96-1486. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 19 (Monday, January 29, 1996)]
    [Notices]
    [Page 2817]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-1486]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-136-000]
    
    
    NorAm Gas Transmission Company; Notice of Request Under Blanket 
    Authorization
    
    January 23, 1996.
        Take notice that on January 16, 1996, NorAm Gas Transmission 
    Company (NGT), 1600 Smith Street, Houston, Texas 77002, filed a request 
    with the Commission in Docket No. CP96-136-000 pursuant to Sections 
    157.205 and 157.211 of the Commission's Regulations under the Natural 
    Gas Act (NGA) to construct and operate certain facilities in Logan 
    County, Arkansas, authorized in blanket certificate issued in Docket 
    No. CP82-384-000 and CP82-284-001, all as more fully set forth in the 
    request on file with the Commission and open to public inspection.
        NGT proposes to construct and operate a 2-inch tap and 1-inch 
    first-cut regulator on NGT's Line BT-14 in Section 29,Township 8 North, 
    Range 25 West, Logan County, Arkansas. NGT states that the gas would be 
    delivered to ARKLA, a distribution division of NorAm Energy Crop. 
    (AKRLA). NGT further states that the volumes to be delivered to this 
    meter station would be approximately 600 MMBtu annually and 2.5 MMBtu 
    on a peak day. The estimated cost of construction of the tap and first-
    cut regulator would be $2,700, which would be reimbursed by ARKLA.
        Any person or the Commission's staff may, within 45 days after the 
    Commission has issued this notice, file pursuant to Rule 214 of the 
    Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or 
    notice of intervention and pursuant to Section 157.205 of the 
    Regulations under the NGA (18 CFR 157.205) a protest to the request. If 
    no protest is filed within the allowed time, the proposed activity 
    shall be deemed to be authorized effective the day after the time 
    allowed for filing a protest. If a protest is filed and not withdrawn 
    within 30 days after the time allowed for filing a protest, the instant 
    request shall be treated as an application for authorization pursuant 
    to Section 7 of the NGA.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-1486 Filed 1-26-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
01/29/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-1486
Pages:
2817-2817 (1 pages)
Docket Numbers:
Docket No. CP96-136-000
PDF File:
96-1486.pdf