E8-1365. Proposed Agency Information Collection Activities; Comment Request  

  • Start Preamble

    AGENCY:

    Federal Railroad Administration, DOT.

    ACTION:

    Notice and request for comments.

    SUMMARY:

    In compliance with the Paperwork Reduction Act of 1995 (44 U.S.C. 3501, et seq.), this notice announces that the Information Collection Requirements (ICRs) abstracted below have been forwarded to the Office of Management and Budget (OMB) for review and comment. The ICRs describes the nature of the information collections and their expected burdens. The Federal Register notice with a 60-day comment period soliciting comments on the following collections of information was published on November 19, 2007 (72 FR 65128).

    DATES:

    Comments must be submitted on or before February 27, 2008.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Robert Brogan, Office of Planning and Evaluation Division, RRS-21, Federal Railroad Administration, 1200 New Jersey Ave., SE., Mail Stop 25, Washington, DC 20590 (telephone: (202) 493-6292), or Ms. Gina Christodoulou, Office of Support Systems Staff, RAD-43, Federal Railroad Administration, 1200 New Jersey Ave., SE., Mail Stop 35, Washington, DC 20590 (telephone: (202) 493-6139). (These telephone numbers are not toll-free.)

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Paperwork Reduction Act of 1995 (PRA), Public Law No. 104-13, § 2, 109 Stat. 163 (1995) (codified as revised at 44 U.S.C. 3501-3520), and its implementing regulations, 5 CFR Part 1320, require Federal agencies to issue two notices seeking public comment on information collection activities before OMB may approve paperwork packages. 44 U.S.C. 3506, 3507; 5 CFR 1320.5, 1320.8(d)(1), 1320.12. On November 19, 2007, FRA published a 60-day notice in the Federal Register soliciting comment on ICRs that the agency was seeking OMB approval. 72 FR 65128. FRA received no comments after issuing this notice. Accordingly, DOT announces that these information collection activities have been re-evaluated and certified under 5 CFR 1320.5(a) and forwarded to OMB for review and approval pursuant to 5 CFR 1320.12(c).

    Before OMB decides whether to approve these proposed collections of information, it must provide 30 days for public comment. 44 U.S.C. 3507(b); 5 CFR 1320.12(d). Federal law requires OMB to approve or disapprove paperwork packages between 30 and 60 days after the 30 day notice is published. 44 U.S.C. 3507 (b)-(c); 5 CFR 1320.12(d); see also 60 FR 44978, 44983, Aug. 29, 1995. OMB believes that the 30 day notice informs the regulated community to file relevant comments and affords the agency adequate time to digest public comments before it renders a decision. 60 FR 44983, Aug. 29, 1995. Therefore, respondents should submit their respective comments to OMB within 30 days of publication to best ensure having their full effect. 5 CFR 1320.12(c); see also 60 FR 44983, Aug. 29, 1995.

    The summary below describes the nature of the information collection requirements (ICRs) and the expected burden. The proposed requirements are being submitted for clearance by OMB as required by the PRA.

    Title: Safety Integration Plans.

    OMB Control Number: 2130-0557.

    Type of Request: Extension of a currently approved collection.

    Affected Public: Railroads.

    Form(s): N/A. Start Printed Page 4944

    Abstract: The Federal Railroad Administration (FRA) and the Surface Transportation Board (STB), working in conjunction with each other, issued joint final rules establishing procedures for the development and implementation of safety integration plans (“SIPs” or “plans”) by a Class I railroad proposing to engage in certain specified merger, consolidation, or acquisition of control transactions with another Class I railroad, or a Class II railroad with which it proposes to amalgamate operations. The scope of the transactions covered under the two rules is the same. FRA uses the information collected, notably the required SIPs, to maintain and promote a safe rail environment by ensuring that affected railroads (Class I's and some Class II's) address critical safety issues unique to the amalgamation of large, complex railroad operations.

    Annual Estimated Burden Hours: 528 hours.

    Title: Locomotive Crashworthiness.

    OMB Control Number: 2130-0564.

    Type of Request: Extension of a currently approved collection.

    Affected Public: Railroads.

    Form(s): N/A.

