with the Commission's rules 
    may become a party to the proceeding. Any comments, protests, or 
    motions to intervene must be received on or before the specified 
    comment date for the particular application.
        D6. Filing and Service of Responsive Documents--The application is 
    ready for environmental analysis at this time, and the Commission is 
    requesting comments, reply comments, recommendations, terms and 
    conditions, and prescriptions.
        The Commission directs, pursuant to Section 4.34(b) of the 
    Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 
    1991) that all comments, recommendations, terms and conditions and 
    prescriptions concerning the application be filed with the Commission 
    within 60 days from the issuance date of this notice. All reply 
    comments must be filed with the Commission within 105 days from the 
    date of this notice.
        Anyone may obtain an extension of time for these deadlines from the 
    Commission only upon a showing of good cause or extraordinary 
    circumstances in accordance with 18 CFR 385.2008.
        All filings must (1) bear in all capital letters the title 
    ``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS'', ``REPLY COMMENTS'', 
    ``RECOMMENDATIONS'', ``TERMS AND CONDITIONS'', or ``PRESCRIPTIONS''; 
    (2) set forth in the heading the name of the applicant and the project 
    number of the application to which the filing responds; (3) furnish the 
    name, address, and telephone number of the person protesting or 
    intervening; and (4) otherwise comply with the requirements of 18 CFR 
    385.2001 through 385.2005. All comments, recommendations, terms and 
    conditions or prescriptions must set forth their evidentiary basis and 
    otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
    obtain copies of the application directly from the applicant. Any of 
    these documents must be filed by providing the original and the number 
    of copies required by the Commission's regulations to: The Secretary, 
    Federal Energy Regulatory Commission, 888 First Street, NE, Washington, 
    DC 20426. An additional copy must be sent to Director, Division of 
    Project Review, Office of Hydropower Licensing, Federal Energy 
    Regulatory Commission, at the above address. A copy of any protest or 
    motion to intervene must be served upon each representative of the 
    applicant specified in the particular application. A copy of all other 
    filings in reference to this application must be accompanied by proof 
    of service on all persons listed in the service list prepared by the 
    Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
    385.2010.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-1953 Filed 1-27-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
01/28/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-1953
Pages:
4412-4412 (1 pages)
PDF File:
99-1953.pdf