-
Start Preamble
AGENCY:
Surface Transportation Board.
ACTION:
Proposed adoption of a Railroad Cost Recovery Procedures productivity adjustment.
SUMMARY:
The Surface Transportation Board proposes to adopt 1.035 (3.5%) as the measure of average growth in railroad productivity for the 1994-1998 (5-year) period. The current value of 5.7% was developed for the 1993 to 1997 period.
DATES:
Comments are due by February 11, 2000.
EFFECTIVE DATE:
The proposed productivity adjustment is effective 30 days after the date of service.
ADDRESSES:
Send comments (an original and 10 copies) referring to STB Ex Parte No. 290 (Sub-No. 4) to: Office of the Secretary, Case Control Branch, 1925 K Street, NW, Washington, DC 20423-0001. Parties should submit all pleading and attachments on a 3.5-inch diskette in WordPerfect 6.0 or 6.1 compatible format.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
H. Jeff Warren, (202) 565-1533. TDD for the hearing impaired: (202) 565-1695.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Additional information is contained in the Board's decision. To purchase a copy of the full decision write to, call, or pick up in person from: DA•TO•DA OFFICE SOLUTIONS, Suite 210, 1925 K Street, NW, Washington, DC 20423-0001, telephone (202) 289-4357. [Assistance for the hearing impaired is available through TDD services (202) 565-1695.]
This action will not significantly affect either the quality of the human environment or energy conservation.
Pursuant to 5 U.S.C. 605(b), we conclude that our action will not have a significant economic impact on a substantial number of small entities within the meaning of the Regulatory Flexibility Act.
Start SignatureDecided: January 21, 2000.
By the Board, Chairman Morgan, Vice Chairman Burkes, and Commissioner Clyburn.
Vernon A. Williams,
Secretary.
[FR Doc. 00-1998 Filed 1-27-00; 8:45 am]
BILLING CODE 4915-00-P
Document Information
- Published:
- 01/28/2000
- Department:
- Surface Transportation Board
- Entry Type:
- Notice
- Action:
- Proposed adoption of a Railroad Cost Recovery Procedures productivity adjustment.
- Document Number:
- 00-1998
- Dates:
- Comments are due by February 11, 2000.
- Pages:
- 4568-4568 (1 pages)
- Docket Numbers:
- STB Ex Parte No. 290 (Sub No. 4)
- PDF File:
- 00-1998.pdf