    Abstract: In a final rule published June 28, 2006, the Federal Railroad Administration (FRA) issued comprehensive standards for locomotive crashworthiness. These crashworthiness standards are intended to help protect locomotive cab occupants in the event of a locomotive collision. The collection of information is used by FRA to ensure that locomotive manufacturers and railroads meet minimum performance standards and design load requirements for newly manufactured and re-manufactured locomotives in order to help protect locomotive cab occupants in the event that one of these covered locomotives collides with another locomotive, the rear of another train, a piece of on-track equipment, a shifted load on a freight car on an adjacent parallel track, or a highway vehicle at a rail-highway grade crossing.

    Annual Estimated Burden Hours: 6,672 hours.

    Title: Safety Appliance Concern Recommendation Report; Guidance Checklist Forms.

    OMB Control Number: 2130-0565.

    Type of Request: Extension of a currently approved collection.

    Affected Public: Railroads.

    Form(s): FRA F 6180.4(a)-(q).

    Abstract: In an ongoing effort to conduct more thorough and more effective inspections of railroad freight equipment and to further enhance safe rail operations, FRA has developed a safety concern recommendation report form, and a group of guidance checklist forms that facilitate railroad, rail car owner, and rail equipment manufacturer compliance with agency Railroad Safety Appliance Standards regulations. In lieu of completing an official inspection report (Form FRA F 6180.96), which takes subject railroad equipment out of service and disrupts rail operations, Form FRA F 6180.4(a) enables Federal and State safety inspectors to report to agency headquarters systemic or other safety concerns. FRA headquarters safety specialists can then contact railroads, car owners, and equipment manufacturers to address the reported issue(s) and institute necessary corrective action(s) in a timely fashion without unnecessarily having to take affected rail equipment out of service, unless deemed defective. Forms FRA F 6180.4(b)-(q) are used in conjunction with the Special Inspection of Safety Appliance Equipment form (Form FRA F 6180.4) to assist Federal Motive, Power, and Equipment (MP&E) field inspectors in ensuring that critical sections of 49 CFR Part 231 (Railroad Safety Appliance Standards), pertaining to various types of freight equipment, are complied with through use of a check-off list. By simplifying their demanding work, check-off lists for 16 essential sections of Part 231 ensure that FRA MP&E field personnel completely and thoroughly inspect each type of freight car for compliance with its corresponding section in Part 231. The Guidance Checklist forms may later be used by state field inspectors as well. FRA believes that this collection of information will result in improved construction of newly designed freight cars and improved field inspections of all freight cars currently in use. This, in turn, will serve to reduce the number of accidents/incidents and corresponding injuries and fatalities that occur every year due to unsafe or defective equipment that was not promptly repaired/replaced.

    Annual Estimated Burden Hours: 182 hours.

    Addressee: Send comments regarding these information collections to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 Seventeenth Street, NW., Washington, DC 20503, Attention: FRA Desk Officer, or via e-mail to OMB at the following address: oira_submissions@omb.eop.gov.

    Comments are invited on the following: Whether the proposed collections of information are necessary for the proper performance of the functions of the Department, including whether the information will have practical utility; the accuracy of the Department's estimates of the burden of the proposed information collections; ways to enhance the quality, utility, and clarity of the information to be collected; and ways to minimize the burden of the collections of information on respondents, including the use of automated collection techniques or other forms of information technology.

    A comment to OMB is best assured of having its full effect if OMB receives it within 30 days of publication of this notice in the Federal Register.

    Start Authority

    Authority: 44 U.S.C. 3501-3520.

    End Authority Start Signature

    Issued in Washington, DC on January 22, 2008.

    D.J. Stadtler,

    Director, Office of Financial Management, Federal Railroad Administration.

    End Signature End Supplemental Information

    [FR Doc. E8-1365 Filed 1-25-08; 8:45 am]

    BILLING CODE 4910-06-P

Document Information

Published:
01/28/2008
Department:
Federal Railroad Administration
Entry Type:
Notice
Action:
Notice and request for comments.
Document Number:
E8-1365
Dates:
Comments must be submitted on or before February 27, 2008.
Pages:
4943-4944 (2 pages)
PDF File:
e8-1365.pdf